Telephone call | | | 1/8/2020 | | DONE |
|
|
|
Central District health: Received a VM and a signed inspection card from Dinko Milkovic of Central District Health saying that he did indeed perform an inspection of the facility and it passed. He emailed me a copy of the occupancy request with his signature. See DOCS
|
Print Occupancy Form | | | 1/7/2020 | | DONE |
|
|
|
|
BLD-Aging Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | | DONE |
Tell Riley
|
|
|
Final passed
|
BLD-Aging Inspection | 6/26/2019 | 6/26/2019 | 6/26/2019 | | DONE |
Tell Riley
|
|
|
final passed//see below// BLD-Final 2/11/2019 2/11/2019 2/12/2019 P PASS DetailsJim Sly
|
BLD-Final | 2/11/2019 | 2/11/2019 | 2/12/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 2/8/2019 | 2/8/2019 | 2/11/2019 | | CANC |
Jim Sly
|
|
|
|
BLD-Final | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kenny Elumbaugh OK for Perm Occ.
|
FIRE-Final Inspection | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed, the lock was blanked off at the beer cooler, two CO detectors have been installed and Bob Tikker provided letter to delete the two duct smoke detectors.
Phone #: ###-#### Inspection requested via web by Kenny Elumbaugh
|
BLD-Final | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | NR |
Jim Storey
|
|
|
Please late as possible. Thank you Phone #: ###-#### Inspection requested via web by Kenny Elumbaugh fire failed
|
FIRE-Final Inspection | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action ADA hardware for the beer cooler, provide the duct smoke detectors per the approved drawings or get engineer approval to delete since the units are only 1600cfm, provide the CO ventilation and detection system as per review note #11
Phone #: ###-#### Inspection requested via web by Kenny Elumbaugh
|
FIRE-Final Inspection | 9/20/2018 | 9/24/2018 | 9/24/2018 | A | FAIL |
Troy Cobbley
|
|
|
Missing the first two sheets of the drawings, missing small documents, missing sticker at door, fire extinguishers expired, need ADA complicant hardware on beer cave and restroom doors....ect.
Morgan Phone #: ###-####
|
Zoning Approval | 9/21/2018 | 9/21/2018 | 9/24/2018 | | DONE |
KayCee Babb
|
|
|
per CZC17-00303
|
Zoning Approval | 9/20/2018 | 9/20/2018 | 9/20/2018 | | FAIL |
KayCee Babb
|
|
|
Work not complete around 5:45pm 9-20-18. Another inspection is required.
|
BLD-Framing/Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Jim Sly
|
|
|
Morgan Phone #: ###-####
|
BLD-Wall Bracing | 8/7/2018 | 8/7/2018 | 8/8/2018 | P | PASS |
Jim Sly
|
|
|
Morgan Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/23/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/23/2018 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 6/16/2018 | 6/16/2018 | 7/20/2018 | | PASS |
Carl D Madsen
|
|
|
Jacksons food store L-3 Due 7/10
|
Routing - PLAN CHECK | 7/17/2018 | | 7/20/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/20/2018 | | DONE |
|
|
|
Need- all met
GC Form
Revised Cert of Value
|
Routing - Design Review | 7/19/2018 | | 7/19/2018 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 7/13/2018 | 7/16/2018 | 7/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/13/2018 | | DONE |
|
|
|
|
Routing - FIRE | 6/16/2018 | 6/16/2018 | 7/12/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 6/16/2018 | | 6/30/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 6/16/2018 | | 6/21/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLUMBING | 6/16/2018 | | 6/20/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Design Review | 6/16/2018 | | 6/20/2018 | | PASS |
KayCee Babb
|
|
|
per CZC17-00303
|
Routing PW Environmental | 6/18/2018 | | 6/19/2018 | | PASS |
Terry Alber
|
|
|
No grease abatement shown. If grease is found in sewer, retrofit will be required.
|
Routing - Addressing | 6/16/2018 | | 6/18/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/16/2018 | | 6/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/16/2018 | | 6/18/2018 | | PASS |
Michael Zawacki
|
|
|
TI. No ESC or waiver required. Contractors responsible for good house keeping and keeping a clean site. Failure to maintain site will require approved house keeping plan and an ESC permit.
|
Intake Approval | | | 6/13/2018 | | PASS |
|
|
|
|
Intake Approval | | | 5/10/2018 | | FAIL |
|
|
|
(5-10-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
|
Plan Reviewer's activity | | | 5/10/2018 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Application received | | | 4/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 30 2018 9:41AM
|