Permit Information
Permit NumberBLD18-02168
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5917 E HOOTOWL DR
Project NamePonderosa HN 62-1
Customer Number 
ePlanReviewYes
Description
PLAN MODIFICATION - 9-26-18 - (Adding square footage to interior of home by eliminating two story ceiling over Living Room and adding a game room in that area. Increasing home by 259 square feet of Living Space. ***BJM***) HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3,156 sq. ft., two story (first story 1,748 sq. ft., second story 1,408 sq. ft.) single family dwelling with 4 bedrooms, 3 and a half bathrooms, approximately 346 sq. ft. of covered patio/porch and a 920 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. Prescriptive Energy Code is proposed. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/28/20193/1/20193/1/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled3/1/20193/1/20193/1/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results3/1/20193/1/20193/1/2019ADONE
DetailsBrandon Shaw
ACH50- 3.4
PubWorks Occupancy Approval2/28/20192/28/20192/28/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final2/26/20192/26/20192/26/2019PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance12/26/201812/27/201812/27/2018APASS
DetailsBrandon Shaw
Shaer corrections SAT, see latter from Engineer of record in Documents tab...
BLD-Framing/Rough-in12/14/201812/17/201812/17/2018APASS
DetailsBrandon Shaw
Approved revised plans on site...
New hold downs and floor to floor straps to be completely installed by Energy inspection...
OK to insulate...
BLD-Framing/Rough-in12/7/201812/7/201812/7/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Other12/5/201812/6/201812/6/2018APASS
DetailsBrandon Shaw
Soffit...
Plan Modification Accepted  11/27/2018 DONE
New manual j report
Routing - MECHANICAL11/27/2018 11/27/2018 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Wall Bracing11/14/201811/14/201811/14/2018PPART
DetailsBrandon Shaw
Work in progress...
Need revised Engineering submitted for review for omission of Strong Wall Panels, kitchen nook. Beam to replace Panels with floor trusses to be perpendicular or paralle to beam?
BLD-Wall Bracing11/13/201811/13/201811/13/2018PCANC
DetailsBrandon Shaw
Need current revised approved plans...
Two city sets on site, with wall brace, floor and roof drag truss Engineering not matching...
BLD-Foundation10/5/201810/5/201810/5/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation10/4/201810/4/201810/4/2018PCANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Thursday, October 04, 2018.
BLD-Footing10/3/201810/3/201810/3/2018PCANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing10/2/201810/3/201810/3/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing10/2/201810/2/201810/2/2018PNR
DetailsJim Storey
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
OVERRIDE  9/26/2018  
Plan assigned to (BJM)9/6/20189/6/20189/26/2018 DONE
DetailsBrian McGowan
plan mod
Routing - PLAN CHECK9/6/2018 9/26/2018 PASS
DetailsBrian McGowan
Permit Ready to Issue  9/26/2018 DONE
Plan Mod Approved
DO NOT REISSUE (fees due)
CHANGE STATUS TO (ISS)  9/26/2018 DONE
Inspection Record Card- Bld  9/26/2018 DONE
PubWorks Subgrade Approval9/6/20189/6/20189/6/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Plan Modification Accepted  9/6/2018 DONE
started workflow for plan mod to enclose open-to-below area above great room for second floor bonus room.
Issue PAID IN FULL permit  8/23/2018 DONE
Inspection Record Card- Bld  8/23/2018 DONE
OVERRIDE  8/7/2018  
Routing - FIRE8/7/20188/7/20188/7/2018 PASS
DetailsTim Frost
Plan assigned to (BJM)6/20/20186/20/20188/7/2018 DONE
DetailsBrian McGowan
2nd review complete. 1st Review Complete 7-9 sfd L2 ePlan
PLANS/APPL TAKEN TO FRONT DESK  8/7/2018 DONE
DetailsBrian McGowan
Permit Ready to Issue  8/7/2018 DONE
met
Routing - FIRE7/25/20187/25/20187/25/2018 FAIL
DetailsTim Frost
Previous comment was not addressed
Routing - PLAN CHECK7/25/2018 7/25/2018 PASS
DetailsBrian McGowan
1st review completed  7/9/2018 DONE
DetailsBrian McGowan
Routing - PLAN CHECK6/20/2018 7/9/2018 FAIL
DetailsBrian McGowan
Routing - Erosion and Sediment6/20/2018 7/9/2018 PASS
DetailsMichael Zawacki
Hillside lot. Site prep inspection required.
Routing - MECHANICAL6/20/2018 6/25/2018 PASS
DetailsChad Schwendiman
Route to Impact Fee Review6/20/20186/23/20186/21/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE6/20/20186/20/20186/21/2018 FAIL
DetailsTim Frost
7/09 New SFH ePlan

Fire flow information is missing.
Routing PW Grading-Hillside6/20/2018 6/20/2018 PASS
DetailsMelissa Jannusch


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Plans ACCEPTED BY PLAN TECH  6/20/2018 DONE
Recd Pcfee & Taken To Pln CK  6/20/2018 DONE
Intake Approval  6/20/2018 PASS
Routing - PLANNING6/20/2018 6/20/2018 PASS
DetailsJeff Lowe
Routing - Addressing6/20/2018 6/20/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/20/2018 6/20/2018 PASS
DetailsMorgan Webb
Application received  6/19/2018 DONE
Application submitted via PDS Online on Jun 19 2018 11:13AM