Second Notice | | 4/18/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
First Notice | | 4/7/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
Permanent Occupancy | | | 3/28/2019 | | DONE |
|
|
|
|
BLD-Final | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PASS |
Tony Young
|
|
|
Antonio Phone #: ###-####
|
FIRE-Final Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Antonio Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/13/2019 | | DONE |
|
|
|
plan mod
|
Plan Reviewer's activity | | | 3/7/2019 | | DONE |
|
|
|
Drawings taken to Records
|
OVERRIDE | | | 3/4/2019 | | |
|
|
|
|
Plan assigned to (CJW) | 2/27/2019 | 2/27/2019 | 3/4/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod - tri town bicycle
|
Print Occupancy Form | | | 3/4/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/27/2019 | | 3/4/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod reviewed and approved.
|
Plan Reviewer's activity | | | 3/4/2019 | | PASS |
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 3/4/2019 | | DONE |
|
|
|
Met
plan mod please do not re issue
need cert of val for the plan mod
|
Temporary Occupancy | 3/1/2019 | 5/30/2019 | 3/1/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
|
CHANGE STATUS TO (REV) | | | 3/1/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 2/27/2019 | 3/2/2019 | 2/28/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
BLD-Final | 2/26/2019 | 2/27/2019 | 2/27/2019 | A | PART |
Tony Young
|
|
|
Mike-Phone #: ###-####,, ok pending change for records deleting interior walls
|
Plan Modification Accepted | | | 2/27/2019 | | DONE |
|
|
|
Remove two Existing walls from first floor plan. Plans stamped and taken to CJW
|
BLD-Final | 2/25/2019 | 2/26/2019 | 2/26/2019 | P | PART |
Tony Young
|
|
|
Mike-please verify sub permits were not needed Phone #: ###-####,, wrote N/A on card where trades were not needed,, needing a deletion of interior walls for records,, also the owner will put in a drinking fountain
|
BLD-Final | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PART |
Tony Young
|
|
|
Mike-please verify sub permits were not needed Phone #: ###-####,, temp occ ok
|
FIRE-Final Inspection | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are placed with current inspection tags. Final life fire safetyy inspection for area of work complete.
Mike Phone #: ###-####
|
BLD-Conference | 2/22/2019 | 2/25/2019 | 2/25/2019 | P | PART |
Tony Young
|
|
|
call 10 mins- Mike Phone #: ###-####,, ?s on final for c of o ,, need f/l/s,, others may not be needed
|
Telephone call | | | 2/25/2019 | | DONE |
|
|
|
talked to Mike-he said no Ele, Plm or Mech was done for this TI.
talked to inspector Tony Y-he will verify and sign off in the field if no work was done.
|
Print Occupancy Form | | | 2/22/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/22/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/22/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/29/2019 | 1/29/2019 | 2/19/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 02/12/19 (L3 - 15 days) (PAPER - 6 sheets) Tri Town Bicycle (L-3) (routed to planning)
|
1st review completed | | | 2/19/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/19/2019 | | DONE |
|
|
|
NEED- all met
GC
Rev cert of val
MET
ACHD
|
Print Occupancy Form | | | 2/19/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/19/2019 | | DONE |
|
|
|
Spoke with Larry informing him we need Letter from ACHD and the 302 & 306 forms filled out by the GC so we can primary them and add in the rest of the fees
|
Routing - FIRE | 1/29/2019 | 1/29/2019 | 2/15/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Fire Final review 02.15.2019.pdf
|
Routing - PLANNING | 2/14/2019 | | 2/15/2019 | | PASS |
KayCee Babb
|
|
|
No exterior alterations are proposed or approved. Exterior windows may be replaced like-for-like if material and style remain the same (excluding vinyl windows, which are not approved).
|
Routing - PLAN CHECK | 2/6/2019 | | 2/14/2019 | | PASS |
Carl Westfall
|
|
|
1st IBC plan review approved
|
Routing - MECHANICAL | 2/4/2019 | | 2/6/2019 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 1/31/2019 | | 2/4/2019 | | PASS |
Michael Zawacki
|
|
|
TI on new building, no external disturbances, no ESC permit required.
|
Routing - PUBLIC WORKS | 1/30/2019 | | 1/31/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 1/29/2019 | | 1/30/2019 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 1/23/2019 | | PASS |
|
|
|
|
Application received | | 1/23/2019 | | | |
|
|
|
|