BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | DEFR |
Jim Storey
|
|
|
Mike Phone #: ###-#### pm pending mech
|
BLD-Framing/Rough-in | 4/5/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### trades/ beam basement /fire blk
|
Routing - MECHANICAL | 3/13/2019 | | 3/13/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
Routing - MECHANICAL | 2/22/2019 | | 2/22/2019 | | PASS |
Troy James
|
|
|
Revised manual j report
|
BLD-Footing | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Mike Phone #: ###-####
|
Plan assigned to (RDP) | 1/25/2019 | 1/25/2019 | 1/25/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing Walk-In (BLD) | 1/25/2019 | 1/25/2019 | 1/25/2019 | A | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 1/25/2019 | | 1/25/2019 | | PASS |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 1/25/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 1/25/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/25/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/25/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 1/22/2019 | 1/22/2019 | 1/22/2019 | A | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 1/22/2019 | | 1/22/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/22/2019 | | 1/22/2019 | | FAIL |
Brian McGowan
|
|
|
Need header sizes and footing sizes as well as the manual J.
|
Routing Walk-In (Zoning) | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/17/2019 | | 1/17/2019 | | FAIL |
Josh Bogle
|
|
|
lacked some needed details & ACCA report
|
1st review completed | | | 1/17/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 1/17/2019 | | | |
|
|
|
|