Print Occupancy Form | | | 11/28/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/28/2018 | | DONE |
|
|
|
|
Second Notice | | 10/22/2018 | 10/31/2018 | | DONE |
|
|
|
This permit finaled on the web by Curtis Weedop
|
First Notice | 9/7/2018 | 9/7/2018 | 10/12/2018 | | DONE |
Jim Sly
|
|
|
mailed 10-15-18
|
BLD-Final | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by rocky donica
|
DOC - Permit Finaled | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Jim Page
|
|
|
Fire alarm inspection is complete, final life fire safety inspection for area of work complete.
|
BLD-Final | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by rocky donica,, needs fire 1
|
FIRE-Final Inspection | 8/29/2018 | 8/29/2018 | 8/29/2018 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
|
BLD-Final | 8/29/2018 | 8/30/2018 | 8/29/2018 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
|
BLD-Final | 7/30/2018 | 7/30/2018 | 8/1/2018 | P | DONE |
Dave Hannah
|
|
|
Please call when you get there // Rocky Phone #: ###-####
|
FIRE-Final Inspection | 8/1/2018 | 8/1/2018 | 8/1/2018 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety TCO complete, fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags, fire alarm permit is still in under review status due to changes to the existing fire alarm system (FIR18-00355, fire alarms are active, if city approved drawings do not match install then corrections will be required to match city approved drawings). When fire alarm permit is finaled then life fire safety can be finaled as well. 30 day TCO authorized for life fire safety
|
BLD-Final | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | PART |
Dave Hannah
|
|
|
Rocky-would like to try and get a temp c of o Phone #: ###-#### ok for tco ok for perm co after all other trades go perm
|
FIRE-Final Inspection | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | CANC |
Jim Page
|
|
|
Office partitions/cubicles need to be in place before life fire safety inspection can be completed for fire extinguisher placement and to verify spacing. This request is cancelled.
Rocky Phone #: ###-####
|
BLD-Final | 7/31/2018 | 7/31/2018 | 7/31/2018 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by rocky donica
|
BLD-Ceiling Grid Inspection | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Dave Hannah
|
|
|
Zak Phone #: ###-####
|
BLD-Framing/Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | PASS |
Dave Hannah
|
|
|
Ken Phone #: ###-#### 4th floor
|
Print Occupancy Form | | | 2/23/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/23/2018 | | DONE |
|
|
|
|
Routing - FIRE | 1/26/2018 | 1/26/2018 | 1/31/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan assigned to (JG) | 12/27/2017 | 12/27/2017 | 1/31/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 1/09 L2 WGP2 -4th Flr Rev Cycle ePlan, pend fire
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/31/2018 | | DONE |
Christina Prado
|
|
|
NEED
GC - met
Rev Cert of val - met
|
Routing - PLAN CHECK | 1/26/2018 | | 1/27/2018 | | PASS |
Javier Guzman
|
|
|
|
Route to Impact Fee Review | 1/17/2018 | 1/20/2018 | 1/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 1/17/2018 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/27/2017 | | 1/17/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 12/27/2017 | | 1/5/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 12/27/2017 | 12/27/2017 | 1/2/2018 | | FAIL |
Scott Arellano
|
|
|
Attached comments to case and emailed architect
|
Routing - PLUMBING | 12/27/2017 | | 12/28/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 12/27/2017 | | 12/27/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/27/2017 | | 12/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 12/27/2017 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 12/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2017 11:33AM
|
Intake Approval | | | 12/20/2017 | | FAIL |
Rob Patrick
|
|
|
12-20-17: Please provide the following information.
1. The following sheets were listed on the checklist but were not in the Prescreen dwg list:
A1.1 Demo Wall Sched; A8.1 Exit Signs/Emergency Lighting; E7.1 Lighting Plan & Fixture Sched; M4.1 Supply/Return Ducts, Smoke/Fire Dampers, Exhaust Fan locations.
2. Sheet A2.1 doesn't locate the Portable Fire Extinguishers, and I can't find a symbol for those on a Legend Sheet.
Thank you
Rob Patrick
|