BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
Brandon Shaw
|
|
|
Melissa Janusch is meeting me at 10:00 to review the engineering, we should be ready for the building final anytime after 10:00. Phone #: ###-#### Inspection requested via web by Daniel Dow
|
DOC - Permit Finaled | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 9/17/2019 | 9/17/2019 | 9/17/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | NR |
Brandon Shaw
|
|
|
Need PW approval...
|
BLD-Final | 9/3/2019 | 9/3/2019 | 9/4/2019 | A | FAIL |
Brandon Shaw
|
|
|
No access... No city approved plans or permit on site... No address posted...
|
BLD-Final | 8/31/2019 | 9/3/2019 | 9/3/2019 | A | FAIL |
Brandon Shaw
|
|
|
No access... No city approved plans or permit on site... No address posted...
|
BLD-Concrete | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Dave Hannah
|
|
|
rebar // Richard Phone #: ###-#### ftgs for deck
|
PubWorks Subgrade Approval | 4/12/2019 | 4/12/2019 | 4/12/2019 | | DONE |
Melissa Jannusch
|
|
|
*DECK FOOTINGS* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 4/9/2019 | 4/10/2019 | 4/10/2019 | P | NR |
Dave Hannah
|
|
|
Richard- Rebar inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Dave Hannah
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Dave Hannah
|
|
|
Richard Phone #: ###-#### ok to cover up stairs ok to insulate basement needs to fix floor joist cut by plumber
|
OVERRIDE | | | 2/19/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 12/31/2018 | 12/31/2018 | 2/19/2019 | | PASS |
Josh Bogle
|
|
|
1/1/19 modification
|
Telephone call | | | 2/19/2019 | | DONE |
|
|
|
Spoke with Dan informing him this plan mod is ready and the fee amount due
|
CHANGE STATUS TO (ISS) | | | 2/19/2019 | | DONE |
|
|
|
plan mod
|
(F) Reprint permit | | | 2/19/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/19/2019 | | 2/19/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/19/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/19/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2019 | | DONE |
Josh Bogle
|
|
|
|
Override - Parcel Holds | | | 2/19/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 2/19/2019 | | DONE |
|
|
|
PLAN MOD
|
Routing PW Grading-Hillside | 2/5/2019 | | 2/5/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Plan Modification Accepted | | | 1/31/2019 | | DONE |
|
|
|
Two copies of additional plans sheets 1-7 and three copies of stair calculation & elevation of deck. taken to Josh
|
Plan Modification Accepted | | | 1/29/2019 | | DONE |
|
|
|
3 copies each of Sheet 1 and 2. 3 copies of Foundation repair grading & drainage document.
|
BLD-Footing | 1/14/2019 | 1/15/2019 | 1/16/2019 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-#### this was a foundation inspection
|
Routing - PLAN CHECK | 1/14/2019 | | 1/14/2019 | | FAIL |
Josh Bogle
|
|
|
talked with Chris about the missing information
|
Routing PW Grading-Hillside | 1/14/2019 | | 1/14/2019 | | FAIL |
Melissa Jannusch
|
|
|
Revisions requested to the grading and drainge plan.
|
BLD-Footing | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PASS |
Dave Hannah
|
|
|
Ross-Melissa J ok''d hold to be removed-please call her for questions Phone #: ###-####
|
BLD-Footing | 1/7/2019 | 1/8/2019 | 1/9/2019 | A | NR |
Dave Hannah
|
|
|
pouring at 1pm- Rick Phone #: ###-#### needs geo tech
|
BLD-Foundation | 1/7/2019 | 1/8/2019 | 1/9/2019 | A | NR |
Dave Hannah
|
|
|
Ross Phone #: ###-#### needs geo tech
|
PubWorks Subgrade Approval | 1/9/2019 | 1/9/2019 | 1/9/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Plan resubmittals received | | | 1/9/2019 | | DONE |
|
|
|
resubmittals received-3 sets of the Geotech engineering report-called building plan reviewer to let know i was taking to Melissa J
|
Routing Walk-In (BLD) | 12/26/2018 | 12/26/2018 | 12/26/2018 | P | PASS |
Josh Bogle
|
|
|
accepted new floor plans and grading & drainage plan resubmittals to be routed for converting this to a full permit - JAB
|
BLD-Foundation | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PART |
Brandon Shaw
|
|
|
South foundation wall... Frost protection is required...
|
BLD-Footing | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Dave Hannah
|
|
|
Rick Phone #: ###-#### ftgs for south wall
|
BLD-Footing | 12/14/2018 | 12/17/2018 | 12/17/2018 | A | CANC |
Dave Hannah
|
|
|
Rick Phone #: ###-####
|
OVERRIDE | | | 11/26/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | DONE |
Jason C. Taylor
|
|
|
|
Routing Walk-In (PW Hillside) | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | PASS |
Jason C. Taylor
|
|
|
**FOUNDATION ONLY**. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
Plan assigned to (JAB) Josh | 10/12/2018 | 10/12/2018 | 11/26/2018 | | PASS |
Josh Bogle
|
|
|
10/18 remodel, paper - 1st done
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 11/26/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/26/2018 | | DONE |
|
|
|
stamped and taken to Josh
|
Routing - PLAN CHECK | 11/26/2018 | | 11/26/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/26/2018 | | DONE |
Josh Bogle
|
|
|
|
Issue PAID IN FULL permit | | | 11/26/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/20/2018 | 11/20/2018 | 11/20/2018 | P | FAIL |
Josh Bogle
|
|
|
discussed a potential Foundation Only permit
|
1st review completed | | | 10/23/2018 | | FAIL |
Josh Bogle
|
|
|
failed Hillside
|
Routing PW Grading-Hillside | 10/23/2018 | | 10/23/2018 | | FAIL |
Melissa Jannusch
|
|
|
Geotechnical revisions and structrual revisions required.
|
Routing - Erosion and Sediment | 10/12/2018 | | 10/18/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Need to designate certified ESC Responsible Person(RP) or applicant may be homeowner RP.
|
Routing PW Grading-Hillside | 10/12/2018 | | 10/17/2018 | | FAIL |
Melissa Jannusch
|
|
|
Will require geotechnical engineering report to be provided
|
Routing Walk-In (BLD) | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/12/2018 | | 10/12/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 10/12/2018 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/17/2018 | | | | FAIL |
|
|
|
SEE HILLSIDE FOR FAIL
|
Routing - PUBLIC WORKS | 10/23/2018 | | | | FAIL |
|
|
|
SEE HILLSIDE FOR FAIL
|
Routing PW Grading-Hillside | 12/31/2018 | | | | |
Melissa Jannusch
|
|
|
|