Permit Information
Permit NumberBLD18-02967
StatusIssued
Name CASCADE ENTERPRISES INC
Site Address 11818 W JOPLIN RD
Project NameWB Struvite Catwalk/Shaker
Customer Number 
ePlanReviewYes
Description
(BOISE CITY SEWER PLANT/JOPIN) Relocation of existing shaker in existing treatment plant. A new platform will be constructed to support shaker, in addition new catwalks will be installed in the building. This building is fully partially fire sprinklerd in the H-4 portion. This is a scope of work permit only with no change in occupancy or occupant load and a certificate of completion to be issued upon completion and approval of the project. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/21/20196/21/20196/21/2019PPASS
DetailsTell Riley
Joseph Phone #: ###-####//provided email with final third party summary report//
BLD-Final6/18/20196/20/20196/20/2019APART
DetailsTell Riley
Joe Phone #: ###-####//project complete per approved plans and engineering//pending final Summary report of special inspection.//
FIRE-Final Inspection6/18/20196/19/20196/19/2019PPASS
DetailsTroy Cobbley
Life safety passed.

Joe Phone #: ###-####
BLD-Other3/27/20193/28/20193/28/2019APART
DetailsJim Sly
catwalk // Call ahead 30 minute Joe Phone #: ###-####
# 1 catwalk.....OK pending special inspection approval.....Fire looked at it.....says OK.
FIRE-Final Inspection3/27/20193/28/20193/28/2019APART
DetailsTroy Cobbley
Struvite level 1 catwalk life safety passed. Fire extinguisher has been added.

Joe Phone #: ###-####-please call 30 minutes prior to meet
BLD-Other3/26/20193/26/20193/27/2019PNR
DetailsJim Sly
steel catwalk // Call ahead 30 minutes - Joe Phone #: ###-####
Need fire approval.
FIRE-Final Inspection3/26/20193/26/20193/26/2019PFAIL
DetailsTroy Cobbley
Was not ready for a final inspection so this was a conference. The building permit number on the plans does not match the small documents. Need tagged and mounted fire extinguishers for all levels as discussed.

please call Joe 30 mins prior, thank you Phone #: ###-####
Issue PAID IN FULL permit  11/7/2018 DONE
Inspection Record Card- Bld  11/7/2018 DONE
Permit Ready to Issue  11/5/2018 DONE
NEED
GC FORM
REVISED VALUE
Plan assigned to (CDM)8/22/20188/22/201811/4/2018 PASS
DetailsCarl D Madsen
09/17 Joplin Sewer Plant L-3
PLANS/APPL TAKEN TO FRONT DESK  11/4/2018 DONE
Routing Off Site - STRUCTURAL10/25/2018 10/25/2018 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL9/26/2018 10/12/2018 FAIL
DetailsCarl D Madsen
Route to Impact Fee Review9/26/20189/29/20189/28/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE8/22/20188/22/20189/20/2018 PASS
DetailsErika Akin
Attached comments to case
1st review completed  9/20/2018 DONE
Routing Off Site - STRUCTURAL8/22/2018 9/7/2018 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK8/22/2018 9/7/2018 PASS
DetailsCarl D Madsen
Routing - MECHANICAL8/22/2018 8/23/2018 PASS
DetailsTroy James
Process piping.
Routing - Addressing8/22/2018 8/23/2018 PASS
DetailsDoug Chausow
Print Statement  8/23/2018 DONE
Routing - PUBLIC WORKS8/22/2018 8/22/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment8/22/2018 8/22/2018 PASS
DetailsAndy J. Long
Interior work only listed in scope of work. No ESC permit required.
Intake Approval  8/21/2018 PASS
Intake Approval  8/16/2018 FAIL
DetailsJavier Guzman
Provide and upload the following:
• On the uploaded Form #310 – Statement of Special Inspections the form must be stamped, signed and dated by the Idaho design engineer
• On the uploaded Form #310 – Statement of Special Inspections the form must be signed by the design professional in charge or property owner

Application received  8/15/2018 DONE
Application submitted via PDS Online on Aug 15 2018 1:04PM