Permit Information
Permit NumberBLD18-00404
StatusFinaled
Name IDAHO TOWER CONSTRUCTION CO
Site Address 8235 W WESTPARK ST
Project NameAT&T - Boise Mall West
Customer Number 
ePlanReviewYes
Description
***PLAN MODIFICATION WORK DOES NOT INCLUDE THE TOWER OR TOWER FOUNDATION. MODIFICATIONS ARE 8'-0" x 8'-0" WALK IN CABINET INSTEAD OF 12' x 16'-0" SHELTER, H-FRAME INSTALLED IN DIFFERENT LOCATION AND INCLUDES A METER BANK AND HOFFMAN BOX. MDH (AT&T MONOPOLE) Permit for new 100' monopole wireless tower, inside of a new 50'x50' lease area work to include 16'x12' shelter, fencing, 6 antennas, 3 surge protectors, 3 new RRHS, 1 generator, 1 transformer. Structural engineering and plans provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/13/20194/16/2019 DONE
This permit finaled on the web by Dwayne Robinson
Second Notice 3/21/20194/8/2019 DONE
mailed 4-11-19
First Notice2/20/20192/20/20193/11/2019 DONE
DetailsMike Jordan
mailed 3-12-19
BLD-Conference2/19/20192/20/20192/20/2019ADONE
DetailsMike Jordan
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne Robinson
DOC - Permit Finaled2/20/20192/20/20192/20/2019PPASS
DetailsMike Jordan
BLD-Conference2/11/20192/12/20192/12/2019PNR
DetailsMike Jordan
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne . Needs both electrical permits finaled first.
BLD-Conference2/11/20192/11/20192/11/2019PNR
DetailsMike Jordan
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne . Needs both electrical permits finaled first.
BLD-Foundation11/29/201811/29/201811/29/2018PPASS
DetailsMike Jordan
Call half hour to meet // Steven Phone #: ###-####
OVERRIDE  11/27/2018  
Routing - FIRE11/23/201811/23/201811/27/2018 PASS
DetailsErika Akin
No comments attached. Total battery capacity is 26.09 gallons VRLA, no smoke detection required or provisions of 608 apply. No fire extinguisher required in U occupancy.
Routing - PLAN CHECK11/23/2018 11/27/2018 PASS
DetailsMichael Hanson
Plan mod review fee - 4 hours. MDH
1st review completed  11/27/2018 DONE
DetailsMichael Hanson
Plan mod review fee - 4 hours. MDH
Permit Ready to Issue  11/27/2018 DONE
PLAN MOD
CHANGE STATUS TO (ISS)  11/27/2018 DONE
PLAN MOD
Plan assigned to (M_H)11/8/2018 11/27/2018 DONE
DetailsMichael Hanson
11/21 #502 L1 ePlan Antenna plan mod
Plan Modification Accepted  11/8/2018 DONE
plan mod started in e plan-revised site plan, modified per changes made on site
BLD-Foundation10/31/201811/1/201811/1/2018AFAIL
DetailsMike Jordan
Steve Phone #: ###-####. Needs to upload a plan modification showing new building size and locations. Also noted that a different contractor has placed mono pole footing, no permit or inspections can be found at this time.
Issue PAID IN FULL permit  6/25/2018 DONE
Inspection Record Card- Bld  6/25/2018 DONE
OVERRIDE  6/13/2018  
Routing - Design Review6/13/2018 6/13/2018 PASS
DetailsKayCee Babb
per DRH18-00170
PLANS/APPL TAKEN TO FRONT DESK  6/13/2018 DONE
Permit Ready to Issue  6/13/2018 DONE
Need
GC Form- met
RP
Revised cert of value-met
Routing - PLANNING5/23/2018 5/23/2018 PASS
DetailsCeline Acord
per CUP17-00035
Routing - Design Review5/21/2018 5/21/2018 FAIL
DetailsKatelyn Menuge
A Design Review approval is required prior to building permit review.
Routing - FIRE4/16/20184/16/20185/4/2018 PASS
DetailsErika Akin
No comments attached. Battery capacity is 26.09 gallons VRLA, no smoke detection required or provisions of 608 apply.
Route to Impact Fee Review5/1/20185/4/20185/2/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing Off Site - STRUCTURAL4/16/2018 5/1/2018 PASS
DetailsMichael Hanson
Per Dave Haugland
Plan Reviewer's activity  5/1/2018 DONE
DetailsMichael Hanson
1st review completed  5/1/2018 DONE
DetailsMichael Hanson
Routing - PLAN CHECK5/1/2018 5/1/2018 PASS
DetailsMichael Hanson
Routing PW Drainage4/17/2018 4/17/2018 PASS
DetailsBrian Murphy
Routing - Addressing4/16/2018 4/17/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/16/2018 4/17/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment4/16/2018 4/17/2018 PASS
DetailsMichael Zawacki
Waiver approved. Contractor required to act as RP.
Intake Approval  4/16/2018 PASS
Plans ACCEPTED BY PLAN TECH  4/16/2018 DONE
Override - Parcel Holds  4/16/2018  
Recd Pcfee & Taken To Pln CK  4/16/2018 DONE
Routing - Design Review4/16/2018 4/16/2018 FAIL
DetailsKatelyn Menuge
Please submit a zoning certificate for review of the proposed fencing.
Routing - PLANNING4/16/2018 4/16/2018 FAIL
DetailsCeline Acord
Access to the site not detailed. Zoning certificate required for fencing per CUP17-00035
Plan Reviewer's activity  4/14/2018 PASS
Plan intake review approved
Plan assigned to (M_H)4/16/2018 4/13/2018 DONE
DetailsMichael Hanson
05/30 AT&T Monopole New - 1st review completed - Comments from planning and design review. MDH

6/13/18 per eplan
Intake Approval  2/28/2018 FAIL
(2-28-18) See the circled item without the "OK" in the circle in the plan intake checklist. Please resolve this item by uploading the completed form. CJW
Intake Approval  2/16/2018 FAIL
(2-16-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as noted. CJW
Application received  2/6/2018 DONE
Application submitted via PDS Online on Feb 6 2018 12:23PM