BLD-Aging Inspection | 4/17/2020 | 4/17/2020 | 4/23/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/16/2020 | 4/16/2020 | 4/22/2020 | | PEND |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 4/3/2020 | 4/3/2020 | 4/3/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage (including roof drainage connection to the subdivision system and stabilization) is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Foundation | 12/3/2019 | 12/3/2019 | 12/4/2019 | P | PART |
Tony Young
|
|
|
Edgar Phone #: ###-####,, walls for planter ok,, work in progress
|
BLD-Footing | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Tony Young
|
|
|
edgar Phone #: ###-####,, planter/ retaining wall footings ok
|
PubWorks Subgrade Approval | 11/22/2019 | 11/22/2019 | 11/22/2019 | | DONE |
Melissa Jannusch
|
|
|
*PLANTER RWALLS* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 11/1/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 10/22/2019 | 10/22/2019 | 11/1/2019 | | DONE |
Rob Patrick
|
|
|
plan mod for landscaping/grading changes and added retaining wall for landscaping. Reopened FNL permit. Will need footing and final insepctions from building and need subgrade insepction for PW
|
Routing - PLAN CHECK | 10/22/2019 | | 11/1/2019 | | PASS |
Rob Patrick
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/1/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 11/1/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/24/2019 | | DONE |
|
|
|
received email from Andy Long ESC insp, not need to reopen ESC permit for plan modification. See email in documents of ESC permit.
|
Plan Reviewer's activity | | | 10/22/2019 | | |
|
|
|
Clayton to call owner to determine if 2' landscape wall is to continue across the entire back of property and call me with answer on 10/23.
|
Plan Modification Accepted | | | 10/22/2019 | | DONE |
|
|
|
landscaping/grading changes and added retaining wall for landscaping. Reopened FNL permit. Will need footing and final insepctions from building and need subgrade insepction for PW.
|
CHANGE STATUS TO (REV) | | | 10/22/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 9/27/2019 | | 10/22/2019 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD APPROVED. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLANNING Land Div | 9/27/2019 | | 10/2/2019 | | PASS |
Leon Letson
|
|
|
|
Plan Modification Accepted | | | 9/24/2019 | | DONE |
|
|
|
Started plan mod workflow for modifications to landscaping to adjust bond amount under BND19-00161. New plans will be uploaded to eplan only for approved plan records.
|
BLD-Blower Door Test Results | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | DONE |
Tony Young
|
|
|
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner/// 1.9
|
DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Tony Young
|
|
|
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner// glazing by front door is one piece per contractor/ window rep and has acid etch on bottom.. ok
|
BLD-Final | 9/17/2019 | 9/17/2019 | 9/17/2019 | A | PEND |
Tony Young
|
|
|
Please call chris when you are on your way. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner// corrections made ok except need to verify the tempered glass is in one plane or divided up.. in which all panes w/in 24" of the front door would need to be temperd
|
BLD-Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | FAIL |
Jim Storey
|
|
|
Chris and clay are in and out of cell service. Please call tucker at ###-#### for approved set of plans. Phone #: ###-#### Inspection requested via web by Clayton Conner// c/n posted saftey glazing at entry/ landing at grage passage exterior/ egress window well fill or ladder basment.
|
PubWorks Occupancy Approval | 9/6/2019 | 9/6/2019 | 9/6/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PART |
Tony Young
|
|
|
Please call Chris when you are on your way. Phone #: ###-#### Inspection requested via web by Clayton Conner,, ok to move items into basement area
|
BLD-Aging Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/26/2019 | 6/26/2019 | 6/27/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Tony Young
|
|
|
Insulation Inspection. thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Framing/Rough-in | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | PASS |
Tony Young
|
|
|
Sheetrock Overhang Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner,, soffits ok
|
BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Energy code compliance | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | DEFR |
Dave Hannah
|
|
|
Caulk and seal and framing inspection. Please call before hand as permit plans are in the trailer. Thank you, Clayton Phone #: ###-#### Inspection requested via web by Clayton Conner out of time
|
Plan Modification Accepted | | | 12/20/2018 | | DONE |
|
|
|
New manual j report.
|
Routing - MECHANICAL | 12/20/2018 | | 12/20/2018 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Wall Bracing | 12/10/2018 | 12/10/2018 | 12/10/2018 | A | DONE |
Tony Young
|
|
|
Finishing up the shear inspection. Phone #: ###-#### Inspection requested via web by Clayton Conner,, exterior done
|
BLD-Wall Bracing | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | PART |
Tony Young
|
|
|
Partial Shear Wall Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner,, exterior ok after minor fixes
|
BLD-Foundation | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro. Foundatio and basement walls ok.
|
BLD-Footing | 8/1/2018 | 8/1/2018 | 8/1/2018 | A | PART |
Tony Young
|
|
|
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro,, work in progress
|
PubWorks Subgrade Approval | 7/23/2018 | 7/23/2018 | 7/23/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 6/11/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/11/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/11/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/10/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 4/24/2018 | 4/24/2018 | 5/10/2018 | | DONE |
Rob Patrick
|
|
|
5/11 sfd L2 ePlan
|
Routing - PLAN CHECK | 4/24/2018 | | 5/10/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 5/10/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/10/2018 | | DONE |
|
|
|
met
|
Routing - PLANNING | 4/24/2018 | | 5/9/2018 | | PASS |
Leon Letson
|
|
|
|
Routing PW Grading-Hillside | 4/24/2018 | | 4/30/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - MECHANICAL | 4/24/2018 | | 4/26/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 4/24/2018 | 4/27/2018 | 4/25/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 4/24/2018 | 4/24/2018 | 4/25/2018 | | PASS |
Tim Frost
|
|
|
5/04 house eplan
|
Routing - Erosion and Sediment | 4/24/2018 | | 4/25/2018 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Certified PD and RP designated. Site preparation inspection is required.
|
Routing - Addressing | 4/24/2018 | | 4/24/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/24/2018 | | 4/24/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/24/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 4/10/2018 | | FAIL |
|
|
|
4/10/18 The Structural engineering calculations and some of the structural sheets still reference 2012 IRC/IBC. In lieu of redoing the plans and calcs, we will accept a letter addendum sealed by the engineer stating something to the effect that the results will not change under the 2015 IBC. If you have any questions please call Tisha Gallop at ###-####. Thank you.
|
Intake Approval | | | 4/9/2018 | | FAIL |
|
|
|
Update to 2015 IRC codes
|
Application received | | | 4/5/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 5 2018 11:48AM
|