Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD18-03353
StatusFinaled
Name SHILOH BUILDERS LLC
Site Address 6416 W GLENCREST LN
Project Name6416 W. Glencrest Ln.
Customer NumberDEMO BLD17-03131
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2017 sq. ft., two story (first story 737 sq. ft., second story 1280 sq. ft.) single family dwelling with 3 bedrooms, 2 bathrooms, approximately 77 sq. ft. of covered patio/porch and a 476 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/8/20193/11/20193/11/2019PPASS
DetailsTony Young
Call Dan for access Phone #: ###-#### Inspection requested via web by Daniel Appel
DOC - Permit Finaled3/11/20193/11/20193/11/2019PPASS
DetailsTony Young
c of o issued
BLD-Blower Door Test Results3/8/20193/11/20193/11/2019PPASS
DetailsTony Young
Call Dan for access Phone #: ###-#### Inspection requested via web by Daniel Appel/// 3.71
BLD-Blower Door Test Results3/8/20193/8/20193/8/2019PPEND
DetailsTony Young
Call Dan for access Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Final3/8/20193/8/20193/8/2019PPEND
DetailsTony Young
Call Dan for access Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Final3/7/20193/8/20193/8/2019APART
DetailsTony Young
Call Dan for access Phone #: ###-#### Inspection requested via web by Daniel Appel,, needs BDT, sds screws front beam,, all else ok
BLD-Energy code compliance12/14/201812/17/201812/17/2018APASS
DetailsJim Sly
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Wall cover12/14/201812/17/201812/17/2018APASS
DetailsJim Sly
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Framing/Rough-in12/12/201812/12/201812/12/2018PPASS
DetailsBrandon Shaw
OK to insulate
Plan Modification Accepted  12/7/2018 DONE
New manual j report.
Routing - MECHANICAL12/7/2018 12/7/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing11/19/201811/19/201811/19/2018PPART
DetailsTony Young
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel,, exterior ok,, will need interior also
BLD-Wall Bracing11/16/201811/19/201811/19/2018ANR
DetailsTony Young
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel,, nail per plan, I will check back in the pm
BLD-Foundation10/19/201810/22/201810/22/2018PPART
DetailsTony Young
Chris Phone #: ###-####,, work in progress,, ok
BLD-Footing10/17/201810/18/201810/18/2018PPASS
DetailsJim Sly
Chris Phone #: ###-####
Issue PAID IN FULL permit  10/17/2018 DONE
Inspection Record Card- Bld  10/17/2018 DONE
OVERRIDE  10/9/2018  
Plan assigned to (J_N)9/14/20189/14/201810/9/2018 DONE
DetailsJenny Nelson
09/27 sfd L1 ePlan. 2nd Review 10/04 bracing lengths. 1st review complete 9/26, foam spray ICC-ES report, wall bracing length, wind speed.
Routing - PLAN CHECK10/9/2018 10/9/2018 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  10/9/2018 DONE
Details
Permit Ready to Issue  10/9/2018 DONE
All requirements met
1st review completed  9/26/2018 FAIL
Details
Foam spray ICC-ES report, wall bracing length, wind speed
Routing - PLAN CHECK10/4/2018 9/26/2018 FAIL
DetailsRob Patrick
Route to Impact Fee Review9/14/20189/17/20189/17/2018 PASS
DetailsEric Bilimoria
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
Routing - MECHANICAL9/14/2018 9/17/2018 PASS
DetailsTroy James
Routing - Addressing9/14/2018 9/17/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS9/14/2018 9/14/2018 PASS
DetailsRachael Beierle
Routing - PLANNING9/14/2018 9/14/2018 PASS
DetailsBrent Moore
Plans ACCEPTED BY PLAN TECH  9/14/2018 DONE
Recd Pcfee & Taken To Pln CK  9/14/2018 DONE
Intake Approval  9/14/2018 PASS
Application received  9/13/2018 DONE
Application submitted via PDS Online on Sep 13 2018 1:53PM
Telephone call  9/13/2018 DONE
Left message for Dan to give me a call back. address does not come up on the map, spoke to Doug C and he stated it's not a valid address and not sure why it's in tidemark
Intake Approval  9/13/2018 FAIL
(ok to start review once plans corrected. Sub is recorded and correct parcel numbers and address is in Tidemark//9/13/18 leg)
The new parcel's and address's for subdivision must be in our permitting system in order to review your plans. If you have further questions please connect Brent Moore at ###-####

-Manual needs full subdivision name, lot # and block #
-Need to show all height points on elevations
-Plans need full subdivision name, lot # and block #