Permit Information
Permit NumberBLD18-02654
StatusFinaled
Name HC COMPANY INC
Site Address 871 E PARKCENTER BLVD
Project NameWestmark Credit Union
Customer Number 
ePlanReviewYes
Description
(WESTMARK CREDIT UNION) //Plan modification to remove select interior nonbearing office walls, removal of select door/door frame and relocate, construction of select interior nonbearing walls to create office #119, select new interior windows and select new suspended acoustic ceiling. 10-25-2018 JG// Permit is to remodel an existing 4,500 sq. ft. bank building. Approval is contingent upon adhering to the approved plans on file and attached engineering. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, removal of fireplace insert, removal of night deposit box and infill exterior wall, construction of interior non-bearing walls to create (2) offices, a storage room and a teller area, select wall infill, select new door/door frames, millwork, adding a vertical grab bar to the men’s and women’s restroom, select new acoustic suspended and gypsum soffit ceilings, light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Exterior site work limited to re-sealing and re-striping in the parking lot. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 1/6/201912/28/2018 DONE
sent in 12-26-18
Permanent Occupancy  12/27/2018 DONE
Meeting  12/26/2018 DONE
cameron mailed in final values on 306 form
Print Statement  12/26/2018 DONE
BLD-Final12/17/201812/18/201812/18/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Sean Worthington
FIRE-Final Inspection12/17/201812/17/201812/17/2018PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire exitnguishers are placed with current inspection tags. Sticker above door will be changed from doors to remain unlocked during business hours to "Door to remain unlocked while building is occupied" before building final. Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Sean Worthington
BLD-Final12/13/201812/13/201812/13/2018PFAIL
DetailsBrandon Shaw
Need Electrical and Fire/Life finals...
BLD-Ceiling Grid Inspection12/4/201812/5/201812/5/2018PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Sean Worthington
BLD-Framing/Rough-in11/5/201811/5/201811/5/2018APASS
DetailsJim Storey
Framing inspection at the new office that was added. It is at the front of the building space. Phone #: ###-#### Inspection requested via web by Sean Worthington
BLD-Framing/Rough-in11/1/201811/2/201811/2/2018PNH
DetailsJim Storey
Framing inspection for the office at the front of the building that was added to job. Phone #: ###-#### Inspection requested via web by Sean Worthington no access
Print Occupancy Form  10/29/2018 DONE
(F) Reprint permit  10/29/2018 DONE
revised
CHANGE STATUS TO (ISS)  10/29/2018 DONE
Permit Ready to Issue  10/26/2018 DONE
DO NOT ISSUE PLAN MOD
Plan assigned to (JG)10/22/201810/22/201810/25/2018 PASS
DetailsJavier Guzman
Plan Mod Westmark Credit Union
Routing - PLAN CHECK10/24/2018 10/25/2018 PASS
DetailsJavier Guzman
Plan Modification Accepted  10/22/2018 DONE
what used to be a customer lounge and a storage room will now be converted into an office. Also rather than using the existing ceiling grin in the entry and the new office, new grid will be installed. The lighting fixtures and hvac grilles will be reused
BLD-Framing/Rough-in10/17/201810/18/201810/18/2018PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Sean Worthington pending ele
Issue PAID IN FULL permit  9/14/2018 DONE
(F) Reprint permit  9/14/2018 DONE
Print Occupancy Form  9/14/2018 DONE
(F) Reprint permit  9/14/2018 DONE
Print Occupancy Form  9/14/2018 DONE
Permit Ready to Issue  9/10/2018 DONE
all met-NEED
GC FORM-met
REVISED VALUE-met
Plan assigned to (JG)8/3/20188/3/20189/8/2018 PASS
DetailsJavier Guzman
1st rev comp, 8/16 L2 Westmark Credit Union T.I.ePlan
Routing - PLAN CHECK9/7/2018 9/8/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/8/2018 DONE
Routing - PLAN CHECK8/23/2018 8/29/2018 FAIL
DetailsJavier Guzman
Route to Impact Fee Review8/22/20188/25/20188/22/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  8/22/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/3/2018 8/22/2018 FAIL
DetailsJavier Guzman
Routing - Addressing8/3/2018 8/3/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS8/3/2018 8/3/2018 PASS
DetailsMorgan Webb
Routing PW Drainage8/3/2018 8/3/2018 PASS
DetailsBrian Murphy
Intake Approval  8/3/2018 PASS
DetailsJavier Guzman
Intake Approval  7/30/2018 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Missing wall bracing detail. How are new interior walls secured?
Application received  7/25/2018 DONE
Application submitted via PDS Online on Jul 25 2018 1:55PM
Routing - Design Review8/3/2018   PASS
DetailsKayCee Babb
per DRH18-00295