First Notice | | 3/17/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
Permanent Occupancy | | | 3/7/2018 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed for project scope of work.
Lee Phone #: ###-####
|
BLD-Final | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PASS |
Jim Storey
|
|
|
Lee Phone #: ###-####
|
DOC - Permit Finaled | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Jim Storey
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/16/2018 | | DONE |
|
|
|
should not have been finaled. customer called in for fire life saftey
|
BLD-Final | 12/15/2017 | 12/18/2017 | 12/18/2017 | A | FAIL |
Jim Storey
|
|
|
Please call ahead for access // Fireproofing & Final - Lee Phone #: ###-#### ele conduit blocking covrage of fire prooffing/ patches needed// si required need reports/ handrails required both exit stairs.
|
FIRE-Final Inspection | 12/15/2017 | 12/18/2017 | 12/18/2017 | A | CANC |
Troy Cobbley
|
|
|
Please call ahead for access - Lee Phone #: ###-####
|
BLD-Aging Inspection | 9/6/2017 | 9/6/2017 | 9/14/2017 | | CANC |
Jim Storey
|
|
|
|
BLD-Ceiling Grid Inspection | 9/6/2017 | 9/6/2017 | 9/6/2017 | P | PART |
Brandon Shaw
|
|
|
Lee Phone #: ###-####
|
FIRE-Final Inspection | 4/21/2017 | 4/24/2017 | 4/24/2017 | A | PART |
Troy Cobbley
|
|
|
Life safety for Phase II passed.
Lee Phone #: ###-####
|
BLD-Conference | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Jim Storey
|
|
|
Lee Phone #: ###-#### wip ok time line dec to march with equment instal/ stairs and fireprooffing to proceed aprox jan.
|
Telephone call | | | 11/14/2016 | | DONE |
|
|
|
Left a message for Martin informing him that this permit is going to expire in 23 days, showing that it had a plan mod done and there are fees due. Informed him I tried to call Industiral Builders, but the number given is not their number.
|
CHANGE STATUS TO (ISS) | | | 11/14/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/14/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/15/2016 | 7/15/2016 | 7/18/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 7/15/2016 | | 7/18/2016 | | PASS |
Carl Westfall
|
|
|
Plan mod approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/18/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Plan Modification Accepted | | | 7/15/2016 | | DONE |
Christina Prado
|
|
|
Plan Mod requested to change location of interior doorway
|
BLD-Framing/Rough-in | 6/9/2016 | 6/10/2016 | 6/10/2016 | A | PASS |
Jim Storey
|
|
|
Lee Phone #: ###-#### entry wall ok/
|
FIRE-Final Inspection | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | PASS |
Troy Cobbley
|
|
|
Phase 1 life safety passed.
|
FIRE-Final Inspection | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | FAIL |
Troy Cobbley
|
|
|
The most up to date plans were not on site and neither were the small documents.
|
FIRE-Final Inspection | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final inspection nor is the first phase of work. Need fire alarm and fire sprinkler work called in for inspection. I noted that the smoke detector and ceiling mounted horn/strobe is overspaced. Lee Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/29/2016 | 5/2/2016 | 5/2/2016 | P | PASS |
Jim Storey
|
|
|
Lee Phone #: ###-####
|
BLD-Framing/Rough-in | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Jim Storey
|
|
|
CBRA Rm, baggage handling area, call for access - Lee Phone #: ###-#### interior wall ok to cover
|
Print Occupancy Form | | | 1/22/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/22/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/13/2016 | 1/13/2016 | 1/20/2016 | | PASS |
Carl Westfall
|
|
|
plan mod
|
Routing - PLAN CHECK | 1/18/2016 | | 1/20/2016 | | PASS |
Carl Westfall
|
|
|
The proposed phasing schedule was approved. This was not really a plan mod since the permit had not been issued. No additional fees required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/20/2016 | | DONE |
Christina Prado
|
|
|
Need GC form & revised certificate of value for issuance
|
Plan Modification Accepted | | | 1/18/2016 | | DONE |
Carl Westfall
|
|
|
Work flow in ePlanReview received. This is not really a plan mod since the permit had not been issued yet.
|
Plan Modification Accepted | | | 1/13/2016 | | DONE |
Christina Prado
|
|
|
Resubmittal requested to add additional phasing plans and temporary locations
|
Extend Review Timeline | | | 9/1/2015 | | DONE |
|
|
|
Final extension. 180 days granted by JCB. See attached documents.
|
Expiration Notice | 8/27/2015 | 9/18/2015 | 8/27/2015 | | DONE |
Brittany Hill
|
|
|
|
Extend Review Timeline | | | 3/12/2015 | | DONE |
Christina Prado
|
|
|
180 day extension granted per JCB
|
Expiration Notice | 3/2/2015 | 3/23/2015 | 3/2/2015 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 12/19/2014 | 12/19/2014 | 1/23/2015 | | PASS |
Carl Westfall
|
|
|
CBRA ROOM (BOISE AIRPORT) - Level 3 TI - ePlanReview - (15 days - Jan 6)
|
Plan resubmittals received | | | 1/23/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/23/2015 | | 1/23/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with redlines
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/23/2015 | | DONE |
Christina Prado
|
|
|
Need revised cert of value & GC form
|
Routing - PLAN CHECK | 12/19/2014 | | 1/12/2015 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Plan resubmittals requested | | | 1/12/2015 | | DONE |
Carl Westfall
|
|
|
|
1st review completed | | | 1/12/2015 | | DONE |
Carl Westfall
|
|
|
Failed building
|
Routing - FIRE | 12/19/2014 | 12/19/2014 | 12/23/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Pending Assignment by JCB | 12/19/2014 | | 12/19/2014 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 12/17/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Intake Approval | | | 9/26/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
1. Please upload your structural calculations into documents it appears they did not load.
2. Please submit your 310 form completed by the engineer and signed by the owner for the special inspections required for this project. See structural sheet and IBC chapter 17.
|
Application received | | | 9/22/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 22 2014 4:46PM
|