Permit NumberBLD17-03275
StatusIssued
Name TALBOY CONSTRUCTION
Site Address 11431 W GLEN ELLYN CT
Project Nameglen ellyn project
Customer Number 
ePlanReviewYes
Description
MODIFICATION - HOME BEING SHIFTED FORWARD ON LOT **jab** Permit for the construction of a new 2,847 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 238 sq. ft. of covered patio/porch and a 645 sq. ft. attached garage per local code, the approved plans, and any notations. R-1C zoning and setbacks per planning. Separate electrical, plumbing &mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing8/6/20208/7/20208/7/2020PPART
DetailsTell Riley
JR *screened* Phone #: ###-####//WIP//
CHANGE STATUS TO (ISS)  7/24/2020 DONE
OVERRIDE  7/23/2020  
Plan assigned to (JAB) Josh7/14/20207/14/20207/23/2020 PASS
DetailsJosh Bogle
Routing - PLAN CHECK7/23/2020 7/23/2020 PASS
DetailsJosh Bogle
minimum Plan Review fee
Permit Ready to Issue  7/23/2020 DONE
All requirements met

**DO NOT RE-ISSUE - PLAN MOD**
Routing - PLANNING7/22/2020 7/22/2020 PASS
DetailsSue Cummings
Still good
Plan Modification Accepted  7/14/2020 DONE
Richard Talboy, GC is requesting a plan modification to move the location of the home. Already spoken with Jeff Lowe
BLD-Conference7/7/20207/8/20207/8/2020ADONE
DetailsTell Riley
Richard Phone #: ###-####//east setback is in question for irrigation easment//met onsite to discuss options//appears to be adequate space to move home forward on lot to provide added access on east side//advised owner to obtain written acceptance from Nampa Meridian irrigation for moving home forward, then submit revised site plan for city approval//
Routing - MECHANICAL12/31/2019 12/31/2019 PASS
DetailsChad Schwendiman
Revised acca report
CHANGE STATUS TO (ISS)  12/9/2019 DONE
reactivate permit with 2 hr admin fee, per Bob A.
Change Expiration Date Only  12/9/2019 DONE
(F) Reprint permit  12/9/2019 DONE
BLD-Conference12/6/201912/6/201912/6/2019PDONE
DetailsBob Archibald
Permit may be reactivated with original approved plans and a 2hour admin fee.
DOC - Permit Expired  9/13/2019 DONE
Inspection Record Card- Bld  11/13/2018 DONE
Issue PAID IN FULL permit  12/12/2017 DONE
Inspection Record Card- Bld  12/12/2017 DONE
OVERRIDE  11/2/2017  
Plan assigned to (JAB) Josh10/25/201710/25/201711/2/2017 PASS
DetailsJosh Bogle
1st done - needs additional details
Routing - PLAN CHECK11/2/2017 11/2/2017 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/2/2017 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  11/2/2017 DONE
met
Routing - PLAN CHECK10/31/2017 10/31/2017 PASS
DetailsJosh Bogle
needed E-plan uploaded with Exactly the same name - JAB
1st review completed  10/25/2017 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK10/3/2017 10/25/2017 FAIL
DetailsJosh Bogle
Route to Impact Fee Review10/3/201710/6/201710/4/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Plan assigned to (BJM)10/3/201710/3/201710/3/2017 DEFR
DetailsBrian McGowan
10/16 sfd L1 ePlan
Routing - MECHANICAL10/3/2017 10/3/2017 PASS
DetailsTroy James
Routing - PLANNING10/3/2017 10/3/2017 PASS
DetailsSue Cummings
Routing - Addressing10/3/2017 10/3/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/3/2017 10/3/2017 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/3/2017 DONE
Recd Pcfee & Taken To Pln CK  10/3/2017 DONE
Intake Approval  10/3/2017 PASS
MISC ACTIONS  9/25/2017 DONE
applicant paid plan check fee based on 2847 sq.ft.
Intake Approval  9/25/2017 FAIL
need Man J uploaded
Application received  9/12/2017 DONE
Application submitted via PDS Online on Sep 12 2017 2:23PM