BLD-Final | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Tell Riley
|
|
|
Joseph Phone #: ###-####//provided email with final third party summary report//
|
BLD-Final | 6/18/2019 | 6/20/2019 | 6/20/2019 | A | PART |
Tell Riley
|
|
|
Joe Phone #: ###-####//project complete per approved plans and engineering//pending final Summary report of special inspection.//
|
FIRE-Final Inspection | 6/18/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Joe Phone #: ###-####
|
BLD-Other | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PART |
Jim Sly
|
|
|
catwalk // Call ahead 30 minute Joe Phone #: ###-#### # 1 catwalk.....OK pending special inspection approval.....Fire looked at it.....says OK.
|
FIRE-Final Inspection | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PART |
Troy Cobbley
|
|
|
Struvite level 1 catwalk life safety passed. Fire extinguisher has been added.
Joe Phone #: ###-####-please call 30 minutes prior to meet
|
BLD-Other | 3/26/2019 | 3/26/2019 | 3/27/2019 | P | NR |
Jim Sly
|
|
|
steel catwalk // Call ahead 30 minutes - Joe Phone #: ###-#### Need fire approval.
|
FIRE-Final Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | FAIL |
Troy Cobbley
|
|
|
Was not ready for a final inspection so this was a conference. The building permit number on the plans does not match the small documents. Need tagged and mounted fire extinguishers for all levels as discussed.
please call Joe 30 mins prior, thank you Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/7/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/5/2018 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
|
Plan assigned to (CDM) | 8/22/2018 | 8/22/2018 | 11/4/2018 | | PASS |
Carl D Madsen
|
|
|
09/17 Joplin Sewer Plant L-3
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/25/2018 | | 10/25/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 9/26/2018 | | 10/12/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 9/26/2018 | 9/29/2018 | 9/28/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 8/22/2018 | 8/22/2018 | 9/20/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 9/20/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/22/2018 | | 9/7/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/22/2018 | | 9/7/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 8/22/2018 | | 8/23/2018 | | PASS |
Troy James
|
|
|
Process piping.
|
Routing - Addressing | 8/22/2018 | | 8/23/2018 | | PASS |
Doug Chausow
|
|
|
|
Print Statement | | | 8/23/2018 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 8/22/2018 | | 8/22/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/22/2018 | | 8/22/2018 | | PASS |
Andy J. Long
|
|
|
Interior work only listed in scope of work. No ESC permit required.
|
Intake Approval | | | 8/21/2018 | | PASS |
|
|
|
|
Intake Approval | | | 8/16/2018 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• On the uploaded Form #310 – Statement of Special Inspections the form must be stamped, signed and dated by the Idaho design engineer
• On the uploaded Form #310 – Statement of Special Inspections the form must be signed by the design professional in charge or property owner
|
Application received | | | 8/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 15 2018 1:04PM
|