Second Notice | | 5/21/2018 | 5/16/2018 | | DONE |
|
|
|
This permit finaled on the web by Paul Saucerman
|
First Notice | | 4/22/2018 | 5/11/2018 | | DONE |
|
|
|
mailed 5-14
|
Permanent Occupancy | | | 4/12/2018 | | DONE |
|
|
|
|
BLD-Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman. Ok for perm occ.
|
FIRE-Final Inspection | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items have been addressed, no fire sprinklers, fire alarm nispection complete, racking permit is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
|
Zoning Approval | 4/11/2018 | 4/11/2018 | 4/11/2018 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | FAIL |
Troy Cobbley
|
|
|
The exit discharge light has been repaired but racking over 8'--0" has been installed so a Racking Permit is required.
Please call 30 minutes prior to inspection Phone #: ###-#### Inspection requested via web by John Saucerman
|
BLD-Final | 7/24/2017 | 7/25/2017 | 7/25/2017 | P | CANC |
Mike Jordan
|
|
|
Please call 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by John Saucerman Inspection cancelled from web by: John Saucerman
|
FIRE-Final Inspection | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | FAIL |
Troy Cobbley
|
|
|
Exit discharge light needs repaired and per IFC 904.3.4 and plan review, notificaton is required in this new room/area due to the existing suppression system in the existing area. Permit is required.
|
BLD-Energy code compliance | 6/9/2017 | 6/12/2017 | 6/12/2017 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman
|
BLD-Energy code compliance | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 6/8/2017 | 6/9/2017 | 6/9/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman
|
BLD-Foundation | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection requested via web by John Saucerman
|
BLD-Footing | 4/19/2017 | 4/20/2017 | 4/20/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman
|
Issue PAID IN FULL permit | | | 4/13/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/13/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/10/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 4/10/2017 | | DONE |
Christina Prado
|
|
|
***MET 4-11-17 CAN***Need RP, GC Form & REvised Certificate of Value for issuance
|
Plan assigned to (CDM) | 3/10/2017 | 3/10/2017 | 4/8/2017 | | PASS |
Carl D Madsen
|
|
|
4/10
|
Routing - PLAN CHECK | 3/10/2017 | | 4/8/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 3/10/2017 | | 4/8/2017 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 4/8/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2017 | | DONE |
|
|
|
|
Routing - FIRE | 3/10/2017 | 3/10/2017 | 3/13/2017 | | PASS |
Scott Arellano
|
|
|
No comments required. Basic Life Safety
|
Routing - Erosion and Sediment | 3/10/2017 | | 3/13/2017 | | PASS |
Andy J. Long
|
|
|
Major TI within exisiting stabilized office complex. ESC plan waiver approved. Valid RP designated.
|
Routing - MECHANICAL | 3/10/2017 | | 3/13/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/10/2017 | | 3/13/2017 | | PASS |
Cody Riddle
|
|
|
No review required. Approved by DRH16-00352.
|
Routing - PLANNING Land Div | 3/10/2017 | | 3/13/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 3/10/2017 | | 3/10/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/10/2017 | | 3/10/2017 | | PASS |
Rachael Beierle
|
|
|
WEST BOISE SEWER DISTRICT. NO NEW FEES
|
Routing - Design Review | 3/10/2017 | | 3/10/2017 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 3/10/2017 | | PASS |
|
|
|
|
Application received | | | 1/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 23 2017 11:14AM
|
Intake Approval | | | 1/23/2017 | | FAIL |
David Ferguson
|
|
|
Provide a completed #304 and 310 forms.
|