DOC - Permit Finaled | | | 1/28/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/28/2020 | | DONE |
|
|
|
|
BLD-Final | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Tell Riley
|
|
|
need passing final inspection to close out permit please//final was complete pending other required inspections//
|
First Notice | | 1/27/2020 | 1/17/2020 | | DONE |
|
|
|
Final value for BLD18-01882 and BLD18-03045 done together. Credit for value pulled on this permit applied toward final value on BLD18-03045.
|
Telephone call | | | 1/17/2020 | | DONE |
|
|
|
Called and left vm for Paul w/Burton Construction for clarification on final cert of value. //call back 1/23 excavator and landscaping plumbing permits not included in plumbing value..LEG
|
Letter of compliance/Occupancy | | | 1/13/2020 | | DONE |
|
|
|
|
Zoning Approval | 1/7/2020 | 1/7/2020 | 1/8/2020 | | PASS |
KayCee Babb
|
|
|
Per DRH17-00353 and DRH19-00555
|
Zoning Approval | 12/10/2019 | 12/10/2019 | 12/10/2019 | | FAIL |
KayCee Babb
|
|
|
Landscaping and fencing on site does not comply with DRH17-00353. A modification application is required to proceed.
|
PubWorks Occupancy Approval | 12/9/2019 | 12/9/2019 | 12/9/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PEND |
Tell Riley
|
|
|
Paul Phone #: ###-####//special inspection report provided for structural bolting, compaction, and concrete//final on shell ok pending zoning final and ACHD signature//
|
BLD-Final | 11/25/2019 | 11/26/2019 | 11/26/2019 | P | NR |
Tell Riley
|
|
|
Michael Phone #: ###-####//need final special inspections report//
|
FIRE-Final Inspection | 11/25/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Michael Phone #: ###-####
|
BLD-Foundation | 12/21/2018 | 12/26/2018 | 12/26/2018 | A | PART |
Tony Young
|
|
|
pour at 10 // zack Phone #: ###-####,, special inspector on site also,, work in progress
|
BLD-Footing | 12/7/2018 | 12/10/2018 | 12/10/2018 | A | PASS |
Jim Sly
|
|
|
Zack Phone #: ###-#### OK pending MTI special inspection, tests and approvals.
|
Issue PAID IN FULL permit | | | 10/23/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/23/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 10/17/2018 | 10/22/2018 | 10/17/2018 | | PASS |
Eric Bilimoria
|
|
|
|
OVERRIDE | | | 9/4/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 6/13/2018 | 6/13/2018 | 9/4/2018 | | DONE |
Julie Romig
|
|
|
08/27 - 2nd Rev - 1st Rev Comp - 502 Burton Construction New
|
Routing Off Site - STRUCTURAL | 8/21/2018 | | 9/4/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/4/2018 | | DONE |
|
|
|
Need- all met
RP-met
ACDH-met
GC Form-met
Revised Cert of Value-MET
|
Routing - FIRE | 8/24/2018 | 8/24/2018 | 8/24/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Solid Waste | 8/21/2018 | | 8/22/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Sewer Design | 8/21/2018 | | 8/22/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing - Design Review | 8/21/2018 | | 8/22/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 8/21/2018 | | 8/22/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLANNING | 6/13/2018 | | 8/22/2018 | | PASS |
Susan Riggs
|
|
|
CVA17-00073
|
Routing - PLAN CHECK | 6/13/2018 | | 8/3/2018 | | FAIL |
Julie Romig
|
|
|
|
1st review completed | | | 8/3/2018 | | DONE |
|
|
|
|
Routing - FIRE | 6/13/2018 | 6/13/2018 | 7/24/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing Off Site - STRUCTURAL | 6/13/2018 | | 6/27/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 6/13/2018 | | 6/19/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 6/13/2018 | | 6/15/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Drainage | 6/13/2018 | | 6/15/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 6/13/2018 | | 6/14/2018 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 12 feet of unobstructed clearance between gate posts (measured from the innermost points).
|
Routing PW Sewer Design | 6/13/2018 | | 6/13/2018 | | FAIL |
DeAnn Brown
|
|
|
Please add sewer tap language shown in changemarks on sheet C2.0.
|
Routing PW Street Lights | 6/13/2018 | | 6/13/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - Addressing | 6/13/2018 | | 6/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/13/2018 | | 6/13/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/13/2018 | | 6/13/2018 | | PASS |
Michael Zawacki
|
|
|
Valid RP needed prior to ground disturbing activities.
|
Routing - PLUMBING | 6/13/2018 | | 6/13/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Design Review | 6/13/2018 | | 6/13/2018 | | FAIL |
Andrea Tuning
|
|
|
Install a wianscot on the front elevation.
Install a 5-foot wide pedestrian pathway that extends from the front of the building to Bethel Street.
Provide 2 bicycle parking spaces to be located within 50-feet of the buildings main entrance. The spaces shall be on improved non-permeable surfaces, anchored to the ground, a minimum of 6-feet long and 2.5-feet wide with 4-foot wide aisles between rows of bicycle parking spaces or nearby walls.
Install 4 Imperial Honey Locust trees along Bethel Street.
Construct terminal landscape planters at the terminus of each parking row. Each planter shall be 8-feet in width (measured inside of curb to inside of curb) and contain one Class II tree with low growing shrubs or ground cover.
Install a mixture of deciduous and evergreen trees, shrubs, or other vegetative groundcover that will create a visual barrier that provides a minimum of 60 percent of a barrier within five years of planting in order to adequately screen the residential property to the east.
Install slats within teh chain link fence.
|
Intake Approval | | | 6/8/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2018 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2018 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/7/2018 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
1. Please upload form #310 – Statement of Special Inspections. all the applicable areas of the #310 sheets must filled out completely with the cover sheet stamped, signed and dated by the Idaho licensed engineer and uploaded, form #310 can be found at our website at https://pds.cityofboise.org/media/104147/final310_special_inspections.pdf
2. All (29) of the R&M structural plan sheets are required to be on a minimum 18” x 24” plan sheets (currently they are all on 11” x 17” plan sheets)
|
Application received | | | 5/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2018 4:30PM
|