Third Notice | | 4/13/2019 | 4/16/2019 | | DONE |
|
|
|
This permit finaled on the web by Dwayne Robinson
|
Second Notice | | 3/21/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
First Notice | 2/20/2019 | 2/20/2019 | 3/11/2019 | | DONE |
Mike Jordan
|
|
|
mailed 3-12-19
|
BLD-Conference | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | DONE |
Mike Jordan
|
|
|
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne Robinson
|
DOC - Permit Finaled | 2/20/2019 | 2/20/2019 | 2/20/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 2/11/2019 | 2/12/2019 | 2/12/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne . Needs both electrical permits finaled first.
|
BLD-Conference | 2/11/2019 | 2/11/2019 | 2/11/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne . Needs both electrical permits finaled first.
|
BLD-Foundation | 11/29/2018 | 11/29/2018 | 11/29/2018 | P | PASS |
Mike Jordan
|
|
|
Call half hour to meet // Steven Phone #: ###-####
|
OVERRIDE | | | 11/27/2018 | | |
|
|
|
|
Routing - FIRE | 11/23/2018 | 11/23/2018 | 11/27/2018 | | PASS |
Erika Akin
|
|
|
No comments attached. Total battery capacity is 26.09 gallons VRLA, no smoke detection required or provisions of 608 apply. No fire extinguisher required in U occupancy.
|
Routing - PLAN CHECK | 11/23/2018 | | 11/27/2018 | | PASS |
Michael Hanson
|
|
|
Plan mod review fee - 4 hours. MDH
|
1st review completed | | | 11/27/2018 | | DONE |
Michael Hanson
|
|
|
Plan mod review fee - 4 hours. MDH
|
Permit Ready to Issue | | | 11/27/2018 | | DONE |
|
|
|
PLAN MOD
|
CHANGE STATUS TO (ISS) | | | 11/27/2018 | | DONE |
|
|
|
PLAN MOD
|
Plan assigned to (M_H) | 11/8/2018 | | 11/27/2018 | | DONE |
Michael Hanson
|
|
|
11/21 #502 L1 ePlan Antenna plan mod
|
Plan Modification Accepted | | | 11/8/2018 | | DONE |
|
|
|
plan mod started in e plan-revised site plan, modified per changes made on site
|
BLD-Foundation | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | FAIL |
Mike Jordan
|
|
|
Steve Phone #: ###-####. Needs to upload a plan modification showing new building size and locations. Also noted that a different contractor has placed mono pole footing, no permit or inspections can be found at this time.
|
Issue PAID IN FULL permit | | | 6/25/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 6/13/2018 | | |
|
|
|
|
Routing - Design Review | 6/13/2018 | | 6/13/2018 | | PASS |
KayCee Babb
|
|
|
per DRH18-00170
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/13/2018 | | DONE |
|
|
|
Need
GC Form- met
RP
Revised cert of value-met
|
Routing - PLANNING | 5/23/2018 | | 5/23/2018 | | PASS |
Celine Acord
|
|
|
per CUP17-00035
|
Routing - Design Review | 5/21/2018 | | 5/21/2018 | | FAIL |
Katelyn Menuge
|
|
|
A Design Review approval is required prior to building permit review.
|
Routing - FIRE | 4/16/2018 | 4/16/2018 | 5/4/2018 | | PASS |
Erika Akin
|
|
|
No comments attached. Battery capacity is 26.09 gallons VRLA, no smoke detection required or provisions of 608 apply.
|
Route to Impact Fee Review | 5/1/2018 | 5/4/2018 | 5/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 4/16/2018 | | 5/1/2018 | | PASS |
Michael Hanson
|
|
|
Per Dave Haugland
|
Plan Reviewer's activity | | | 5/1/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 5/1/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Drainage | 4/17/2018 | | 4/17/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 4/16/2018 | | 4/17/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/16/2018 | | 4/17/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 4/16/2018 | | 4/17/2018 | | PASS |
Michael Zawacki
|
|
|
Waiver approved. Contractor required to act as RP.
|
Intake Approval | | | 4/16/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/16/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/16/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/16/2018 | | DONE |
|
|
|
|
Routing - Design Review | 4/16/2018 | | 4/16/2018 | | FAIL |
Katelyn Menuge
|
|
|
Please submit a zoning certificate for review of the proposed fencing.
|
Routing - PLANNING | 4/16/2018 | | 4/16/2018 | | FAIL |
Celine Acord
|
|
|
Access to the site not detailed. Zoning certificate required for fencing per CUP17-00035
|
Plan Reviewer's activity | | | 4/14/2018 | | PASS |
|
|
|
Plan intake review approved
|
Plan assigned to (M_H) | 4/16/2018 | | 4/13/2018 | | DONE |
Michael Hanson
|
|
|
05/30 AT&T Monopole New - 1st review completed - Comments from planning and design review. MDH
6/13/18 per eplan
|
Intake Approval | | | 2/28/2018 | | FAIL |
|
|
|
(2-28-18) See the circled item without the "OK" in the circle in the plan intake checklist. Please resolve this item by uploading the completed form. CJW
|
Intake Approval | | | 2/16/2018 | | FAIL |
|
|
|
(2-16-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as noted. CJW
|
Application received | | | 2/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 6 2018 12:23PM
|