BLD - Resubmittal Approved | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | DEFR |
Brandon Shaw
|
|
|
. Phone #: ###-#### Inspection requested via web by Jon King
|
BLD-Conference | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | PEND |
Dave Hannah
|
|
|
Issue CN that permit will be expired if required inspections not requested left message to contact me priject is at sheetrock stage framing and insulate is all good jest need to finish and get finals
|
BLD-Energy code compliance | 6/28/2018 | 6/29/2018 | 6/29/2018 | P | NR |
Dave Hannah
|
|
|
Dusty Phone #: ###-####
|
BLD-Framing/Rough-in | 6/26/2018 | 6/27/2018 | 6/27/2018 | P | NR |
Dave Hannah
|
|
|
call when on way // Dusty Phone #: ###-#### needs air seal mec rough in and truss enginering
|
BLD-Wall Bracing | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Jim Storey
|
|
|
Please call ahead or access - Dusty Phone #: ###-#### engineering ok for garage// need to blk common wall for gyp
|
BLD-Wall Bracing | 1/3/2018 | 1/3/2018 | 1/3/2018 | P | PEND |
Brandon Shaw
|
|
|
Provide Engineering approval for "as built" wall bracing. As per plans, SSW 24X10 brace panels (5) to be at garage door portal (2) and at south garage wall (3) OK to cover exterior
|
BLD-Foundation | 9/27/2017 | 9/27/2017 | 9/28/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Jon King
|
BLD-Footing | 9/8/2017 | 9/8/2017 | 9/11/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Jon King
|
Issue PAID IN FULL permit | | | 8/10/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/8/2017 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 7/11/2017 | 7/11/2017 | 8/8/2017 | | PASS |
Josh Bogle
|
|
|
1st. done - ADU, waiting on some construction details
|
Routing - PLAN CHECK | 8/8/2017 | | 8/8/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 8/8/2017 | | DONE |
|
|
|
Need GC and RP
|
1st review completed | | | 7/20/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/11/2017 | | 7/20/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Design Review | 7/11/2017 | | 7/18/2017 | | PASS |
Ted Vanegas
|
|
|
|
Route to Impact Fee Review | 7/11/2017 | 7/14/2017 | 7/14/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 7/11/2017 | | 7/14/2017 | | PASS |
Troy James
|
|
|
Geothermal heat
|
Routing - Addressing | 7/11/2017 | | 7/12/2017 | | PASS |
Laura Hunter
|
|
|
ADU address is 497 E Warm Springs Ave
|
Routing - PUBLIC WORKS | 7/11/2017 | | 7/11/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 7/11/2017 | | 7/11/2017 | | PASS |
Nicolette Womack
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/11/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/11/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/11/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/10/2017 | | FAIL |
Christina Prado
|
|
|
PLans need to comply with submittal standards, emailed applicant from ePlan
Ryan,
You will need to re-upload your files following the naming and orientation requirements as detailed in this document. http://pds.cityofboise.org/media/105041/electronicstandards.pdf
Please re-upload your drawings in the required landscape format and rename them as specified. Let me know if you have any questions.
Thank you,
Christina ###-####
|
Application received | | | 7/9/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2017 5:28PM
|
BLD-Conference | 8/30/2019 | 9/3/2019 | | A | |
Dave Hannah
|
|
|
|