BLD-Final | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | DONE |
Tony Young
|
|
|
monica Phone #: ###-####
|
DOC - Permit Finaled | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | PASS |
Brandon Shaw
|
|
|
Monica Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | PASS |
Tony Young
|
|
|
Monica Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | FAIL |
Tony Young
|
|
|
Monica Phone #: ###-####,, correction posted,, needs.. truss engineering, strap beam to plate, point load studs under girder, toenails, fasten girder per engineering..
|
BLD-Wall Bracing | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Tony Young
|
|
|
Monica Phone #: ###-####
|
BLD-Wall Bracing | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | PART |
Tony Young
|
|
|
Monica Phone #: ###-####,, re-nail per plan prior to cover
|
BLD-Conference | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PEND |
Tony Young
|
|
|
Monica Phone #: ###-####,,, needs to involve the engineer
|
BLD-Foundation | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Jim Storey
|
|
|
wall // willy Phone #: ###-####
|
BLD-Footing | 3/14/2019 | 3/14/2019 | 3/15/2019 | P | PASS |
Tony Young
|
|
|
willie Phone #: ###-####
|
BLD-Footing | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | NR |
Tony Young
|
|
|
willie Phone #: ###-####,, needs soils approval 1st
|
Issue PAID IN FULL permit | | | 2/5/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/4/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 1/29/2019 | 1/29/2019 | 2/4/2019 | | PASS |
Josh Bogle
|
|
|
2/4 addition, paper - waiting on ESC waiver letter
|
Routing - PLAN CHECK | | | 2/4/2019 | | PASS |
Josh Bogle
|
|
|
review passed but needs routed to ESC, waiting on waiver letter from applicant
|
Routing - Erosion and Sediment | 2/4/2019 | | 2/4/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver approved, please provide concrete washout at site when needed.
|
1st review completed | | | 2/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/4/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/4/2019 | | DONE |
|
|
|
|
Routing - PLANNING | | | 2/1/2019 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/29/2019 | | 2/1/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing PW Grading-Hillside | 1/30/2019 | | 2/1/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - Addressing | 1/30/2019 | | 1/30/2019 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/29/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/29/2019 | | PASS |
|
|
|
Melissa was in meeting so customer just wanted to drop plans off and let go through review (blh 1-29-19)
|
Recd Pcfee & Taken To Pln CK | | | 1/29/2019 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 3/14/2019 | 3/14/2019 | | | DONE |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Application received | | 1/29/2019 | | | |
|
|
|
|