Permit Information
Permit NumberBLD16-01697
StatusFinaled
Name Brian Gross
Site Address 2940 S FIVE MILE RD
Project NameFive Mile Farms & Greenhouse
Customer Number 
ePlanReview 
Description
**(FIVE MILE FARM & GREENHOUSE)** //Plan modifications to grading and drainage plans. 3-22-17 JG// To construct a new 1,872 sq. ft. (26’ x 72’) one story greenhouse building. The greenhouse is a pre-engineered metal pole building with polycarbonate covering. Approval is contingent upon adhering to the approved plans on file, the attached plan review report and attached engineering. This building is not fire sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/9/2018 DONE
sent 1st late notice
Print Statement  10/9/2017 DONE
First Notice 9/17/20179/25/2017 DONE
Permanent Occupancy  9/7/2017 DONE
BLD-Final7/19/20177/21/20177/21/2017APASS
DetailsMike Jordan
Brian Gross Phone #: ###-####
FIRE-Final Inspection5/31/20176/1/20176/1/2017APASS
DetailsTroy Cobbley
life safety passed
(F) Reprint permit  5/31/2017 DONE
CHANGE STATUS TO (ISS)  5/31/2017 DONE
Plan assigned to (JG)3/17/20173/17/20173/27/2017 PASS
DetailsJavier Guzman
Plan mod Five Mile Farms & Greenhouse Paper
Routing - PLAN CHECK3/17/2017 3/27/2017 PASS
DetailsJavier Guzman
Case Summary (BLD)  3/27/2017 DONE
DetailsJavier Guzman
Permit Ready to Issue  3/27/2017 DONE
DO NOT REISSUE PLAN MOD
Print Occupancy Form  3/27/2017 DONE
Telephone call  3/27/2017 DONE
Spoke with Jon informing him that his plan mod is complete and the fee amount due
PubWorks Occupancy Approval3/24/20173/24/20173/24/2017 DONE
DetailsTiffany Lowery
Routing PW Drainage3/22/2017 3/24/2017 PASS
DetailsBrian Murphy
Resubmittals approved. JCT
Plan Modification Accepted  3/17/2017 DONE
grading plans have been submitted
BLD-Conference3/6/20173/7/20173/7/2017ADONE
DetailsMike Jordan
Brian Phone #: ###-####. Needs city approved plans. Noted to Brian that he will need electrical, fire/life/safety and public works finals as well.
BLD-Footing12/12/201612/13/201612/13/2016APASS
DetailsMike Jordan
Mike Phone #: ###-####
Plan assigned to (JG)9/6/20169/6/201610/7/2016 PASS
DetailsJavier Guzman
1st review completed, 10/03 L3 New Production Greenhouse
Routing - PLAN CHECK10/7/2016 10/7/2016 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL10/7/2016 10/7/2016 PASS
DetailsJavier Guzman
resubmittals showed the design method on the plan sheets as requested by the off site engineer
Case Summary (BLD)  10/7/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/7/2016 DONE
Permit Ready to Issue  10/7/2016 DONE
***all requirments met 10-7-16 /CEV

***received RP still Need RP, GC & rev cert of val
Print Occupancy Form  10/7/2016 DONE
Telephone call  10/7/2016 DONE
called brian- left message that permit is ready, still need GC form, certificate of value, and RP
Issue PAID IN FULL permit  10/7/2016 DONE
Plan resubmittals received  10/6/2016 DONE
received two copies of structural analysis, and sheets C-13319 & C-13320- gave to Javier
Route to Impact Fee Review9/29/201610/2/20169/29/2016 PASS
DetailsCindy M. Gould
1st review completed  9/29/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL9/6/2016 9/29/2016 FAIL
DetailsJavier Guzman
Failed egineering review with AHJ by Tiffany Curtis
Routing - PLAN CHECK  9/29/2016 FAIL
DetailsJavier Guzman
need to pass engineering
Routing - FIRE9/26/20169/6/20169/28/2016 PASS
DetailsKatie Marron
No comments required.
Routing - Erosion and Sediment9/23/2016 9/26/2016 PASS
DetailsAndy J. Long
ESC site map and narrative approved. Vald PD, RP to be determined. Site preparation inspection REQUIRED, call ###-####.
Routing - MECHANICAL  9/26/2016 PASS
DetailsTroy James
no mechanical to review
Routing - PLANNING9/23/2016 9/23/2016 PASS
DetailsLeon Letson
CUP16-00060
Routing - PUBLIC WORKS9/8/2016 9/23/2016 PASS
DetailsRachael Beierle
Routing PW Drainage9/8/2016 9/22/2016 PASS
DetailsBrian Murphy
Routing PW Sewer Rating9/8/2016 9/8/2016 PASS
DetailsRachael Beierle
Routing - Addressing9/7/2016 9/8/2016 PASS
DetailsLaura Hunter
Routing - PLANNING Land Div9/6/2016 9/7/2016 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  9/6/2016 DONE
Intake Approval  9/6/2016 PASS
as per Carl Madsen
Recd Pcfee & Taken To Pln CK  9/6/2016 DONE
Application received  5/11/2016 DONE
Application submitted via PDS Online on May 11 2016 1:43PM