Permit Information
Permit NumberBLD18-01050
StatusIssued
Name LANE MARTHA
Site Address 1003 E GREENWOOD CIR
Project NameLane-Peterson Addition
Customer Number 
ePlanReviewNo
Description
MODIFICATION - DETACHED STRUCTURE REDUCED TO 980SQ' 8/28/18 **jab** MODIFICATION - A DETACHED STRUCTURE THAT INCLUDES A 400SQ' GARAGE WITH A 480SQ' SHOP WITH 480SQ' OF UPPER LEVEL STORAGE IS BEING ADDED TO THE SCOPE OF THIS PROJECT. **jab** Permit for a full house remodel that includes reconfiguring several rooms as well as adding 763sq'. Final floor plan is 3bd/2.5bth. All work per plans, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/28/20193/1/20193/1/2019PCANC
DetailsJim Storey
martha Phone #: ###-####
BLD-Foundation9/20/20189/21/20189/21/2018APASS
DetailsJim Storey
Tucker Phone #: ###-#### pend ing center pad at slab
BLD-Footing9/18/20189/19/20189/19/2018APASS
DetailsJim Storey
Luke Phone #: ###-####
OVERRIDE  8/28/2018  
Routing Walk-In (Zoning)8/28/20188/28/20188/28/2018PPASS
DetailsJeff Lowe
building modified to 990 square feet (28' along north, 38' on south
Routing Walk-In (BLD)8/28/20188/28/20188/28/2018PDONE
DetailsJosh Bogle
Routing - PLAN CHECK8/28/2018 8/28/2018 PASS
DetailsJosh Bogle
Case Summary (BLD)  8/28/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  8/28/2018 DONE
DetailsJosh Bogle
no Modification fee per reduced size/value
Permit Ready to Issue  8/28/2018 DONE
(F) Reprint permit  8/28/2018 DONE
CHANGE STATUS TO (ISS)  8/28/2018 DONE
Plan Modification Accepted  8/28/2018 DONE
add on will not fit-too big-Lane will be taking off top layer of addition
BLD-Wall cover8/2/20188/2/20188/2/2018PPASS
DetailsJim Storey
Douglass Phone #: ###-####
OVERRIDE  7/27/2018  
Plan assigned to (JAB) Josh7/27/20187/27/20187/27/2018 PASS
DetailsJosh Bogle
Routing - PLAN CHECK7/27/2018 7/27/2018 PASS
DetailsJosh Bogle
Case Summary (BLD)  7/27/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/27/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  7/27/2018 DONE
Inspection Record Card- Bld  7/27/2018 DONE
CHANGE STATUS TO (ISS)  7/27/2018 DONE
Plan Modification Accepted  7/27/2018 DONE
plan mnod-adding a detached garage to this permit-sent to JAB
Plan Modification Accepted  7/25/2018 DONE
New manual j report
Routing - MECHANICAL7/25/2018 7/25/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Framing/Rough-in7/18/20187/19/20187/19/2018APART
DetailsJim Storey
Douglas Phone #: ###-#### blk at bearing /header at pocket door/ ok to cover exterior and insulate.
Routing - MECHANICAL6/25/2018 6/25/2018 PASS
DetailsTroy James
Manual j report
BLD-Footing4/23/20184/24/20184/24/2018PPASS
DetailsBrandon Shaw
Annie-would like early PM pour 1:00 Phone #: ###-####
(F) Reprint permit  4/19/2018 DONE
OVERRIDE  4/16/2018  
Routing Walk-In (BLD)4/16/20184/16/20184/16/2018ADONE
DetailsJosh Bogle
Routing - PLAN CHECK4/16/2018 4/16/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  4/16/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  4/16/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/16/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  4/16/2018 DONE
DetailsChristina Prado
Need:
GC Form
Application signed & re-scanned
Telephone call  4/16/2018 DONE
DetailsChristina Prado
Called Doug to advise permit is ready pending completed application & gc form and gave fees due
Issue PAID IN FULL permit  4/16/2018 DONE
Routing Walk-In (Zoning)4/2/20184/2/20184/2/2018PPASS
DetailsNicolette Womack
Routing Walk-In (BLD)4/2/20184/2/20184/2/2018PFAIL
DetailsJosh Bogle
Routing - PLAN CHECK4/2/2018 4/2/2018 FAIL
DetailsJosh Bogle
1st review completed  4/2/2018 FAIL
DetailsJosh Bogle
Routing Walk-In (Zoning)3/27/20183/27/20183/27/2018AFAIL
DetailsAndrea Tuning
Waiting for appeal period to expire. Applicant may apply on March 30, 2018.
Application received 3/27/2018