Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-00981
StatusFinaled
Name ARBOR FINISH CARPENTRY INC
Site Address 2821 W GOODING ST
Project NameEby addition
Customer Number 
ePlanReviewNo
Description
DRH18-00042, DRH17-00442 - Permit for an addition and remodel that involves adding 248sq' to the main floor and a 919sq' upper level. Work involves a new front porch, removal of some existing bearing walls, and removal of the entire roof. All work per plans, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/13/20192/13/20192/14/2019PPASS
DetailsDave Hannah
Chris Phone #: ###-####
DOC - Permit Finaled2/14/20192/14/20192/14/2019APASS
DetailsDave Hannah
BLD-Framing/Rough-in11/13/201811/14/201811/14/2018APASS
DetailsDave Hannah
Fire place was installed, inspected and approved. I need approval to dry wall fire place. Phone #: ###-#### Inspection requested via web by Chris Eby
BLD-Energy code compliance11/8/201811/9/201811/9/2018APASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Framing/Rough-in11/8/201811/9/201811/9/2018APART
DetailsDave Hannah
Chris Phone #: ###-#### everything but fireplace ok to rock
BLD-Framing/Rough-in11/7/201811/7/201811/8/2018PPART
DetailsDave Hannah
Please call 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Chris Eby ok to insulate needs to fire block mec chasses and add piont loads studs under beams
BLD-Energy code compliance11/7/201811/7/201811/8/2018PPART
DetailsDave Hannah
Please call 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Chris Eby air seal ok
BLD-Wall Bracing11/7/201811/7/201811/7/2018PPASS
DetailsDave Hannah
Please call 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Chris Eby
Plan Modification Accepted  10/11/2018 DONE
New manual j report
Routing - MECHANICAL10/11/2018 10/11/2018 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Foundation4/20/20184/23/20184/23/2018APASS
DetailsDave Hannah
Wall - Zach Phone #: ###-####
BLD-Foundation4/17/20184/19/20184/19/2018PPASS
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Footing4/5/20184/6/20184/6/2018PCANC
DetailsDave Hannah
Zack-pour wall in aft Phone #: ###-####
BLD-Footing4/5/20184/6/20184/6/2018ACANC
DetailsDave Hannah
Zack Phone #: ###-####
OVERRIDE  4/2/2018  
Routing Walk-In (BLD)4/2/20184/2/20184/2/2018PDONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh3/20/20183/20/20184/2/2018 PASS
DetailsJosh Bogle
1st done - see e-mail 3/27 to Ward for needed details
Routing - PLAN CHECK4/2/2018 4/2/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  4/2/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  4/2/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/2/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  4/2/2018 DONE
Issue PAID IN FULL permit  4/2/2018 DONE
1st review completed  3/27/2018 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK3/20/2018 3/27/2018 FAIL
DetailsJosh Bogle
Routing - MECHANICAL3/20/2018 3/23/2018 PASS
DetailsTroy James
Routing Walk-In (Zoning)3/20/20183/20/20183/20/2018PDONE
DetailsSue Cummings
Routing Walk-In (BLD)3/20/20183/20/20183/20/2018PPASS
DetailsJosh Bogle
took in as a level 2 to route to Mech
Application received 3/20/2018