First Notice | | 7/27/2019 | 8/5/2019 | | DONE |
|
|
|
mailed 8-5-2019
|
Permanent Occupancy | | | 7/17/2019 | | DONE |
|
|
|
|
BLD-Final | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Dave Hannah
|
|
|
Armando Phone #: ###-####
|
BLD-Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PEND |
Dave Hannah
|
|
|
Armando Phone #: ###-####
|
Zoning Approval | 7/16/2019 | 7/16/2019 | 7/16/2019 | | PASS |
KayCee Babb
|
|
|
|
FIRE-Final Inspection | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.
Armando Phone #: ###-####
|
Zoning Approval | 7/15/2019 | 7/15/2019 | 7/15/2019 | | FAIL |
KayCee Babb
|
|
|
Accessible parking sign needs to be removed from non accessible parking stall and relocated to newly painted accesible parking stall to meet ADA requirements.
|
OVERRIDE | | | 7/12/2019 | | |
|
|
|
|
Print Occupancy Form | | | 7/12/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 7/12/2019 | | DONE |
|
|
|
plan mod
|
Permit Ready to Issue | | | 7/12/2019 | | DONE |
|
|
|
DO NOT ISSUE plan mod accepted
|
Plan assigned to (JG) | 7/8/2019 | 7/8/2019 | 7/11/2019 | | PASS |
Javier Guzman
|
|
|
Plan Mod VANILLA – RADAR BLDG ePlan
|
Routing - PLAN CHECK | 7/10/2019 | | 7/11/2019 | | PASS |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 7/11/2019 | | DONE |
Javier Guzman
|
|
|
Per Architect phone conversation on 7/11/2019 this new opening #2 already had an existing beam header over the new reconstructed wall. This area of the new framed opening #2 is not load bearing per architect Matt Rhees
|
Routing - PUBLIC WORKS | 7/10/2019 | | 7/10/2019 | | PASS |
Angela Hardy
|
|
|
|
FIRE-Final Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | CANC |
Jim Page
|
|
|
As of these notes the permit status is under review for floor plan modifications, floor plan needs to match city approved drawings for life fire safety inspection, need permit to be in issued status for life fire safety inspection to be completed, this request is cancelled and a new inspection will need to be requested when permit is back in issued status.
Armodo Phone #: ###-####
|
Plan Modification Accepted | | | 7/8/2019 | | DONE |
|
|
|
minor floor plan modification
|
BLD-Ceiling Grid Inspection | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PASS |
Dave Hannah
|
|
|
Armando Phone #: ###-####
|
BLD-Other | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | DEFR |
Dave Hannah
|
|
|
welding // almondo Phone #: ###-#### needs spec insp
|
BLD-Concrete | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | DONE |
Dave Hannah
|
|
|
Armando Phone #: ###-####
|
BLD-Energy code compliance | 5/8/2019 | 5/8/2019 | 5/9/2019 | P | PASS |
Dave Hannah
|
|
|
after 2 // Armando Phone #: ###-####
|
BLD-Framing/Rough-in | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
BLD-Conference | 3/22/2019 | 3/25/2019 | 3/25/2019 | A | DONE |
Dave Hannah
|
|
|
Ken Phone #: ###-####
|
Route to Impact Fee Review | 3/14/2019 | 3/17/2019 | 3/15/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Issue PAID IN FULL permit | | | 3/15/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/14/2019 | | |
|
|
|
|
Plan assigned to (JG) | 2/22/2019 | 2/22/2019 | 3/14/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 3/13 (L3) Radar Building - Shell & 1st Flr Vanilla TI, ePlan
|
Routing - PLAN CHECK | 2/22/2019 | | 3/14/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 3/14/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 3/14/2019 | | 3/14/2019 | | PASS |
KayCee Babb
|
|
|
Per CZC19-00016, as updated 3-11-19.
|
Routing - PLAN CHECK | 3/14/2019 | | 3/14/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 3/14/2019 | | 3/14/2019 | | PASS |
Javier Guzman
|
|
|
Detail 12 on A4.0 shows the plate being 3"x3" but the callout is a 4"x4" plate. According to the calculations the the anchor bolt spacing is to be 3" on center. It appears that the 3" dimension shown in detail 12 on A4.0 should be to the anchor bolts and not the end of the base plate. Please verify.
Revised detail 12 on plan sheet A4.0 showed the base plate being 4” x 4” with the pre drilled holes at 3” on center according to outsource engineers changemark request. Plans were not resent to outsource.
(engineers chagemark stated the following “Detail 12 on A4.0 shows the plate being 3"x3" but the callout is a 4"x4" plate. According to the calculations the the anchor bolt spacing is to be 3" on center. It appears that the 3" dimension shown in detail 12 on A4.0 should be to the anchor bolts and not the end of the base plate. Please verify.” )
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/14/2019 | | DONE |
|
|
|
NEED
REVISED VALUE
RP
|
Routing Off Site - STRUCTURAL | 2/22/2019 | | 3/13/2019 | | FAIL |
Javier Guzman
|
|
|
failed in ePlan by AHJ Engineers Chris Holladay
|
Routing - Erosion and Sediment | 2/22/2019 | | 3/11/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver request approved. Need to designate who the onsite ESC Responsble Person will be.
|
Routing - MECHANICAL | 2/22/2019 | | 2/27/2019 | | PASS |
Troy James
|
|
|
Permit for exterior work only
|
Routing - PLUMBING | 2/22/2019 | | 2/22/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 2/22/2019 | | 2/22/2019 | | PASS |
Doug Chausow
|
|
|
Suite 100
|
Routing - PUBLIC WORKS | 2/22/2019 | | 2/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 2/22/2019 | | 2/22/2019 | | FAIL |
KayCee Babb
|
|
|
Submitted plans vary from those approved through CZC19-00016. Elevations differ and rooftop mechanical equipment was never reviewed. