Third Notice | | 4/16/2019 | 4/12/2019 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
Third Notice | | 3/12/2019 | 4/11/2019 | | DONE |
|
|
|
mailed 4-12-19
|
Third Notice | | 2/11/2019 | 3/7/2019 | | DONE |
|
|
|
mailed 3-11
|
Second Notice | | 1/18/2019 | 2/6/2019 | | DONE |
|
|
|
mailed 2-11-19
|
First Notice | | 12/16/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
BLD-Final | 12/6/2018 | 12/7/2018 | 12/6/2018 | A | PASS |
Dave Hannah
|
|
|
PER DAVE H
|
FIRE-Final Inspection | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire exitnguishers are in place with current inspection tags, hood fire suppresion system for pizza oven is not required per conversation with Adele Schaffeld-Griffin, Assistant Building Official. Final life fire safety inspection for area of work complete.
Please call before arrival. Thank you Phone #: ###-#### Inspection requested via web by David Sferle
|
Zoning Approval | 12/6/2018 | 12/6/2018 | 12/6/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Permanent Occupancy | | | 12/6/2018 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | PASS |
Dave Hannah
|
|
|
Please call before arrival. Phone #: ###-#### Inspection requested via web by David Sferle
|
FIRE-Conference | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | DONE |
Troy Cobbley
|
|
|
We discussed lowering the ceiling mounted strobes to the lowere "clouds" and fire extinguisher placement.
Phone #: ###-#### Inspection requested via web by David Sferle
|
BLD-Other | 11/28/2018 | 11/28/2018 | 11/28/2018 | P | DONE |
Dave Hannah
|
|
|
Please call before arrival. Question about floor sink fire sealing. Phone #: ###-#### Inspection requested via web by David Sferle
|
BLD-Ceiling Grid Inspection | 11/26/2018 | 11/26/2018 | 11/28/2018 | P | PEND |
Dave Hannah
|
|
|
Please call before arrival. Id like to have a consultation on existing grid. Thank you. Phone #: ###-#### Inspection requested via web by David Sferle
|
BLD-Ceiling Grid Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | CANC |
Mike Jordan
|
|
|
Please contact me upon arrival, this inspection is for kitchen area only. Need consultation for existing ceiling at front of house.
Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald. Kitchen area ok.
|
BLD-Framing/Rough-in | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Dave Hannah
|
|
|
Please call before arrival. Thank you Phone #: ###-#### Inspection requested via web by David Sferle
|
BLD-Framing/Rough-in | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | NR |
Dave Hannah
|
|
|
Please call before arrival. Located on the first floor south east corner. Phone #: ###-#### Inspection requested via web by David Sferle needs other trades and fire stopping on plumbing thru floor
|
Plan assigned to (CJW) | 7/23/2018 | 7/23/2018 | 9/18/2018 | | PASS |
Carl Westfall
|
|
|
(2nd done) 08/08/18 (L3 - 15 days) (ePlan - 27 sheets) Firenza
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2018 | | DONE |
|
|
|
Need
GC Form
Revised Cert of Value
|
Print Occupancy Form | | | 9/18/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/18/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 9/14/2018 | | 9/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 9/14/2018 | | 9/17/2018 | | PASS |
Bill VanDegrift
|
|
|
per ISPC
|
Routing - PLAN CHECK | 9/13/2018 | | 9/14/2018 | | PASS |
Carl Westfall
|
|
|
Drawings approved after 2nd review
|
Plan resubmittals received | | | 9/13/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 8/22/2018 | 8/25/2018 | 8/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 8/22/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 8/22/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/23/2018 | | 8/22/2018 | | FAIL |
Carl Westfall
|
|
|
Completed the 1st review. Sent the applicant a copy of the plan review report. Explained it to him on the phone.
|
Routing - FIRE | 7/23/2018 | 7/23/2018 | 8/14/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - MECHANICAL | 7/23/2018 | | 7/27/2018 | | FAIL |
Troy James
|
|
|
Talked to engineer on phone
|
Routing - PLUMBING | 7/23/2018 | | 7/24/2018 | | PASS |
Bill VanDegrift
|
|
|
|
Routing PW Environmental | 7/23/2018 | | 7/24/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing - Design Review | 7/23/2018 | | 7/24/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING | 7/23/2018 | | 7/23/2018 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 7/23/2018 | | 7/23/2018 | | PASS |
Doug Chausow
|
|
|
Suite 103
|
Routing - PUBLIC WORKS | 7/23/2018 | | 7/23/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 7/23/2018 | | 7/23/2018 | | PASS |
Michael Zawacki
|
|
|
Interior tenant improvement, no ESC waiver or plan required. If material or staging takes place outside than a waiver detailing storage plans will be required.
|
Intake Approval | | | 7/19/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 7/18/2018 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved.
In response to the redlines you have provided for the Major T.I. Submittal Checklist, the changes are as follows:
1.) The portable fire extinguishers have been added to sheet A-3.0 and the new sheet uploaded.
2.) The structural evaluation of the floor for the weight of the pizza oven has been uploaded to the documents folder as "2018-4-24 Ground Floor Evaluation".
3.) Under the "Accessibility Inside the Building" section, we have removed an existing entry that did not meet accessibility requirements (called out as note #5 on sheet A-2.0) and replaced with a new door (shown as note #19 on sheet A-3.0). The restrooms upgrades are being provided by the building owner (Oppenheimer Development), and are not a part of this submittal package.
4.) Under the "Mechanical Plans" section, here is an explanation from the engineer on where the make-up air is coming from:
"We are supplying 6600 CFM of air into the space with 5 mixing boxes and exhausting 1,300 CFM (300 CFM for the pizza oven and 1000 CFM for EF-2/general exhaust) . The remainder of the air returns to the main air handler via the return air plenum."
If you have any further questions or concerns, I will be out of the office for the remainder of the week. However, Jerrod Wallgren in our office will be happy to assist. His email is: jwallgren@jgt-architecture.com
Thank you, and have a good day!
Aaron M. Randell
|
Intake Approval | | | 7/16/2018 | | FAIL |
|
|
|
(7-16-18) Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
|
Intake Approval | | | 7/14/2018 | | FAIL |
Carl Westfall
|
|
|
(7-14-18) A plan intake review was not done. The ePlanReview standards were not followed. Review the submission standards and follow them. Each drawing sheet is required to be uploaded as an individual file in the drawings folder. The file name for each drawing shall be the same name as listed in the Drawing Index on Sheet A-1.0. Make sure all other standards are also followed.
|
Application received | | | 7/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2018 3:02PM
|