Print Statement | | | 1/9/2018 | | DONE |
|
|
|
sent 1st late notice
|
Print Statement | | | 10/9/2017 | | DONE |
|
|
|
|
First Notice | | 9/17/2017 | 9/25/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/7/2017 | | DONE |
|
|
|
|
BLD-Final | 7/19/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
Mike Jordan
|
|
|
Brian Gross Phone #: ###-####
|
FIRE-Final Inspection | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
(F) Reprint permit | | | 5/31/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/31/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 3/17/2017 | 3/17/2017 | 3/27/2017 | | PASS |
Javier Guzman
|
|
|
Plan mod Five Mile Farms & Greenhouse Paper
|
Routing - PLAN CHECK | 3/17/2017 | | 3/27/2017 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 3/27/2017 | | DONE |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 3/27/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Print Occupancy Form | | | 3/27/2017 | | DONE |
|
|
|
|
Telephone call | | | 3/27/2017 | | DONE |
|
|
|
Spoke with Jon informing him that his plan mod is complete and the fee amount due
|
PubWorks Occupancy Approval | 3/24/2017 | 3/24/2017 | 3/24/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Routing PW Drainage | 3/22/2017 | | 3/24/2017 | | PASS |
Brian Murphy
|
|
|
Resubmittals approved. JCT
|
Plan Modification Accepted | | | 3/17/2017 | | DONE |
|
|
|
grading plans have been submitted
|
BLD-Conference | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | DONE |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Needs city approved plans. Noted to Brian that he will need electrical, fire/life/safety and public works finals as well.
|
BLD-Footing | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
Plan assigned to (JG) | 9/6/2016 | 9/6/2016 | 10/7/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 10/03 L3 New Production Greenhouse
|
Routing - PLAN CHECK | 10/7/2016 | | 10/7/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 10/7/2016 | | 10/7/2016 | | PASS |
Javier Guzman
|
|
|
resubmittals showed the design method on the plan sheets as requested by the off site engineer
|
Case Summary (BLD) | | | 10/7/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/7/2016 | | DONE |
|
|
|
***all requirments met 10-7-16 /CEV
***received RP still Need RP, GC & rev cert of val
|
Print Occupancy Form | | | 10/7/2016 | | DONE |
|
|
|
|
Telephone call | | | 10/7/2016 | | DONE |
|
|
|
called brian- left message that permit is ready, still need GC form, certificate of value, and RP
|
Issue PAID IN FULL permit | | | 10/7/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/6/2016 | | DONE |
|
|
|
received two copies of structural analysis, and sheets C-13319 & C-13320- gave to Javier
|
Route to Impact Fee Review | 9/29/2016 | 10/2/2016 | 9/29/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 9/29/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 9/6/2016 | | 9/29/2016 | | FAIL |
Javier Guzman
|
|
|
Failed egineering review with AHJ by Tiffany Curtis
|
Routing - PLAN CHECK | | | 9/29/2016 | | FAIL |
Javier Guzman
|
|
|
need to pass engineering
|
Routing - FIRE | 9/26/2016 | 9/6/2016 | 9/28/2016 | | PASS |
Katie Marron
|
|
|
No comments required.
|
Routing - Erosion and Sediment | 9/23/2016 | | 9/26/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Vald PD, RP to be determined. Site preparation inspection REQUIRED, call ###-####.
|
Routing - MECHANICAL | | | 9/26/2016 | | PASS |
Troy James
|
|
|
no mechanical to review
|
Routing - PLANNING | 9/23/2016 | | 9/23/2016 | | PASS |
Leon Letson
|
|
|
CUP16-00060
|
Routing - PUBLIC WORKS | 9/8/2016 | | 9/23/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 9/8/2016 | | 9/22/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 9/8/2016 | | 9/8/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 9/7/2016 | | 9/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLANNING Land Div | 9/6/2016 | | 9/7/2016 | | PASS |
Todd Tucker
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/6/2016 | | PASS |
|
|
|
as per Carl Madsen
|
Recd Pcfee & Taken To Pln CK | | | 9/6/2016 | | DONE |
|
|
|
|
Application received | | | 5/11/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 11 2016 1:43PM
|