BLD-Final | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Jim Sly
|
|
|
Christian // Call him if something doesn''t pass Phone #: ###-####
|
DOC - Permit Finaled | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/3/2018 | 12/4/2018 | 12/4/2018 | A | FAIL |
Mike Jordan
|
|
|
Sue Phone #: ###-####. No footing inspection, Needs to review engineering and truss engineering and install all missing hardware and OSB.
|
Routing Walk-In (Zoning) | 8/24/2018 | 8/24/2018 | 8/24/2018 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 8/24/2018 | 8/24/2018 | 8/24/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/24/2018 | | 8/24/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 8/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/24/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/24/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/24/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/22/2018 | 8/22/2018 | 8/22/2018 | A | PASS |
Josh Bogle
|
|
|
no contact with applicant
|
Application received | | 8/22/2018 | | | |
|
|
|
|