Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-01190
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 13255 W MCMILLAN RD
Project NamePioneer Elementary Gymnasium
Customer Number 
ePlanReviewYes
Description
(PIONEER ELEMENTARY – GYMNASIUM) // 10-1-18 PLAN MOD TO USE SPRAYED APPLIED FIREPROOFING MATERIAL FOR 1-HOUR RATING AT COLUMNS PER G1.01. SPECIAL INSPECTION REQUIRED. JAR // **Permit to construct a new 8,926 square foot addition with gymnasium, 2 classrooms and associated support areas including restrooms, office, storage, and mechanical rooms on the existing Pioneer Elementary School campus. Work also includes general site work. Special inspections required per attached Form 310. All work per the approved plans and notations. This building is fully fire sprinklered for area increase and is fully alarmed. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/15/2019 DONE
Per Kim Harp with West Ada School district, a statement with their name was emailed over to her so the company could pay for the final value fees. See documents for emails (harp.kimberly@westada.org)
Print Statement  3/14/2019  
Print Statement  2/14/2019 DONE
Print Statement  2/8/2019 DONE
First Notice 1/14/20192/6/2019 DONE
emailed in 306 for final value
Print Statement  2/6/2019 DONE
BLD-Final1/4/20191/4/20191/4/2019PPASS
DetailsJim Sly
Request for Final Occupancy. The last piece of panic hardware is currently being installed and should be complete by 2pm. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
OK for Perm. Occ.
Permanent Occupancy  1/4/2019 DONE
Temporary Occupancy1/3/20194/3/20191/3/2019 DONE
DetailsCandy A. Nichols
Temporary Occupancy1/3/20194/3/20191/3/2019 DONE
DetailsCandy A. Nichols
FIRE-Final Inspection1/2/20191/2/20191/2/2019PPASS
DetailsTroy Cobbley
Life safety passed


Request for Life Safety Final inspection. Please contact Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Other1/2/20191/2/20191/2/2019PCANC
DetailsJim Sly
Life and Safety inspection request. Fire alarm final is this morning. I''m thinking that we could just do this when fire alarm is complete. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Final1/2/20191/2/20191/2/2019PPART
DetailsJim Sly
OK for Temp. Occ. OK for Perm. Occ. when Panic Hardware is installed on Select classroom Exterior Exit Door.
PubWorks Occupancy Approval12/21/201812/21/201812/21/2018 DONE
DetailsTiffany Lowery
BLD-Conference12/19/201812/20/201812/20/2018PPASS
DetailsJim Sly
Building walk through prior to final. Please call Dan with any issues. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Conference11/28/201811/29/201811/29/2018PDEFR
DetailsMike Jordan
Request for project walk through and occupancy requirements forthcoming. Please try to stop by after 1pm due to meetings. Call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in11/14/201811/14/201811/14/2018APASS
DetailsJim Sly
Fire walls and lid inspections for hallway, classrooms and bathrooms. Please contact Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in11/5/201811/5/201811/5/2018ADONE
DetailsJim Sly
Final screw pattern inspection request on wood sheeting inside the gym. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in11/2/201811/2/201811/2/2018PPART
DetailsJim Sly
Screw pattern inspection request for the north wall of the gym. This is along grid line 5 between grids A and B. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski OK
BLD-Framing/Rough-in10/30/201810/31/201810/31/2018APASS
DetailsJim Sly
Screw pattern inspection request along west wall of the gym. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Energy code compliance10/30/201810/30/201810/30/2018PPART
DetailsJim Sly
Fire lid inspection for the bathrooms, hallway, and classrooms. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Framing/Rough-in10/23/201810/23/201810/23/2018APART
DetailsJim Sly
Request for wall sheeting screw pattern inspection in the gym. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
12 foot section in S. E. corner.......OK.
BLD-Conference10/18/201810/18/201810/18/2018PDONE
DetailsJim Sly
Request for consult with Plumbing Contractor and Architect this afternoon. Please call Dan to confirm what time works best. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Energy code compliance10/16/201810/17/201810/17/2018APART
DetailsJim Sly
Inspection of Fire Lid request for rooms and hallway south of grid 3. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
Fix ceiling penitrations built wit dissimilar materials.
BLD-Other10/4/201810/5/201810/5/2018PPASS
DetailsJim Sly
Spray applied fire proofing on columns. (grid line C between 3-5) Phone #: ###-#### Inspection requested via web by Scott Hilbert
5 columns......MTI inspected.
