Permit Information
Permit NumberBLD18-03768
StatusFinaled
Name ABBETH LLC
Site Address 1857 E RIDGECREST DR
Project NameAbbeth flip
Customer Number 
ePlanReviewNo
Description
HILLSIDE - WUI - 2/19/19 MODIFICATION CONVERTS THIS TO A FULL BUILDING PERMIT - PERMIT FOR A REMODEL AND CONSTRUCTION OF A NEW DECK. PROJECT INVOLVES THE FOUNDATION REPAIR NOTED IN THE EARLY START PERMIT, ADDING BASEMENT EGRESS WINDOWS, RELOCATING A STAIRWAY, RECONFIGURING THE MASTER BATH, RELOCATING THE POWDER BATH, RECONFIGURING THE KITCHEN, NEW SURFACES THROUGHOUT, NEW WINDOWS,SIDING & ROOFING. AND REPAIRNG TRUSS DAMAGE FROM PREVIOUS HOUSE SETTLING. ALL WORK PER PLANS, NOTATIONS, ATTACHMENTS, ENGINEERING, LOCAL CODES & ORDINANCES. SEPARATE ELECTRICAL, PLUMBING, AND MECHANICAL PERMITS REQUIRED. 2/19/19 **jab** This early start permit is being issued to allow applicant to begin prep and foundation work to address unsafe on-site conditions. Permit for the foundation work only. No framing allowed. Builder is beginning "At Own Risk". Any construction not in compliance with the code are the owner’s responsibility and shall be corrected at the owner's expense. Foundation work is based on the provided plans, engineering and geotechnical report. A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions. **JAB**The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/16/20199/17/20199/17/2019APASS
DetailsBrandon Shaw
Melissa Janusch is meeting me at 10:00 to review the engineering, we should be ready for the building final anytime after 10:00. Phone #: ###-#### Inspection requested via web by Daniel Dow
DOC - Permit Finaled9/17/20199/17/20199/17/2019PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval9/17/20199/17/20199/17/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Final9/5/20199/6/20199/6/2019ANR
DetailsBrandon Shaw
Need PW approval...
BLD-Final9/3/20199/3/20199/4/2019AFAIL
DetailsBrandon Shaw
No access...
No city approved plans or permit on site...
No address posted...
BLD-Final8/31/20199/3/20199/3/2019AFAIL
DetailsBrandon Shaw
No access...
No city approved plans or permit on site...
No address posted...
BLD-Concrete4/12/20194/12/20194/12/2019PPASS
DetailsDave Hannah
rebar // Richard Phone #: ###-#### ftgs for deck
PubWorks Subgrade Approval4/12/20194/12/20194/12/2019 DONE
DetailsMelissa Jannusch

*DECK FOOTINGS* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Foundation4/9/20194/10/20194/10/2019PNR
DetailsDave Hannah
Richard- Rebar inspection Phone #: ###-####
BLD-Framing/Rough-in4/1/20194/1/20194/1/2019PPASS
DetailsDave Hannah
Richard Phone #: ###-####
BLD-Framing/Rough-in3/28/20193/29/20193/29/2019APASS
DetailsDave Hannah
Richard Phone #: ###-#### ok to cover up stairs ok to insulate basement needs to fix floor joist cut by plumber
OVERRIDE  2/19/2019  
Plan assigned to (JAB) Josh12/31/201812/31/20182/19/2019 PASS
DetailsJosh Bogle
1/1/19 modification
Telephone call  2/19/2019 DONE
Spoke with Dan informing him this plan mod is ready and the fee amount due
CHANGE STATUS TO (ISS)  2/19/2019 DONE
plan mod
(F) Reprint permit  2/19/2019 DONE
Routing - PLAN CHECK2/19/2019 2/19/2019 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  2/19/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  2/19/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  2/19/2019 DONE
DetailsJosh Bogle
Override - Parcel Holds  2/19/2019  
Permit Ready to Issue  2/19/2019 DONE
PLAN MOD
Routing PW Grading-Hillside2/5/2019 2/5/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Plan Modification Accepted  1/31/2019 DONE
Two copies of additional plans sheets 1-7 and three copies of stair calculation & elevation of deck. taken to Josh
Plan Modification Accepted  1/29/2019 DONE
3 copies each of Sheet 1 and 2. 3 copies of Foundation repair grading & drainage document.
