Letter of compliance/Occupancy | | | 11/13/2019 | | DONE |
|
|
|
|
BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Jim Storey
|
|
|
Bobby Phone #: ###-####
|
DOC - Permit Finaled | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | DONE |
Jim Storey
|
|
|
Bobby Phone #: ###-#### 4.16
|
BLD-Energy code compliance | 11/19/2018 | 11/26/2018 | 11/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 11/19/2018 | 11/21/2018 | 11/21/2018 | A | PART |
Jim Storey
|
|
|
todd Phone #: ###-#### head height at stair/beam// smoke dec. min 24 from highest part of ceilling/ stair rim not insulated
|
BLD-Wall Bracing | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Jim Sly
|
|
|
Todd Phone #: ###-#### Ext. nailing only........OK.
|
BLD-Energy code compliance | 11/8/2018 | 11/9/2018 | 11/8/2018 | P | CANC |
Jim Storey
|
|
|
Todd Phone #: ###-####// canc per Todd, called in on wrong address 11/8/18 leg
|
BLD-Footing | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | CANC |
Jim Storey
|
|
|
Jose-pour time 3:00 Phone #: ###-####
|
Plan Modification Accepted | | | 10/22/2018 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 10/22/2018 | | 10/22/2018 | | PASS |
Troy James
|
|
|
|
Issue PAID IN FULL permit | | | 10/17/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/17/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/16/2018 | | |
|
|
|
|
Routing - FIRE | 10/16/2018 | 10/16/2018 | 10/16/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (RDP) | 8/21/2018 | 8/21/2018 | 10/16/2018 | | DONE |
Rob Patrick
|
|
|
08/27 sfd L1 ePlan...8/21 Failed: 9/27 Failed: More details required
|
Routing - PLAN CHECK | 10/16/2018 | | 10/16/2018 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/16/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/4/2018 | | 10/4/2018 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - FIRE | 9/27/2018 | 9/27/2018 | 10/3/2018 | | FAIL |
Tim Frost
|
|
|
Please, see attached review.
|
Routing - PLAN CHECK | 9/27/2018 | | 9/27/2018 | | FAIL |
Rob Patrick
|
|
|
Version 2 re-submittal is a new plan; More details required.
|
Routing - MECHANICAL | 9/27/2018 | | 9/27/2018 | | PASS |
Troy James
|
|
|
Version 2 re-submittal is a new plan
|
Routing - PLANNING | 9/27/2018 | | 9/27/2018 | | PASS |
Susan Riggs
|
|
|
Version 2 re-submittal is a new plan
|
Routing - PUBLIC WORKS | 9/27/2018 | | 9/27/2018 | | PASS |
Beverly Mountain
|
|
|
Version 2 re-submittal is a new plan
|
Plan assigned to (BJM) | 8/14/2018 | 8/14/2018 | 8/21/2018 | | DEFR |
Brian McGowan
|
|
|
08/27 sfd L1 ePlan
|
Routing - PLAN CHECK | 8/21/2018 | | 8/21/2018 | | FAIL |
Rob Patrick
|
|
|
Foundation needs to meet code
|
1st review completed | | | 8/21/2018 | | FAIL |
Rob Patrick
|
|
|
Foundation needs to meet code
|
Routing - MECHANICAL | 8/14/2018 | | 8/16/2018 | | FAIL |
Troy James
|
|
|
Building plans are to be revised due to planning. Manual j report will need to reflect the changes.
|
Route to Impact Fee Review | 8/14/2018 | 8/17/2018 | 8/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 8/14/2018 | | 8/15/2018 | | FAIL |
Susan Riggs
|
|
|
House plan does not meet building setbacks. Applicant is going to resubmit a new house plan for Lot 11.
|
Routing - Addressing | 8/14/2018 | | 8/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/14/2018 | | 8/14/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 8/14/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/14/2018 | | DONE |
|
|
|
|
Application received | | | 8/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 13 2018 3:14PM
|