BLD-Other10/4/201810/5/201810/5/2018APART
DetailsJim Sly
Above ceiling fire taping. Phone #: ###-#### Inspection requested via web by Scott Hilbert
Select rooms........
BLD-Energy code compliance10/3/201810/4/201810/4/2018APART
DetailsJim Sly
Insulation and vapor barrier Phone #: ###-#### Inspection requested via web by Scott Hilbert
Select area......
BLD-Other10/3/201810/4/201810/4/2018APASS
DetailsJim Sly
Shear wall screw inspection Phone #: ###-#### Inspection requested via web by Scott Hilbert
OVERRIDE  10/2/2018  
Plan assigned to (JAR)9/25/20189/25/201810/2/2018 DONE
DetailsJulie Romig
1st Rev Comp - Plan Mod Pioneer Elementary
CHANGE STATUS TO (ISS)  10/2/2018 DONE
Print Occupancy Form  10/2/2018 DONE
Routing - PLAN CHECK10/2/2018 10/2/2018 PASS
DetailsJulie Romig
Permit Ready to Issue  10/2/2018 DONE
Plan Mod Approved
DO Not ReIssue (plan mod fees due)
Routing - PLAN CHECK9/26/2018 10/1/2018 FAIL
DetailsJulie Romig
Need Form 310 Special Inspections for Spray Applied Fireproofing material.
Plan Modification Accepted  9/25/2018 DONE
Use spray applied fireproofing per UL X771 1-hour assembly in place of gypsum board 1-hour assembly (OL X528) at 3 locations
BLD-Framing/Rough-in9/21/20189/21/20189/21/2018APART
DetailsJim Sly
Request for fire lid inspection along grid 1 between classroom entry doors 110B and 103B. This alcove is exterior fire lid. Please call Dan with any questions. Phone #: ###-####
Inspection requested via web by Dan Koski
OK
BLD-Framing/Rough-in9/20/20189/20/20189/20/2018PPART
DetailsJim Sly
Inspection of encapsulated columns requested. Columns along grid 2 and the intersection of grids 5/B are ready. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
Above items......OK.
BLD-Other9/17/20189/17/20189/17/2018PDONE
DetailsJim Sly
Air Barrier inspection request. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
90 percent complete. MTI providing special inspections.
BLD-Framing/Rough-in9/6/20189/6/20189/6/2018PDONE
DetailsJim Sly
Consult request for fire ratings and column encapsulation. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
Defer to Architect of record.
BLD-Framing/Rough-in9/5/20189/5/20189/5/2018PPART
DetailsJim Sly
Exterior DensGlas screw pattern inspection request. Please call Dan with questions. MTI was out yesterday looking at the same thing Phone #: ###-#### Inspection requested via web by Dan Koski
Gym Ok pending MTI special insp.and approval.
BLD-Framing/Rough-in8/22/20188/23/20188/23/2018APART
DetailsJim Sly
Request for framing inspection on Gym and Classroom exterior walls. Please call Dan with any questions. Special inspection is scheduled as well. Phone #: ###-#### Inspection requested via web by Dan Koski
Classroom and Gym Exterior walls and hold downs OK. MTI on site for welded connections.
BLD-Other7/31/20187/31/20187/31/2018PDEFR
DetailsJim Sly
Request for inspection of Seepage bed before fabric and rock install. The Land Group is scheduled to come out as well. Please call Dan with any concerns. Phone #: ###-####
Inspection requested via web by Dan Koski
Advised contr. to Call Public Works.
BLD-Framing/Rough-in7/30/20187/31/20187/31/2018APART
DetailsJim Sly
Request for install procedures, proper insulation, and overall framing request. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
BLD-Other7/26/20187/27/20187/26/2018PPASS
DetailsJim Sly
Rebar and Vapor Barrier inspection request for the remainder of the building slab. This will complete our interior slab from grid lines A-D and 1-5. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
OK pending MTI special inspection, tests and approvals.
BLD-Other7/26/20187/26/20187/26/2018APART
DetailsJim Sly
Masonry rebar inspection request for the trash enclosure. Grouting this at 12pm. We will have MTI on site to take samples and check rebar as well. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
OK pending MTI special inspections, tests and approvals.
