Permit Information
Permit NumberBLD18-02591
StatusFinaled
Name CONNER CONSTRUCTION LLC
Site Address 4033 N SANDPOINT WAY
Project NameDale Residence
Customer NumberCFH18-00065
ePlanReviewYes
Description
(HILLSIDE) (WUI ZONE 'A', FOOTHILLS) **PRESCRIPTIVE ENERGY METHOD** 310 SPECIAL INSPECTIONS REQUIRED SEE FORM** Permit for the construction of a new 2,770 sq. ft., two story (first story 2,174 sq. ft., second story 596 sq. ft.) single family dwelling with 3 bedrooms, 3 and a half bathrooms, approximately 200 sq. ft. of covered patio/porch and a 820 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. JJN

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/25/20199/27/20199/27/2019APASS
DetailsTony Young
Final Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
DOC - Permit Finaled9/27/20199/27/20199/27/2019PPASS
DetailsTony Young
c of o issued
BLD-Final9/26/20199/26/20199/26/2019PDEFR
DetailsTony Young
Final Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
PubWorks Occupancy Approval9/26/20199/26/20199/26/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Conference8/28/20198/28/20198/28/2019APART
DetailsTony Young
Please call chris on your way up. Phone #: ###-#### Inspection requested via web by Clayton Conner/// conf walk through on the final inspection,, needs blower door test, hand rails, guard rails, landings, etc
BLD-Framing/Rough-in4/25/20194/25/20194/25/2019PPASS
DetailsJim Sly
Framing , Fascia and Soffit Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Energy code compliance4/25/20194/25/20194/25/2019PPASS
DetailsJim Sly
Insulation Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Framing/Rough-in4/9/20194/9/20194/9/2019PPEND
DetailsBrandon Shaw
Pending Mech rough-in correction is satisfactory...
OK to insulate after Mech rough-in correction...
BLD-Framing/Rough-in4/8/20194/9/20194/9/2019ANR
DetailsTony Young
Framing Inspection Inspection requested via web by Clayton Conner// needs mech rough in passed,, re-scheduled myself for pm
BLD-Wall Bracing3/3/20193/4/20193/4/2019APASS
DetailsMike Jordan
Please call ahead of time as approved plans are in the trailer. Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Energy code compliance2/11/20192/12/20192/12/2019ANR
DetailsTony Young
Insulation Inspection. thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Foundation11/1/201811/1/201811/1/2018PPART
DetailsTony Young
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro,, work in progress..ok
BLD-Footing10/29/201810/29/201810/29/2018PPART
DetailsTony Young
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro,, house footings ok,, surveyed in,, work in progress ok
PubWorks Subgrade Approval10/24/201810/24/201810/24/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Foundation10/11/201810/12/201810/12/2018APART
DetailsTony Young
Phone #: 2084078920 >> Inspection requested via mobile web by Juan,, retaing wall,, work in progress
BLD-Foundation10/11/201810/11/201810/12/2018PPART
DetailsTony Young
As late as possible Phone #: 2084078920 >> Inspection requested via mobile web by Juan,, retaining wall,,
BLD-Footing9/26/20189/27/20189/27/2018APART
DetailsDave Hannah
As early as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes ftgs for retainning wall ok to place
PubWorks Subgrade Approval9/13/20189/13/20189/13/2018 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the retaining wall footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Grading Inspection8/30/20188/31/20188/31/2018ADEFR
DetailsTony Young
Erosion and Sediment Control Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner,, sent to Andy
Issue PAID IN FULL permit  8/30/2018 DONE
Inspection Record Card- Bld  8/30/2018 DONE
Plan assigned to (J_N)8/8/20188/8/20188/29/2018 DONE
Details
08/13 sfd L1 ePlan. 1st Review complete, engineer signatures, wui soffit compliance, 310 special inspection form
Routing - PLAN CHECK8/14/2018 8/29/2018 PASS
DetailsMichael Hanson
Per JJN Review. MDH
Routing PW Grading-Hillside8/29/2018 8/29/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
PLANS/APPL TAKEN TO FRONT DESK  8/29/2018 DONE
Details
Permit Ready to Issue  8/29/2018  
met
Routing - PLAN CHECK7/31/2018 8/14/2018 FAIL
DetailsMichael Hanson
1st review completed  8/13/2018 FAIL
Details
Engineer signatures, special inspection form, Wui soffit compliance
Routing - FIRE7/31/20187/31/20188/7/2018 PASS
DetailsTim Frost
8/13 SFH L1 ePlan
Routing PW Grading-Hillside7/31/2018 8/3/2018 FAIL
DetailsMelissa Jannusch
Hi Clayton,

Before I can approved the hillside review for BLD18-02591 4033 N SANDPOINT WAY 83702, I will need the following:

1. Work with the structural engineer to ensure that the retaining wall calculations match the proposed walls. Please have the structural engineer label calculations to reference the wall details for clarity.
This revision can be found as a changemark in ePlan as well. Once all reviewers have completed their review you will be able to upload any revised documents to ePlan.

Feel free to give me a call if you have any questions about the revisions.

Thanks!

Melissa
Routing - Erosion and Sediment7/31/2018 8/2/2018 PASS
DetailsAndy J. Long
ESC site map with project narrative approved. Certified stormwater team designated. Site preparation inspection is required.
Route to Impact Fee Review7/31/20188/3/20188/1/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL7/31/2018 7/31/2018 PASS
DetailsTroy James
Routing - PLANNING7/31/2018 7/31/2018 PASS
DetailsNicolette Womack
Retaining Walls within the front yard setback shall not exceed 3'.
Routing - Addressing7/31/2018 7/31/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/31/2018 7/31/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  7/31/2018 DONE
Recd Pcfee & Taken To Pln CK  7/31/2018 DONE
DetailsChristina Prado-BAD
Intake Approval  7/31/2018 PASS
DetailsChristina Prado-BAD
Plan assigned to (M_H)7/31/2018 7/31/2018 DEFR
DetailsMichael Hanson
08/13 sfd L1 ePlan
Intake Approval  7/30/2018 FAIL
Foundation Plan needs to be signed along with being stamped by a licensed engineer.
Application received  7/20/2018 DONE
Application submitted via PDS Online on Jul 20 2018 10:41AM