Information based on query as of Monday, June 17, 2024.
Permit Information
Permit NumberBLD18-04118
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameC33207 Micron B24D and B24E
Customer Number 
ePlanReviewYes
Description
(MICRON B24D and B24E) (C33207) Permit to infill an existing opening that currently has a roll up fire door in the 4-hr rated Fire Wall between buildings 24D and 24E with a 2-hour fire resistance rated Fire Barrier to enclose a Rorze Sorter. Work to include: removal of the existing roll up fire door and the construction of the 2-hour rated enclosure in Fabrication Link 158B for the relocation of the Rorze Sorter and install additional fire sprinkler heads. Refer to the Code Alternate approved by the building official and fire marshal for additional information.This building is fire sprinklered for area increase with an approved fire alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/22/201910/22/201910/22/2019APASS
DetailsJim Storey
call ahead 1/2 hour and meet in B26 lobby. thanks Phone #: ###-#### Inspection requested via web by Daniel Cook
DOC - Permit Finaled10/22/201910/22/201910/22/2019PPASS
DetailsJim Storey
FIRE-Final Inspection10/18/201910/21/201910/21/2019APASS
DetailsTroy Cobbley
Life safety passed.

DAN- CALL 30 PRIOR MEET@ BUILD 26 LOBBY Phone #: ###-####
Fees Due Hold6/22/2019 10/18/2019 DONE
DetailsJudith Amador
BLD-Framing/Rough-in6/21/20196/24/20196/24/2019PPASS
DetailsJim Storey
Drywall laps and screw schedules to verify compliance with w/UL Data Sheets Phone #: ###-#### Inspection requested via web by Paul Marcolina framing ok gyp listings being followed with stager and screw sch.// ok to finsh.
Issue & PRINT to be Invoiced  6/21/2019 DONE
Plan assigned to (JAR)12/10/201812/10/20186/17/2019 DONE
DetailsJulie Romig
06/17 - 3rd Rev - 1st Rev Comp - L3 Micron B24E - Reduce Fire Wall to Fire Barrier for RORZE Sorter.
Routing - PLAN CHECK6/4/2019 6/17/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  6/17/2019 DONE
Permit Ready to Issue  6/17/2019 DONE
NEED
GC FORM
REVISED VALUE (IF MICRON IS NOT GC)
Routing - FIRE3/25/20193/25/20194/5/2019 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK3/25/2019 4/5/2019 FAIL
DetailsJulie Romig
Contacted Paul Marcolina at Micron to let him know that the combined building area of 24D/24E is over the allowable building area and that the fire wall cannot be reduced to a fire barrier as shown.
Route to Impact Fee Review1/3/20191/6/20191/4/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE12/10/201812/10/20181/3/2019 FAIL
DetailsErika Akin
Fire requires building area to be determined before review.
1st review completed  1/3/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK12/10/2018 1/3/2019 FAIL
DetailsJulie Romig
Intake Approval  12/7/2018 PASS
Intake Approval  11/13/2018 FAIL
DetailsJulie Romig
Need architect stamp/signature on drawings.
Application received  11/12/2018 DONE
Application submitted via PDS Online on Nov 12 2018 1:39PM