BLD-Final | 5/23/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### x123 Inspection requested via web by Roger Baumchen
|
DOC - Permit Finaled | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/25/2019 | 4/25/2019 | 5/2/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/24/2019 | 4/24/2019 | 5/2/2019 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 12/10/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Interior framing Inspection requested via web by Roger Baumchen
|
Plan Modification Accepted | | | 11/14/2018 | | DONE |
|
|
|
New manual j
|
Routing - MECHANICAL | 11/14/2018 | | 11/14/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Energy code compliance | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
Dave Hannah
|
|
|
Roger Phone #: ###-####
|
BLD-Framing/Rough-in | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Dave Hannah
|
|
|
Roger Phone #: ###-####--would like late afternoon on this one
|
BLD-Footing | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | PASS |
Dave Hannah
|
|
|
Roger--footing inspection for roof alteration Phone #: ###-####
|
BLD-Energy code compliance | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PART |
Brandon Shaw
|
|
|
Studio and garage
|
OVERRIDE | | | 5/17/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 5/17/2018 | 5/17/2018 | 5/17/2018 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 5/17/2018 | 5/17/2018 | 5/17/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/17/2018 | | 5/17/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/17/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/17/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 5/17/2018 | | DONE |
|
|
|
came in for a plan mod for adding a dormer to front of building-sent to JAB
|
CHANGE STATUS TO (ISS) | | | 5/17/2018 | | DONE |
|
|
|
plan mod no fee per josh
|
Meeting | | | 5/17/2018 | | DONE |
|
|
|
as per Rita, if Roger is turning the small room in garage into an ADU he needs to go through P&Z first, then Roger will need to submit a new permit for that ADU and must be routed to all dept's for review and impact fees
|
BLD-Framing/Rough-in | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Dave Hannah
|
|
|
garage/studio - Roger Phone #: ###-#### need to check air seal
|
Routing - MECHANICAL | 4/23/2018 | | 4/23/2018 | | PASS |
Troy James
|
|
|
manual j report
|
BLD-Wall Bracing | 4/12/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Dave Hannah
|
|
|
Roger Phone #: ###-####
|
BLD-Foundation | 3/20/2018 | 3/21/2018 | 3/21/2018 | A | PASS |
Dave Hannah
|
|
|
late AM please // Roger Phone #: ###-####
|
BLD-Footing | 3/12/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Dave Hannah
|
|
|
Roger (alley in the back is best access) Phone #: ###-####
|
OVERRIDE | | | 2/28/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/28/2018 | | 2/28/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/28/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/28/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/28/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/28/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/28/2018 | | DONE |
|
|
|
|
Application received | | 2/28/2018 | | | |
|
|
|
|