DOC - Permit Finaled | | | 12/12/2019 | | DONE |
|
|
|
Doc final per inspection conducted on 12/09/2019 by David Hannah and confirm with him
|
BLD-Final | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | DONE |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Final | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | CANC |
Jim Storey
|
|
|
Jason Phone #: ###-#### no access or call back.
|
BLD-Framing/Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | DEFR |
Brandon Shaw
|
|
|
Jason Phone #: ###-####
|
FIRE-Final Inspection | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection is complete.
Jason Phone #: ###-####
|
FIRE-Final Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Jim Page
|
|
|
Partial final inspwection for life fire safety is complete, item left for life fire safety is signage placed in north stairwell, install signage for fire sprinkler floor control access at discussed doors. Fire sprinkler inspection is complete, fire alarm inspection is complete. 45 day TCO authorized per conversation with Ron Johnson for life fire safety.
|
PubWorks Occupancy Approval | 9/23/2019 | 9/23/2019 | 9/23/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 9/17/2019 | 9/17/2019 | 9/17/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Framing/Rough-in | 5/16/2019 | 5/16/2019 | 5/16/2019 | A | PART |
Dave Hannah
|
|
|
5th floor drop soffit framing Phone #: ###-#### Inspection requested via web by Jason Reisinger first four rooms ok
|
BLD-Framing/Rough-in | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PART |
Dave Hannah
|
|
|
Jason Phone #: ###-#### 2nd floor corradors drop ceilings ok to cover
|
BLD-Framing/Rough-in | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 8/24/2018 | 8/24/2018 | 8/27/2018 | P | NR |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Foundation | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Dave Hannah
|
|
|
post tension // Jason Phone #: ###-####
|
BLD-Footing | 4/24/2018 | 4/24/2018 | 4/25/2018 | P | PEND |
Dave Hannah
|
|
|
Jason Phone #: ###-#### crews still working on forms and rebar also spec inspection will do final rebar and test concrete
|
Print permit w/o conditions | | | 4/18/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/20/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/20/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/18/2018 | | |
|
|
|
|
Route to Impact Fee Review | 1/12/2018 | 1/15/2018 | 1/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (CJW) | 12/1/2017 | 12/1/2017 | 1/18/2018 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Dec 14 - 2 weeks) (66 sheets) Afton Podium
|
Routing - PLAN CHECK | 1/17/2018 | | 1/18/2018 | | PASS |
Carl Westfall
|
|
|
2nd review done
|
Routing Off Site - STRUCTURAL | 1/18/2018 | | 1/18/2018 | | DONE |
Carl Westfall
|
|
|
For Jared Bauder with CH2M Hill to remove his changemarks
|
Routing PW Solid Waste | 1/18/2018 | | 1/18/2018 | | PASS |
Evan Carpenter
|
|
|
For Evan to remove his changemark.
ESC: Changemark resolved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/18/2018 | | DONE |
Christina Prado
|
|
|
NEED
ACHD
RP - met
GC FORM - met
REVISED CERT - met
(BREAK OUT VALUES FOR GRD17-00061 AND ISSUE BOTH PERMITS)
|
Plan resubmittals received | | | 1/17/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/20/2017 | | 1/12/2018 | | FAIL |
Carl Westfall
|
|
|
|
1st review completed | | | 1/12/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/12/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/21/2017 | | 1/2/2018 | | PASS |
Carl Westfall
|
|
|
Jared Bauder (CH2M Hill)
|
Routing PW Solid Waste | 12/21/2017 | | 12/29/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Design Review | 12/21/2017 | | 12/26/2017 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 12/20/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/20/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/1/2017 | | 12/20/2017 | | PEND |
Carl Westfall
|
|
|
This project has not been reviewed yet for nonstructural IBC provisions. It was routed back to the applicant so that revised drawings could be uploaded so the 2nd structural review could be done. The IBC non-structural review will be done as as part of the 2nd review.
|
Routing Off Site - STRUCTURAL | 12/1/2017 | | 12/12/2017 | | FAIL |
|
|
|
Jared Bauder (CH2M Hill)
|
Routing PW Solid Waste | 12/5/2017 | | 12/11/2017 | | FAIL |
Evan Carpenter
|
|
|
There will need to be a loading zone on 9th street where the dumpsters can be placed prior to servicing by the City’s contractor. Refer to the solid waste design standards linked below, particularly to the requirement to “provide a ‘no parking area’ on the street, for a minimum of 10’ in front of the access ramp.”
Additionally, I will need a signed statement from the building owner, stating that building staff will be responsible for moving containers to the street loading zone for collection and that the City’s solid waste contractor will not enter the building to retrieve or return the containers from the solid waste room.
|
Routing - FIRE | 12/1/2017 | 12/1/2017 | 12/8/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Sewer Design | 12/5/2017 | | 12/8/2017 | | PASS |
Mike Sheppard
|
|
|
|
Routing PW Sewer Rating | 12/5/2017 | | 12/6/2017 | | PASS |
Morgan Webb
|
|
|
FIRST FLOOR PLUMBING ONLY
|
Routing - Erosion and Sediment | 12/1/2017 | | 12/6/2017 | | PASS |
Michael Zawacki
|
|
|
VOID. SWPPP/ESC plan submitted with GRD17-00061. See ESC17-01346 to cover all phases of Afton Phase II.
|
Routing - PUBLIC WORKS | 12/1/2017 | | 12/5/2017 | | PASS |
Rachael Beierle
|
|
|
ROUTING ONLY.
|
Routing PW Drainage | 12/5/2017 | | 12/5/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 12/5/2017 | | 12/5/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Environmental | 12/5/2017 | | 12/5/2017 | | PASS |
Rick Christenson
|
|
|
Trash area drains FD-3, FS-2 routed to FL-1 Interceptor.
|
Routing PW Geothermal | 12/5/2017 | | 12/5/2017 | | PASS |
Jon R. Gunnerson
|
|
|
No connection to geothermal heating district. If desiring to connect onto geothermal system, contact Boise Public Works ###-####
|
Routing - PLANNING | 12/1/2017 | | 12/4/2017 | | PASS |
Cody Riddle
|
|
|
DR only.
|
Routing - Design Review | 12/1/2017 | | 12/4/2017 | | FAIL |
Andrea Tuning
|
|
|
I just received a building permit package (BLD17-03344) to review. It appears as though the building permit package includes a significantly different site plan, floor plans and elevations than what were approved by the Design Review Committee on July 12, 2017 with DRH17-00213. As such, I am unable to approve your building permit package at this time.
A staff level Design Review application must be reviewed and approved prior to my next review of the building permit package.
|
Routing - Addressing | 12/1/2017 | | 12/1/2017 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 12/1/2017 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 11/20/2017 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 10/2/2017 | | FAIL |
|
|
|
(10-2-17) Please see the circled items in the plan intake checklist (i.e. the ones without an OK). Please resolve each item as directed.
|
Intake Approval | | | 9/21/2017 | | FAIL |
|
|
|
(9-21-17) Please see the circled items in the plan intake checklist. Please resolve each item as directed.
|
Application received | | | 9/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 19 2017 9:07AM
|