PubWorks Occupancy Approval | 10/16/2019 | 10/16/2019 | 10/16/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 10/15/2019 | | DONE |
|
|
|
|
Zoning Approval | 10/14/2019 | 10/14/2019 | 10/14/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Jim Storey
|
|
|
call rob when on site Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | PEND |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags, site monument has been provided for fire department. Final life fire safety inspection complete, signatures provided on final signature card.
call rob when on site Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Brandon Shaw
|
|
|
CCorrections SAT...
|
BLD-Other | 7/25/2019 | 7/26/2019 | 7/26/2019 | P | FAIL |
Jim Storey
|
|
|
fire caulking- Craig Phone #: ###-#### c/n posted
|
BLD-Other | 7/22/2019 | 7/23/2019 | 7/23/2019 | A | PASS |
Jim Storey
|
|
|
cRED- FIRE CALKING ISP Phone #: ###-####
|
FIRE-Supply Line Cover | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | CANC |
Jim Page
|
|
|
Assigned to wrong inspector per conversation with listed point of contact, this request is cancelled.
gREG- inpection South 12 units Phone #: ###-####
|
BLD-Energy code compliance | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Jim Storey
|
|
|
energy compliance. RD channel on 1st and 2nd floor ceilings. North 12 units. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Jim Storey
|
|
|
energy compliance, wall insulation / vapor barrier. Phone #: ###-#### Inspection requested via web by J.C. Murray east side ok
|
BLD-Framing/Rough-in | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Jim Storey
|
|
|
Bld G - framing. fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray c/n made ok
|
BLD-Framing/Rough-in | 5/29/2019 | 5/29/2019 | 5/29/2019 | A | DEFR |
Brandon Shaw
|
|
|
Bld G - framing. fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | DEFR |
Brandon Shaw
|
|
|
Bld G - framing. fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | NR |
Jim Storey
|
|
|
Bld G - fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Jim Storey
|
|
|
Bld G - exterior ply nailing, hold downs, titan bolts, shear straps, roof truss engineering . Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Wall Bracing | 12/7/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Jim Storey
|
|
|
sheer walls 1st floor
|
BLD-Energy code compliance | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Jim Storey
|
|
|
exterior foundation insulation Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Foundation | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PART |
Brandon Shaw
|
|
|
Manuel Phone #: ###-####
|
BLD-Footing | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Jim Storey
|
|
|
Maunel Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/10/2018 | | |
|
|
|
plan mod
|
OVERRIDE | | | 7/3/2018 | | |
|
|
|
|
Plan assigned to (AJS) | 6/26/2018 | 6/26/2018 | 7/3/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 7/2/2018 | | 7/3/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLUMBING | 7/2/2018 | | 7/3/2018 | | CANC |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 7/3/2018 | | DONE |
|
|
|
PLAN MOD (17-04623, 04624, 4625, 4627, 4628, 4630, 4631)
|
Routing - PLAN CHECK | 7/2/2018 | | 7/2/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**
|
Plan Modification Accepted | | | 6/26/2018 | | DONE |
|
|
|
started workflow for modification; Type 2 - Relocate the wsher/dryer from the bathroom to the hallway. Add pocket door to bedroom closet. Type 2-HC - Add pocket door to bedroom closet. Type 5 - Relocate the washer dryer from the bathroom to the hallway and reconfigure bathroom. Type 5-HC - Remove closet adjacent to kitchen counter.
|
Print Occupancy Form | | | 5/16/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/16/2018 | | DONE |
|
|
|
|
Expiration Notice | 5/15/2018 | 6/5/2018 | 5/15/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
Christina Prado
|
|
|
All met
|
Plan assigned to (AJS) | 1/9/2018 | 1/9/2018 | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st Review Completed Skyline Apartments
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 4/2/2018 | | 4/2/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 2/12/2018 | 2/15/2018 | 2/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLUMBING | 1/9/2018 | | 2/13/2018 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - PLAN CHECK | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 1/9/2018 | | 1/25/2018 | | PASS |
Mike Sheppard
|
|
|
Sewer Plans have not been approved
approval per ePlan
|
Routing - Erosion and Sediment | 1/9/2018 | | 1/23/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Petra needs to designate their own RP. Site preparation inspection required. See also ESC17-01754
|
Routing - FIRE | 1/9/2018 | 1/9/2018 | 1/10/2018 | | PASS |
Scott Arellano
|
|
|
See Fire Code review comments previously approved under BLD15-03959.
|
Routing - MECHANICAL | 1/9/2018 | | 1/10/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Rating | 1/9/2018 | | 1/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 1/9/2018 | | 1/10/2018 | | PASS |
Nicolette Womack
|
|
|
Required to provide 192 bicycle spaces.
|
Routing - Addressing | 1/9/2018 | | 1/9/2018 | | PASS |
Doug Chausow
|
|
|
Address: 2033 S Hudson Ave
|
Routing - PUBLIC WORKS | 1/9/2018 | | 1/9/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 1/9/2018 | | 1/9/2018 | | FAIL |
Katelyn Menuge
|
|
|
Corrections to landscape and light pole locations required.
|
Intake Approval | | | 1/9/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 1/9/2018 | | 1/9/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 1/9/2018 | | 1/9/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 1/9/2018 | | 1/9/2018 | | PASS |
Tom Marshall
|
|
|
|
Application received | | | 12/22/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2017 11:30AM
|
First Notice | | 10/25/2019 | | | |
|
|
|
|