BLD-Blower Door Test Results | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Tony Young
|
|
|
Robert Phone #: ###-####//// 3.98
|
DOC - Permit Finaled | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Tony Young
|
|
|
Robert Phone #: ###-####
|
BLD-Final | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PART |
Tony Young
|
|
|
Robert Phone #: ###-####,, needs blower door test results
|
BLD-Energy code compliance | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Tony Young
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Tony Young
|
|
|
Robert Phone #: ###-####,, see paint,, header. truss,, ok to insulate
|
BLD-Framing/Rough-in | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | NR |
Tony Young
|
|
|
Robert Phone #: ###-####,, needs seal package
|
BLD-Wall Bracing | 12/14/2018 | 12/17/2018 | 12/18/2018 | P | PASS |
Dave Hannah
|
|
|
Robert Phone #: ###-####
|
BLD-Footing | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | DONE |
Tony Young
|
|
|
Nick-foundation wall-wlould like as early as possible Phone #: ###-####
|
BLD-Foundation | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PART |
Tony Young
|
|
|
Nick-foundation wall-wlould like as early as possible Phone #: ###-####,, work in progress,, ok
|
BLD-Foundation | 10/26/2018 | 10/29/2018 | 10/29/2018 | A | DEFR |
Mike Jordan
|
|
|
Rob Phone #: ###-####. Already inspected and passed by #415. Concret already placed when on site.
|
BLD-Footing | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-####,, work in progress,, ok
|
BLD-Foundation | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | PART |
Tony Young
|
|
|
Nick Phone #: ###-####,, house and garage ok,, porch needs to meet setbacks,, remove all roots etc,, work in progress..
|
Issue PAID IN FULL permit | | | 10/15/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/27/2018 | | |
|
|
|
|
Telephone call | | | 8/27/2018 | | DONE |
|
|
|
Called Robert to advise permit is ready and gave fees due
|
Inspection Record Card- Bld | | | 8/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/27/2018 | | DONE |
|
|
|
met
|
Plan assigned to (BJM) | 7/2/2018 | 7/2/2018 | 8/26/2018 | | DONE |
Brian McGowan
|
|
|
07/16 sfd L1 paper- !st review Complete - Corrections Required. Needs to pass Planning before Review can be done.
|
Routing - PLAN CHECK | 8/26/2018 | | 8/26/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/26/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/14/2018 | | 8/14/2018 | | FAIL |
Brian McGowan
|
|
|
Must meet Planning requirements for building separation. May need to take 2" out of Garage width or provide fire rated wall details.
|
Plan resubmittals received | | | 8/6/2018 | | DONE |
|
|
|
Two copies of sheets (garage) 2,3 and 4. Two copies of sheets (home) 1, 2, 3, 4, 5, 6, 7 and 8. Taken to Brian Mc
|
Routing - PLAN CHECK | | | 8/2/2018 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 8/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLANNING | 7/13/2018 | | 7/16/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Plan resubmittals received | | | 7/13/2018 | | DONE |
|
|
|
received two revised site plans full size and reduces size. put with plans at BJM's desk and routed to planning.
|
Routing - MECHANICAL | | | 7/5/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 7/2/2018 | 7/5/2018 | 7/3/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 7/3/2018 | | 7/3/2018 | | FAIL |
Colleen T Carroll
|
|
|
Failed, does not meet street side setback. Will need to relocate and provide new site plan.
|
Routing - PUBLIC WORKS | | | 7/3/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/2/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/2/2018 | | DONE |
|
|
|
|
Routing - Addressing | 7/2/2018 | | 7/2/2018 | | PASS |
Doug Chausow
|
|
|
|
Application received | | 7/2/2018 | | | |
|
|
|
|
Routing - PLANNING | 8/14/2018 | | | | FAIL |
Colleen T Carroll
|
|
|
Will need 6' of seperation for garage to get reduced setbacks.
|