Third Notice | | 7/13/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-14-2020 with second letter
|
Second Follow up | | | 8/11/2020 | | DONE |
|
|
|
|
Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020 with first follow up
|
First Follow up | | | 7/8/2020 | | DONE |
|
|
|
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Second Notice | | 2/16/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
First Notice | | 1/31/2020 | 2/6/2020 | | DONE |
|
|
|
mailed 2-7-20
|
PubWorks Occupancy Approval | 1/22/2020 | 1/22/2020 | 1/22/2020 | | DONE |
Tiffany Lowery
|
|
|
|
PubWorks Occupancy Approval | 1/21/2020 | 1/21/2020 | 1/21/2020 | | DONE |
Brian Murphy
|
|
|
|
Permanent Occupancy | | | 1/21/2020 | | DONE |
|
|
|
|
BLD-Final | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PASS |
Tell Riley
|
|
|
Bob Phone #: ###-####//plan mod for steps at service door and railing complete//final is complete//no signature card to sign//
|
BLD-Final | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | NR |
Tell Riley
|
|
|
Bob Phone #: ###-####//need to modify hand rail to meet plan mod//discussed onsite//
|
Print Occupancy Form | | | 9/24/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/24/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/24/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 9/17/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 9/17/2019 | | DONE |
|
|
|
PLAN MOD
|
Plan assigned to (JG) | 9/9/2019 | 9/9/2019 | 9/16/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, plan mod In the Bag Promotions
|
Routing - PLAN CHECK | 9/16/2019 | | 9/16/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/14/2019 | | 9/14/2019 | | FAIL |
Javier Guzman
|
|
|
Previous correction not addressed
|
Routing - PLAN CHECK | 9/10/2019 | | 9/11/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 9/11/2019 | | 9/11/2019 | | PASS |
Katelyn Menuge
|
|
|
Plan Mod okay
|
Plan Modification Accepted | | | 9/9/2019 | | DONE |
|
|
|
plan modification per Jeff Likes. Adding railing near the will call door. Sheets SD1.1 and SD1.2
|
BLD-Final | 8/12/2019 | 8/12/2019 | 8/13/2019 | P | PEND |
Tell Riley
|
|
|
joe Phone #: ###-####//discussed ramp at exit door--too steep--plans show 1:12//
|
BLD-Final | 7/18/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Tell Riley
|
|
|
Joe Phone #: ###-####//building complete per plans//temp occupancy ok//final occupancy once parking lot is finished and signage is installed//
|
FIRE-Final Inspection | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
Joe Phone #: ###-####
|
BLD-Final | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | NR |
Tell Riley
|
|
|
Joe Phone #: ###-####//need electrical final//need fire final//new sidewalks and ADA ramp to be poured 7/19/19//
|
FIRE-Final Inspection | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PART |
Troy Cobbley
|
|
|
Hvac unit won't go into heat mode for duct detector testing. Owner agreed to lock out the unit until it is repaired and shut down could be tested. All other life safety items appear ok. Joe Phone #: ###-####
|
Print Occupancy Form | | | 7/18/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 7/9/2019 | 7/10/2019 | 7/10/2019 | A | PASS |
Tell Riley
|
|
|
Joe Phone #: ###-####//truss framing and beams installed per plans for modification//engineering was reveiwed//two electrical wires were fire caulked at the penetrations//
|
OVERRIDE | | | 7/9/2019 | | |
|
|
|
|
Plan assigned to (JG) | 6/27/2019 | 6/27/2019 | 7/9/2019 | | PASS |
Javier Guzman
|
|
|
plan mod In the Bag Promotions
|
Routing - PLAN CHECK | 7/8/2019 | | 7/9/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 7/8/2019 | | 7/9/2019 | | PASS |
Javier Guzman
|
|
|
Plan Mod - Truss Modification signed off in ePlan by KPFF Cory Harelson
|
Permit Ready to Issue | | | 7/9/2019 | | DONE |
|
|
|
plan mod-please do not re issue
|
CHANGE STATUS TO (ISS) | | | 7/9/2019 | | DONE |
|
|
|
plan mod
|
Print Occupancy Form | | | 7/9/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/9/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/9/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/9/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/9/2019 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 7/1/2019 | 7/1/2019 | 7/2/2019 | P | PASS |
Dave Hannah
|
|
|
Joe- modification reveiw has nothing to do with this inspection Phone #: ###-####
|
Plan Modification Accepted | | | 6/27/2019 | | DONE |
|
|
|
plan mod for truss modification submitted by Jeff Likes
|
BLD-Framing/Rough-in | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### stop work/ submitals to get aproved by planreview not done/ need ul listings for wall assemley trusses bearing in wall . prevously noted with c/n an not responded to.
|
BLD-Ceiling Grid Inspection | 6/25/2019 | 6/25/2019 | 6/26/2019 | P | NR |
Dave Hannah
|
|
|
joe Phone #: ###-####
|
BLD-Framing/Rough-in | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | PART |
Dave Hannah
|
|
|
Joe Phone #: ###-#### blocking in wall at trusses ok to cover with sheet rock
|
BLD-Energy code compliance | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Ceiling insulation...
|
BLD-Other | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Dave Hannah
|
|
|
Joe- drywall nai off inspection Phone #: ###-####
|
BLD-Wall cover | 6/10/2019 | 6/10/2019 | 6/11/2019 | P | PART |
Dave Hannah
|
|
|
Joe Phone #: ###-#### picl up butt seams 8 oc/ plm pipe repairs to gyp and fire stop / and truss removal or fire rating pending. ok to cover int walls
|
BLD-Wall cover | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### defered to pm
|
BLD-Wall cover | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Jim Storey
|
|
|
vapor barrier exterior // Joe Phone #: ###-####/ pending architect submittal for wall protection
|
BLD-Energy code compliance | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PART |
Jim Storey
|
|
|
Joe- Phone #: ###-#### wall insulation ok/ need vappor barrior/ pending p/l fire wall aplacation at trusses.
