BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tony Young
|
|
|
Caysie Phone #: ###-####
|
DOC - Permit Finaled | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | NR |
Tony Young
|
|
|
Caysie Phone #: ###-####,, needs trades
|
BLD-Aging Inspection | 6/27/2019 | 6/27/2019 | 6/28/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Tony Young
|
|
|
Casey-wife Phone #: ###-####
|
BLD-Framing/Rough-in | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | PASS |
Tony Young
|
|
|
Casee Phone #: ###-####,, ok to insulate
|
BLD-Wall Bracing | 12/20/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Tony Young
|
|
|
shear // Jon Phone #: ###-####
|
BLD-Foundation | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Footing | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | DONE |
Tony Young
|
|
|
early as poss // Caycee Phone #: ###-####
|
BLD-Conference | 11/13/2018 | 11/13/2018 | 11/14/2018 | P | PART |
Tony Young
|
|
|
/ Caycee Phone #: ###-####,, dig out, clean out roots,, make sure 8"
|
PubWorks Subgrade Approval | 11/14/2018 | 11/14/2018 | 11/14/2018 | | DONE |
Melissa Jannusch
|
|
|
FOUNDATION. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | NR |
Tony Young
|
|
|
early as poss // Caycee Phone #: ###-####
|
OVERRIDE | | | 11/5/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 10/30/2018 | 10/30/2018 | 11/5/2018 | | PASS |
Josh Bogle
|
|
|
11/5 addition, paper
|
Routing - Erosion and Sediment | 10/30/2018 | | 11/5/2018 | | PASS |
Michael Zawacki
|
|
|
waiver approved
|
Routing - MECHANICAL | 10/30/2018 | | 11/5/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 11/5/2018 | | 11/5/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PUBLIC WORKS | 11/2/2018 | | 11/5/2018 | | PASS |
Morgan Webb
|
|
|
|
Telephone call | | | 11/5/2018 | | DONE |
|
|
|
Spoke with Jon to inform his permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 11/5/2018 | | DONE |
|
|
|
|
1st review completed | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 11/5/2018 | | DONE |
|
|
|
met
|
Routing Walk-In (BLD) | 11/2/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Josh Bogle
|
|
|
applicant keeping tabs on us
|
Application received | | 9/28/2018 | 11/2/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 10/30/2018 | | 11/2/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - Addressing | 11/2/2018 | | 11/2/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing Walk-In (BLD) | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
Josh Bogle
|
|
|
applicant checking on process
|
Routing Walk-In (BLD) | 10/30/2018 | 10/30/2018 | 10/30/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2, routed
|
Routing Walk-In (Zoning) | 10/24/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 10/24/2018 | 10/24/2018 | 10/24/2018 | A | FAIL |
Michael Hanson
|
|
|
Additonal information required. Electrical sheets, foam spray ESR report, Soils report for hillside. MDH
|
Routing - PLAN CHECK | 10/24/2018 | | 10/24/2018 | | FAIL |
Michael Hanson
|
|
|
Additonal information required. Electrical sheets, foam spray ESR report, Soils report for hillside. MDH
|
Routing Walk-In (Zoning) | 9/28/2018 | 9/28/2018 | 9/28/2018 | A | FAIL |
KayCee Babb
|
|
|
Side interior setback is 10'. Hillside review also required.
|
Routing Walk-In (BLD) | 9/28/2018 | 9/28/2018 | 9/28/2018 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/28/2018 | | 9/28/2018 | | FAIL |
Josh Bogle
|
|
|
project needs a planning variance before being accepting an application for a building permit
|
1st review completed | | | 9/28/2018 | | FAIL |
Josh Bogle
|
|
|
|