BLD-Footing1/14/20191/15/20191/16/2019APASS
DetailsDave Hannah
Chris Phone #: ###-#### this was a foundation inspection
Routing - PLAN CHECK1/14/2019 1/14/2019 FAIL
DetailsJosh Bogle
talked with Chris about the missing information
Routing PW Grading-Hillside1/14/2019 1/14/2019 FAIL
DetailsMelissa Jannusch
Revisions requested to the grading and drainge plan.
BLD-Footing1/9/20191/10/20191/10/2019APASS
DetailsDave Hannah
Ross-Melissa J ok''d hold to be removed-please call her for questions Phone #: ###-####
BLD-Footing1/7/20191/8/20191/9/2019ANR
DetailsDave Hannah
pouring at 1pm- Rick Phone #: ###-#### needs geo tech
BLD-Foundation1/7/20191/8/20191/9/2019ANR
DetailsDave Hannah
Ross Phone #: ###-#### needs geo tech
PubWorks Subgrade Approval1/9/20191/9/20191/9/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Plan resubmittals received  1/9/2019 DONE
resubmittals received-3 sets of the Geotech engineering report-called building plan reviewer to let know i was taking to Melissa J
Routing Walk-In (BLD)12/26/201812/26/201812/26/2018PPASS
DetailsJosh Bogle
accepted new floor plans and grading & drainage plan resubmittals to be routed for converting this to a full permit - JAB
BLD-Foundation12/20/201812/21/201812/21/2018APART
DetailsBrandon Shaw
South foundation wall...
Frost protection is required...
BLD-Footing12/17/201812/18/201812/18/2018APASS
DetailsDave Hannah
Rick Phone #: ###-#### ftgs for south wall
BLD-Footing12/14/201812/17/201812/17/2018ACANC
DetailsDave Hannah
Rick Phone #: ###-####
OVERRIDE  11/26/2018  
Routing Walk-In (BLD)11/26/201811/26/201811/26/2018PDONE
DetailsJason C. Taylor
Routing Walk-In (PW Hillside)11/26/201811/26/201811/26/2018PPASS
DetailsJason C. Taylor
**FOUNDATION ONLY**. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Plan assigned to (JAB) Josh10/12/201810/12/201811/26/2018 PASS
DetailsJosh Bogle
10/18 remodel, paper - 1st done
PLANS/APPL TAKEN TO FRONT DESK  11/26/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  11/26/2018 DONE
Plan resubmittals received  11/26/2018 DONE
stamped and taken to Josh
Routing - PLAN CHECK11/26/2018 11/26/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  11/26/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  11/26/2018 DONE
DetailsJosh Bogle
Issue PAID IN FULL permit  11/26/2018 DONE
Routing Walk-In (BLD)11/20/201811/20/201811/20/2018PFAIL
DetailsJosh Bogle
discussed a potential Foundation Only permit
1st review completed  10/23/2018 FAIL
DetailsJosh Bogle
failed Hillside
Routing PW Grading-Hillside10/23/2018 10/23/2018 FAIL
DetailsMelissa Jannusch
Geotechnical revisions and structrual revisions required.
Routing - Erosion and Sediment10/12/2018 10/18/2018 PASS
DetailsAndy J. Long
ESC plan waiver approved. Need to designate certified ESC Responsible Person(RP) or applicant may be homeowner RP.
Routing PW Grading-Hillside10/12/2018 10/17/2018 FAIL
DetailsMelissa Jannusch
Will require geotechnical engineering report to be provided
Routing Walk-In (BLD)10/12/201810/12/201810/12/2018PPASS
DetailsJosh Bogle
Routing - PLAN CHECK10/12/2018 10/12/2018 FAIL
DetailsJosh Bogle
Application received 10/12/2018   
Routing - PUBLIC WORKS10/17/2018   FAIL
SEE HILLSIDE FOR FAIL
Routing - PUBLIC WORKS10/23/2018   FAIL
SEE HILLSIDE FOR FAIL
Routing PW Grading-Hillside12/31/2018    
DetailsMelissa Jannusch