BLD-Final | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Brandon Shaw
|
|
|
James Phone #: ###-####
|
DOC - Permit Finaled | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.83
|
PubWorks Occupancy Approval | 11/13/2019 | 11/13/2019 | 11/13/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond has been post for the site final stabilization.Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need PW grading approval...
|
BLD-Final | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | NR |
Brandon Shaw
|
|
|
Pre final walk thru...
|
BLD-Energy code compliance | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PEND |
Brandon Shaw
|
|
|
4 additional lights being added to stairs, need ELE rough-in cover approval. Per Engineering- DF #1 to be used for bearing end of cut trusses...
|
BLD-Framing/Rough-in | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PEND |
Brandon Shaw
|
|
|
Provide Engineering approval/ revised fix for floor trusses, F6, F7, F19. Bearing end has been cut and/or modified...
|
BLD-Framing/Rough-in | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Brandon Shaw
|
|
|
James Phone #: ###-####
|
DOC - Permit Finaled | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/23/2019 | | DONE |
|
|
|
Brandon S. inpector doc final accidently- put back in ISS status
|
BLD-Wall Bracing | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | CANC |
Brandon Shaw
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Jim Storey
|
|
|
Call ahead // James Phone #: ###-#### ok to remove tub fur out walls.
|
BLD-Wall Bracing | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
BLD-Wall Bracing | 6/11/2019 | 6/11/2019 | 6/12/2019 | P | NR |
Dave Hannah
|
|
|
James Phone #: ###-#### no plans on site
|
BLD-Foundation | 4/24/2019 | 4/24/2019 | 4/25/2019 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Dave Hannah
|
|
|
Alvalo Phone #: ###-####
|
PubWorks Subgrade Approval | 4/12/2019 | 4/12/2019 | 4/12/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
CHANGE STATUS TO (ISS) | | | 4/12/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/18/2019 | | |
|
|
|
|
Routing - FIRE | 3/15/2019 | 3/15/2019 | 3/18/2019 | | PASS |
Lee G Meredith
|
|
|
03/22 2184 E Parkside Hillside 404
Applicant's plan mod included a SUEZ provided fire flow statement that was adequate. Sprinklers are no longer required.
|
Routing - Erosion and Sediment | 3/15/2019 | | 3/18/2019 | | PASS |
Michael Zawacki
|
|
|
|
Permit Ready to Issue | | | 3/18/2019 | | DONE |
|
|
|
PLAN MOD
|
Plan assigned to (J_N) | 3/13/2019 | | 3/18/2019 | | DONE |
Jenny Nelson
|
|
|
Plan Mod - no longer installing sprinklers fire flow adequate
|
Routing - PLAN CHECK | 3/15/2019 | | 3/18/2019 | | PASS |
Jenny Nelson
|
|
|
1 hour plan mod fee
|
Routing - PLANNING | 3/15/2019 | | 3/18/2019 | | PASS |
Karla Nelson
|
|
|
Driveway is not to exceed 33' in the front setback.
|
Plan Modification Accepted | | | 3/13/2019 | | DONE |
|
|
|
Spoke with Arrow, the applicant. She informed me she needs to upload a new site plan and fire flow letter. Started new work flow i eplan
|
Issue PAID IN FULL permit | | | 3/5/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/5/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/4/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 2/19/2019 | 2/19/2019 | 3/4/2019 | | DONE |
Jenny Nelson
|
|
|
03/08 sfd L2 ePlan. 1st complete 2/21, waiting for esc and mech reviews. Needs full special inspections form uploaded.
|
Routing - PLANNING | 3/4/2019 | | 3/4/2019 | | PASS |
Karla Nelson
|
|
|
Revised plans ok
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 3/4/2019 | | DONE |
|
|
|
need RP-the one on file is expired-Met
|
Telephone call | | | 3/4/2019 | | |
|
|
|
Email sent to arrow@berlum.com requesting a current license for the ESC responsible person before issuing BLDpermit
|
Routing - FIRE | 2/19/2019 | 2/19/2019 | 3/1/2019 | | PASS |
Lee G Meredith
|
|
|
Inadequate fire flow for size of residence. Emailed a copy of the review comments to Arrow Tallman.
3-1-19 Resubmittal passed. Contractor is going to supply an NFPA 13D sprinkler system.
3-18-19 Plan mod. New fire flow report from SUEZ provided. Sprinklers are not required.
|
1st review completed | | | 3/1/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 3/1/2019 | | 3/1/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 2/19/2019 | | 3/1/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Erosion and Sediment | 2/19/2019 | | 2/25/2019 | | PASS |
Michael Zawacki
|
|
|
Hillside lot, site prep inspection required.
|
Routing - PLAN CHECK | 2/19/2019 | | 2/22/2019 | | FAIL |
Jenny Nelson
|
|
|
Need special inspections form
|
Routing PW Grading-Hillside | 2/19/2019 | | 2/21/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Route to Impact Fee Review | 2/19/2019 | 2/22/2019 | 2/20/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 2/19/2019 | | 2/19/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/19/2019 | | 2/19/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 2/19/2019 | | PASS |
|
|
|
CFH date Feb 8th
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/14/2019 | | PASS |
|
|
|
Failed per Melissa - CAT II hillside permit approved under CFH19-000001. Please upload Site suitability letter by Materials Testing and Inspection dated January 24, 2019 prior to acceptance for building permit review. Melissa ###-####
|
Application received | | | 2/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 4 2019 10:58AM
|
Routing - PLANNING | 2/19/2019 | | | | FAIL |
|
|
|
Please show the entire driveway. Not to excede 33 ft. in width in front setback.
|