Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD17-04595
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 701 E MORRISON KNUDSEN PLAZA DR
Project NameSt. Lukes WGP@ Suite #400
Customer Number 
ePlanReviewYes
Description
(ST. LUKES WGP2 – 4TH FLOOR SUITE #400) This building is Not Fire Sprinklered. Permit is to remodel an existing 25,444 sq. ft. fourth floor business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select suspended acoustic ceiling, removal of select plumbing fixtures, removal of select millwork, construction of select interior non-bearing walls to create select 1-hour rated corridor walls, (20) offices, (2) wellness rooms, a file room, a communication room, (3) conference rooms, open office areas and an accessible women’s restroom, select new door/door frames, select new suspended acoustic and gypsum ceiling, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Occupancy Form  11/28/2018 DONE
Permanent Occupancy  11/28/2018 DONE
Second Notice 10/22/201810/31/2018 DONE
This permit finaled on the web by Curtis Weedop
First Notice9/7/20189/7/201810/12/2018 DONE
DetailsJim Sly
mailed 10-15-18
BLD-Final9/6/20189/7/20189/7/2018APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by rocky donica
DOC - Permit Finaled9/7/20189/7/20189/7/2018PPASS
DetailsJim Sly
FIRE-Final Inspection9/5/20189/5/20189/5/2018PPASS
DetailsJim Page
Fire alarm inspection is complete, final life fire safety inspection for area of work complete.
BLD-Final8/30/20188/31/20188/31/2018ACANC
DetailsTony Young
Phone #: ###-#### Inspection requested via web by rocky donica,, needs fire 1
FIRE-Final Inspection8/29/20188/29/20188/29/2018ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
BLD-Final8/29/20188/30/20188/29/2018ACANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by rocky donica Inspection cancelled from web by: rocky donica
BLD-Final7/30/20187/30/20188/1/2018PDONE
DetailsDave Hannah
Please call when you get there // Rocky Phone #: ###-####
FIRE-Final Inspection8/1/20188/1/20188/1/2018APART
DetailsJim Page
Partial final inspection for life fire safety TCO complete, fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags, fire alarm permit is still in under review status due to changes to the existing fire alarm system (FIR18-00355, fire alarms are active, if city approved drawings do not match install then corrections will be required to match city approved drawings). When fire alarm permit is finaled then life fire safety can be finaled as well. 30 day TCO authorized for life fire safety
BLD-Final7/31/20188/1/20188/1/2018APART
DetailsDave Hannah
Rocky-would like to try and get a temp c of o Phone #: ###-#### ok for tco ok for perm co after all other trades go perm
FIRE-Final Inspection7/31/20187/31/20187/31/2018PCANC
DetailsJim Page
Office partitions/cubicles need to be in place before life fire safety inspection can be completed for fire extinguisher placement and to verify spacing. This request is cancelled.

Rocky Phone #: ###-####
BLD-Final7/31/20187/31/20187/31/2018ACANC
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by rocky donica
BLD-Ceiling Grid Inspection7/3/20187/5/20187/5/2018APASS
DetailsDave Hannah
Zak Phone #: ###-####
BLD-Framing/Rough-in4/24/20184/25/20184/25/2018APASS
DetailsDave Hannah
Ken Phone #: ###-#### 4th floor
Print Occupancy Form  2/23/2018 DONE
Issue PAID IN FULL permit  2/23/2018 DONE
Routing - FIRE1/26/20181/26/20181/31/2018 PASS
DetailsErika Akin
Attached comments to case
Plan assigned to (JG)12/27/201712/27/20171/31/2018 PASS
DetailsJavier Guzman
1st rev comp, 1/09 L2 WGP2 -4th Flr Rev Cycle ePlan, pend fire
PLANS/APPL TAKEN TO FRONT DESK  1/31/2018 DONE
Permit Ready to Issue  1/31/2018 DONE
DetailsChristina Prado
NEED
GC - met
Rev Cert of val - met
Routing - PLAN CHECK1/26/2018 1/27/2018 PASS
DetailsJavier Guzman
Route to Impact Fee Review1/17/20181/20/20181/18/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  1/17/2018 DONE
DetailsJavier Guzman
Routing - PLAN CHECK12/27/2017 1/17/2018 FAIL
DetailsJavier Guzman
Routing - MECHANICAL12/27/2017 1/5/2018 PASS
DetailsTroy James
Routing - FIRE12/27/201712/27/20171/2/2018 FAIL
DetailsScott Arellano
Attached comments to case and emailed architect
Routing - PLUMBING12/27/2017 12/28/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing12/27/2017 12/27/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/27/2017 12/27/2017 PASS
DetailsRachael Beierle
Intake Approval  12/27/2017 PASS
DetailsJavier Guzman
Application received  12/20/2017 DONE
Application submitted via PDS Online on Dec 20 2017 11:33AM
Intake Approval  12/20/2017 FAIL
DetailsRob Patrick
12-20-17: Please provide the following information.
1. The following sheets were listed on the checklist but were not in the Prescreen dwg list:
A1.1 Demo Wall Sched; A8.1 Exit Signs/Emergency Lighting; E7.1 Lighting Plan & Fixture Sched; M4.1 Supply/Return Ducts, Smoke/Fire Dampers, Exhaust Fan locations.
2. Sheet A2.1 doesn't locate the Portable Fire Extinguishers, and I can't find a symbol for those on a Legend Sheet.
Thank you
Rob Patrick