PubWorks Occupancy Approval | 10/16/2019 | 10/16/2019 | 10/16/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 10/15/2019 | | DONE |
|
|
|
|
Zoning Approval | 10/14/2019 | 10/14/2019 | 10/14/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Jim Storey
|
|
|
call me when on site Phone #: ###-#### Inspection requested via web by J.C. Murray final ok pending others
|
FIRE-Final Inspection | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, heat trace inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, signatures provided on sign off card for associated trades.
call me when on site Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 6/25/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Jim Storey
|
|
|
Building j. East 12 units. Drop ceiling fire caulking ceiling for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | PASS |
Jim Storey
|
|
|
all drop ceilings ok to cover.
|
BLD-Ceiling Grid Inspection | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PART |
Jim Storey
|
|
|
Bld J ; north 12 units. fire caulking drop ceilings for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray top north bathrm missing spk/ w/d fire chalk drop.
|
BLD-Framing/Rough-in | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Jim Storey
|
|
|
fire caulking completed for re-inspection Bld J south 12 units. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PART |
Jim Storey
|
|
|
Bld J south 12 units. drop ceilings for cover, fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray ok to cover need to verrify rated accesses
|
BLD-Wall cover | 4/3/2019 | 4/4/2019 | 4/4/2019 | P | PART |
Jim Storey
|
|
|
Bld J - all building, air seal and fire caulking for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray toliet flange/ fire blk line sets/tub fur out/ king stud at beams.
|
BLD-Framing/Rough-in | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Jim Storey
|
|
|
Builiding J - exterior nailing, shear straps. hold downs and titan bolts. truss engineering Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Wall Bracing | 11/26/2018 | 11/27/2018 | 11/27/2018 | P | PASS |
Jim Storey
|
|
|
interior shear walls first floor// JC Phone #: ###-####
|
BLD-Energy code compliance | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Jim Storey
|
|
|
exterior foundation insulation Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Foundation | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Jim Storey
|
|
|
wall // manuel Phone #: ###-####
|
BLD-Footing | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Jim Sly
|
|
|
Manuel Phone #: ###-#### OK pending MTI special inspections, tests and approvals.
|
CHANGE STATUS TO (ISS) | | | 7/10/2018 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 7/3/2018 | | |
|
|
|
|
Plan assigned to (AJS) | 6/26/2018 | 6/26/2018 | 7/3/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 7/2/2018 | | 7/3/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLUMBING | 7/2/2018 | | 7/3/2018 | | CANC |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 7/3/2018 | | DONE |
|
|
|
PLAN MOD (17-04623, 04624, 4625, 4627, 4628, 4630, 4631)
|
Routing - PLAN CHECK | 7/2/2018 | | 7/2/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**
|
Plan Modification Accepted | | | 6/26/2018 | | DONE |
|
|
|
started workflow for modification; Type 2 - Relocate the wsher/dryer from the bathroom to the hallway. Add pocket door to bedroom closet. Type 2-HC - Add pocket door to bedroom closet. Type 5 - Relocate the washer dryer from the bathroom to the hallway and reconfigure bathroom. Type 5-HC - Remove closet adjacent to kitchen counter.
|
Print Occupancy Form | | | 5/16/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/16/2018 | | DONE |
|
|
|
|
Expiration Notice | 5/15/2018 | 6/5/2018 | 5/15/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
Christina Prado
|
|
|
all met
|
Plan assigned to (AJS) | 1/9/2018 | 1/9/2018 | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Skyline Apartments
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2018 | | DONE |
|
|
|
|
Routing - Design Review | 4/2/2018 | | 4/2/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 2/12/2018 | 2/15/2018 | 2/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLUMBING | 1/9/2018 | | 2/13/2018 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - PLAN CHECK | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 1/9/2018 | | 1/25/2018 | | PASS |
Mike Sheppard
|
|
|
Sewer plans have not been approved
approval per ePlan
|
Routing - Erosion and Sediment | 1/9/2018 | | 1/23/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Petra needs to designate their own RP. Site preparation inspection required. See also ESC17-01754
|
Routing - FIRE | 1/9/2018 | 1/9/2018 | 1/10/2018 | | PASS |
Scott Arellano
|
|
|
See Fire Code plan review comments previously approved under BLD15-03962.
|
Routing PW Sewer Rating | 1/9/2018 | | 1/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 1/9/2018 | | 1/10/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/9/2018 | | 1/10/2018 | | PASS |
Nicolette Womack
|
|
|
Required to provide 192 bicycle spaces.
|
Routing - Addressing | 1/9/2018 | | 1/9/2018 | | PASS |
Doug Chausow
|
|
|
Address: 2061 S Hudson Ave
|
Routing - PUBLIC WORKS | 1/9/2018 | | 1/9/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 1/9/2018 | | 1/9/2018 | | FAIL |
Katelyn Menuge
|
|
|
Corrections to landscape and light pole locations required.
|
Intake Approval | | | 1/9/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 1/9/2018 | | 1/9/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 1/9/2018 | | 1/9/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 1/9/2018 | | 1/9/2018 | | PASS |
Tom Marshall
|
|
|
|
Application received | | | 12/22/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2017 11:30AM
|
First Notice | | 10/25/2019 | | | |
|
|
|
|