BLD-Final | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Mike Jordan
|
|
|
Charlie Phone #: ###-####
|
DOC - Permit Finaled | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 4/5/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Mike Jordan
|
|
|
Charlie Phone #: ###-####
|
BLD-Energy code compliance | 3/25/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Framing- air/foam seal in place... OK to insulate...
|
BLD-Framing/Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | NR |
Mike Jordan
|
|
|
Charlie Phone #: ###-####. Needs to complete the airseal pack
|
OVERRIDE | | | 11/20/2018 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/20/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 11/19/2018 | | 11/20/2018 | | PASS |
Troy James
|
|
|
|
Permit Ready to Issue | | | 11/20/2018 | | DONE |
|
|
|
Plan Mod Approved
|
Plan Modification Accepted | | | 11/19/2018 | | DONE |
|
|
|
Turn in Manual J- Adding new furnace
|
Routing - MECHANICAL | 11/19/2018 | | 11/19/2018 | | FAIL |
Troy James
|
|
|
Emailed corrections to Custom air
|
CHANGE STATUS TO (REV) | | | 11/19/2018 | | DONE |
|
|
|
plan mod for adding new furnace
|
BLD-Framing/Rough-in | 8/30/2018 | 9/4/2018 | 9/4/2018 | P | CANC |
Mike Jordan
|
|
|
Charles Phone #: ###-####
|
BLD-Wall Bracing | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Mike Jordan
|
|
|
Charles Phone #: ###-####
|
BLD-Foundation | 5/14/2018 | 5/15/2018 | 5/15/2018 | P | PASS |
Mike Jordan
|
|
|
rebar - Charles Phone #: ###-####
|
BLD-Other | 2/2/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Brandon Shaw
|
|
|
Under floor insulation, mudroom
|
Routing Walk-In (BLD) | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Josh Bogle
|
|
|
plan mod
|
Inspection Record Card- Bld | | | 2/2/2018 | | DONE |
Josh Bogle
|
|
|
|
BLD-Conference | 1/25/2018 | 1/25/2018 | 1/25/2018 | P | DONE |
Mike Jordan
|
|
|
Charles Phone #: ###-####. Went over foundation repair issues. Home owner has decided to remove existing garage as well. Will nee dto modify scope of work. Will add portal frame with new stemwalls and grade beam.
|
OVERRIDE | | | 10/5/2017 | | |
|
|
|
|
BLD-Foundation | 10/4/2017 | 10/5/2017 | 10/5/2017 | P | PART |
Mike Jordan
|
|
|
Jeremy-Stem wall Phone #: ###-####
|
Routing Walk-In (BLD) | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 10/5/2017 | 10/5/2017 | 10/5/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/5/2017 | | 10/5/2017 | | PASS |
Josh Bogle
|
|
|
MODIFICATION - MIN FEE - JAB
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2017 | | DONE |
Josh Bogle
|
|
|
min modification fee - one hour - JAB
|
Permit Ready to Issue | | | 10/5/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/5/2017 | | DONE |
|
|
|
made a few changes on his plans brought them in for Josh to plan review
|
CHANGE STATUS TO (ISS) | | | 10/5/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/5/2017 | | DONE |
|
|
|
|
BLD-Footing | 9/29/2017 | 10/2/2017 | 10/2/2017 | A | PART |
Mike Jordan
|
|
|
Jeremy Phone #: ###-####. Will call in for wall inspection. will be mono placement.
|
Routing Walk-In (BLD) | 9/8/2017 | 9/8/2017 | 9/8/2017 | P | PASS |
Josh Bogle
|
|
|
|
OVERRIDE | | | 8/11/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/11/2017 | 8/11/2017 | 8/11/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 8/11/2017 | 8/11/2017 | 8/11/2017 | A | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 8/11/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/11/2017 | | 8/11/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/11/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/11/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 8/11/2017 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 8/11/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/11/2017 | | | |
|
|
|
|