BLD-Concrete7/20/20187/20/20187/20/2018APART
DetailsJim Sly
Gym slab rebar and vapor barrier inspection request. The slab is scheduled to place next Monday. PM inspection is fine as well the area ready at any time. Please call Dan with any concerns. Phone #: ###-#### Inspection requested via web by Dan Koski
Slab OK pending MTI special inspection, tests and approvals.
BLD-Footing7/17/20187/17/20187/17/2018PPASS
DetailsBrandon Shaw
Rebar inspection for spread footings along grid C and grids 4;5. Trash enclosure rebar in the footing requested as well. MTI is scheduled for special inspection as well.
BLD-Foundation7/13/20187/13/20187/13/2018APASS
DetailsJim Sly
Request for inspection on the rebar in the concrete stem walls. Perimeter stem walls and gym walls being placed this afternoon. Grids 1-5 and A-D. Please call Dan with any concerns.
Phone #: ###-#### Inspection requested via web by Dan Koski
OK .....Pending MTI special inspections, tests and approvals.
BLD-Footing7/9/20187/10/20187/10/2018APASS
DetailsJim Sly
Rebar inspection request for the footing placement scheduled this afternoon. Grids A-D, and 1-5. Please call Dan with any questions. Thanks Phone #: ###-#### Inspection
requested via web by Dan Koski
OK Pending MTI special inspections, Tests and Approvals.
BLD-Conference6/25/20186/26/20186/26/2018ADONE
DetailsJim Sly
Pioneer Elementary overview and plans for the project. Please call Dan with any questions. Phone #: ###-#### Inspection requested via web by Dan Koski
Issue PAID IN FULL permit  6/13/2018 DONE
Print Occupancy Form  6/13/2018 DONE
OVERRIDE  6/11/2018  
Plan assigned to (JAR)4/26/20184/26/20186/11/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 3rd Rec'd - **Expedite** - 502 Pioneer Elementary
Routing - PLAN CHECK6/8/2018 6/11/2018 PASS
DetailsJulie Romig
Routing Off Site - STRUCTURAL6/8/2018 6/11/2018 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  6/11/2018 DONE
Permit Ready to Issue  6/11/2018 DONE
NEED - all met
RP
GC FORM - met
REVISED VALUE - met
Routing Off Site - STRUCTURAL5/25/2018 6/7/2018 FAIL
DetailsJulie Romig
Failed per ePlan
Routing - PUBLIC WORKS4/26/2018 6/7/2018 PASS
DetailsMorgan Webb
Routing - PLAN CHECK5/25/2018 6/6/2018 FAIL
DetailsJulie Romig
Routing - ELECTRICAL5/25/2018 5/26/2018 PASS
DetailsJavier Guzman
Route to Impact Fee Review5/9/20185/12/20185/10/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE4/26/20184/26/20185/9/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK4/26/2018 5/9/2018 FAIL
DetailsJulie Romig
1st review completed  5/9/2018 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL4/26/2018 5/1/2018 FAIL
DetailsJulie Romig
Routing - ELECTRICAL4/26/2018 4/30/2018 FAIL
DetailsJavier Guzman
Routing PW Sewer Design4/26/2018 4/27/2018 PASS
DetailsDeAnn Brown
New building sewer connected to existing private 8-inch sewer pipeline. Connection to Boise City Sanitary Sewer at MH627H22.
Routing PW Solid Waste4/26/2018 4/27/2018 PASS
DetailsEvan Carpenter
Intake Approval  4/26/2018 PASS
Routing - PLUMBING4/26/2018 4/26/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING4/26/2018 4/26/2018 PASS
DetailsNicolette Womack
Routing - Addressing4/26/2018 4/26/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  4/26/2018 DONE
Recd Pcfee & Taken To Pln CK  4/26/2018 DONE
Routing PW Drainage4/26/2018 4/26/2018 PASS
DetailsBrian Murphy
Routing PW Street Lights4/26/2018 4/26/2018 PASS
DetailsTom Marshall
Routing - MECHANICAL4/26/2018 4/26/2018 PASS
DetailsTroy James
Routing - Erosion and Sediment4/26/2018 4/26/2018 PASS
DetailsAndy J. Long
ESC site map and plan narrative approved. RP to be desiganted by Beniton Construction, required before permit issue. Site preparation inspection is required.
Intake Approval  4/16/2018 FAIL
DetailsMichael Hanson
Missing completed and signed #304 form. MDH
Application received  4/6/2018 DONE
Application submitted via PDS Online on Apr 6 2018 12:44PM