Permit Information
Permit NumberBLD19-00417
StatusFinaled
Name VISSER BUILDING CO
Site Address 731 W WYNDEMERE DR
Project NamePape Addition
Customer Number 
ePlanReviewYes
Description
HILLSIDE - WUI - Permit for a 1,335 addition to an existing home. Projects adds 3bd/1bth new bedrooms to the main level, an additional parking stall to the garage, and access to the basement with a new window well and egress stair. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** LGMA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/10/20202/11/20202/11/2020APASS
DetailsTony Young
Andrew Phone #: ###-####
DOC - Permit Finaled2/11/20202/11/20202/11/2020PPASS
DetailsTony Young
PubWorks Occupancy Approval2/10/20202/10/20202/10/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final2/5/20202/7/20202/7/2020PPART
DetailsTony Young
aNDERW Phone #: ###-####.. just needs PW pass
BLD-Conference2/6/20202/7/20202/7/2020APASS
DetailsTony Young
ANDERW Phone #: ###-####,, on final/// ok,, needs hillside
BLD-Aging Inspection1/31/20201/31/20202/4/2020 PEND
DetailsTony Young
BLD-Energy code compliance9/19/20199/19/20199/19/2019PPASS
DetailsTony Young
Andrew Phone #: ###-####// work in progress,, ok
BLD-Framing/Rough-in9/3/20199/10/20199/10/2019PPART
DetailsDave Hannah
Andrew Phone #: ###-#### ok to insulate but needs to fire block walls fur outs around fire places ect
BLD-Wall Bracing8/9/20198/12/20198/12/2019APASS
DetailsTony Young
Andrew Phone #: ###-####.. exterior ok
BLD-Framing/Rough-in8/8/20198/9/20198/9/2019ANR
DetailsTony Young
Andrew Phone #: ###-####
BLD-Conference8/6/20198/6/20198/6/2019PPART
DetailsTony Young
Andrew Phone #: ###-####,, ? about insulating an existing basement wall,, ok to leave as is
Routing - MECHANICAL7/12/2019 7/12/2019 PASS
DetailsTroy James
New manual j report
BLD-Foundation6/19/20196/19/20196/19/2019PPASS
DetailsTony Young
Andrew Phone #: ###-####,, front pation wall
BLD-Footing6/17/20196/18/20196/18/2019APART
DetailsTony Young
Andrew Phone #: ###-####,, front patio wall footing ok
BLD-Foundation6/6/20196/6/20196/6/2019PPART
DetailsTony Young
Looking to pour tomorrow morning Phone #: ###-#### Inspection requested via web by Ben Sears,, work in progress,, foundation and closing in basement wall areas where old windows were,, basement slab footings
BLD-Footing6/4/20196/5/20196/5/2019APART
DetailsTony Young
Andrew Phone #: ###-####
PubWorks Subgrade Approval6/5/20196/5/20196/5/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Footing6/4/20196/4/20196/4/2019PNR
DetailsTony Young
Andrew Phone #: ###-####,, needs soils
Issue PAID IN FULL permit  5/8/2019 DONE
OVERRIDE  4/5/2019  
Plan assigned to (JAB) Josh2/19/20192/19/20194/5/2019 PASS
DetailsJosh Bogle
2/25 addition, ePlan - 1st done
Routing - PLAN CHECK4/5/2019 4/5/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/5/2019 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  4/5/2019 DONE
all met: andrew@visserbuilding.com

Need
RP
GC Form
Routing PW Grading-Hillside4/1/2019 4/1/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PLAN CHECK3/29/2019 3/29/2019 FAIL
DetailsJosh Bogle
soffit vent not WUI compliant
Routing - PLAN CHECK3/7/2019 3/15/2019 FAIL
DetailsJosh Bogle
awaiting verification of soffit vent for WUI compliance
Routing PW Grading-Hillside3/7/2019 3/13/2019 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Plan Reviewer's activity  3/7/2019 DONE
DetailsJosh Bogle
accepted & routed resubmittals
Routing - PLANNING3/7/2019 3/7/2019 PASS
DetailsNicolette Womack
CVA19-00003 Approval.
Routing - MECHANICAL2/22/2019 3/1/2019 PASS
DetailsChad Schwendiman
Routing - PLAN CHECK2/19/2019 3/1/2019 FAIL
DetailsJosh Bogle
see email 3/1 to Deirdra
1st review completed  3/1/2019 FAIL
DetailsJosh Bogle
Routing PW Grading-Hillside2/20/2019 2/27/2019 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Routing - Erosion and Sediment2/19/2019 2/25/2019 PASS
DetailsMichael Zawacki
RP needed
Plan Reviewer's activity  2/22/2019 DONE
DetailsJosh Bogle
Plan Review begun (see notes in folder) - waiting for other Depts. before finishing review
Routing - PLANNING2/19/2019 2/21/2019 FAIL
DetailsNicolette Womack
Appeal Period ends March 1st at 5 pm.
Routing - FIRE2/19/20192/19/20192/20/2019 PASS
DetailsLee G Meredith
Applicant to provide a fire flow availablility report from SUEZ.
Document provided 3-11-19. Sprinklers not required.
Routing - PUBLIC WORKS2/19/2019 2/20/2019 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  2/19/2019 DONE
Intake Approval  2/19/2019 PASS
Recd Pcfee & Taken To Pln CK  2/19/2019 DONE
Intake Approval  2/13/2019 FAIL
Spoke Nicolette, we will need to wait until Monday to start the review. Waiting for variance application.
Intake Approval  2/12/2019 FAIL
CAT I hillside permit with a variance. Melissa Jannusch ###-####.
Once the variance application has been approved by P&Z upload the approval letter and then this building permit case can be routed for review. Please wait for the appeal period to end on 2/15/19 @ 5pm. If you have any questions about the variance please contact Nicolette W ###-####
Application received  2/11/2019 DONE
Application submitted via PDS Online on Feb 11 2019 8:59AM