|
BLD-Other | 5/16/2019 | 5/17/2019 | 5/20/2019 | A | PART |
Dave Hannah
|
|
|
fire wall // Joe Phone #: ###-#### sheet rock behind ledger ok
|
BLD-Wall Bracing | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### over driven renail
|
BLD-Framing/Rough-in | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | FAIL |
Jim Storey
|
|
|
Joe Phone #: ###-#### c/n 602 1 hr from bothsides provide engineering to resolve to planreview.
|
BLD-Other | 4/2/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Dave Hannah
|
|
|
pre slab // Joe Phone #: ###-####
|
BLD-Footing | 3/18/2019 | 3/19/2019 | 3/19/2019 | P | PASS |
Dave Hannah
|
|
|
pour time 3pm-Joe Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/22/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/22/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/20/2019 | | |
|
|
|
|
Plan assigned to (JG) | 10/12/2018 | 10/12/2018 | 2/20/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 11/06 In The Bag Promotions Addition ePlan,
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/20/2019 | | DONE |
|
|
|
MET ashleyhaneborg@esi-express.com
Need
GC
Rev cert of val
RP
|
Routing - PLAN CHECK | 2/13/2019 | | 2/20/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Sewer Design | 2/13/2019 | | 2/19/2019 | | PASS |
DeAnn Brown
|
|
|
If for any reason the building addition cannot be plumbed into the existing sewer service line, Contact City of Boise Public Works for a tap permit to tap existing sewer main.
|
Routing - Design Review | 2/13/2019 | | 2/13/2019 | | PASS |
Katelyn Menuge
|
|
|
Okay-taller parapet at exterior east wall
|
Routing - FIRE | 2/5/2019 | 2/5/2019 | 2/11/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 2/5/2019 | | 2/6/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Drainage | 2/5/2019 | | 2/6/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 2/5/2019 | | 2/5/2019 | | FAIL |
DeAnn Brown
|
|
|
Building addition plumbing plans show a sewer service exiting building on north side, but there are no submitted plans showing how the sewer service connects to the existing service line or directly to the sewer main in the roadway. Please include plans with this information.
|
Routing - Design Review | 2/5/2019 | | 2/5/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PUBLIC WORKS | 2/5/2019 | | 2/5/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - FIRE | 1/8/2019 | 1/8/2019 | 1/23/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - PLUMBING | 1/17/2019 | | 1/22/2019 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Routing - PLAN CHECK | 1/8/2019 | | 1/18/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 1/8/2019 | | 1/17/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by KPFF Cory Harelson
|
Routing PW Drainage | 1/8/2019 | | 1/16/2019 | | FAIL |
|
|
|
|
Routing PW Sewer Design | 1/8/2019 | | 1/14/2019 | | FAIL |
DeAnn Brown
|
|
|
Building addition plumbing plans show a sewer service exiting building on north side, but there are no submitted plans showing how the sewer service connects to the existing service line or directly to the sewer main in the roadway. Please include.
|
Routing - Design Review | 1/8/2019 | | 1/10/2019 | | FAIL |
Katelyn Menuge
|
|
|
Please update C1.0 to match changes made on SD1.1
|
Routing - PUBLIC WORKS | 1/8/2019 | | 1/9/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 1/8/2019 | | 1/9/2019 | | PASS |
Michael Zawacki
|
|
|
Certified RP needed before construction activity begins.
|
Route to Impact Fee Review | 11/21/2018 | 11/24/2018 | 11/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 10/12/2018 | 10/12/2018 | 11/21/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
1st review completed | | | 11/21/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/12/2018 | | 11/7/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 10/12/2018 | | 11/5/2018 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by KPFF Cory Harelson
|
Routing PW Environmental | 10/12/2018 | | 10/23/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Drainage | 10/12/2018 | | 10/22/2018 | | FAIL |
|
|
|
o of m appdx j system size, drainage report
|
Routing - MECHANICAL | 10/12/2018 | | 10/16/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 10/12/2018 | | 10/15/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 10/12/2018 | | 10/15/2018 | | FAIL |
Katelyn Menuge
|
|
|
DRH18-00158 - See changemarks
|
Routing PW Sewer Design | 10/12/2018 | | 10/15/2018 | | FAIL |
DeAnn Brown
|
|
|
Submit site utility plan that shows connection to existing sewer system.
|
Routing PW Solid Waste | 10/12/2018 | | 10/15/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - Erosion and Sediment | 10/12/2018 | | 10/15/2018 | | FAIL |
Michael Zawacki
|
|
|
No ESC narrative or BMP maps provided. Construction activity includes excavation and foundation and changing access and sidewalks.
|
Routing PW Street Lights | 10/12/2018 | | 10/12/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLANNING | 10/12/2018 | | 10/12/2018 | | PASS |
Nicolette Womack
|
|
|
CUP18-00051
|
Routing - Addressing | 10/12/2018 | | 10/12/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2018 | | 10/12/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/10/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/10/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/10/2018 | | FAIL |
Julie Romig
|
|
|
1) Electrical, Plumbing, and Mechanical values on Certificate of Value Page 5 of permit application.
2) Verification of Legal Lot or Parcel form with signed by subdivision planner.
3) Sheet M0.1 is too large to open. Reduce file size to less than and re-upload.
|
Intake Approval | | | 10/10/2018 | | PASS |
|
|
|
|
Application received | | | 10/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 4 2018 11:40AM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|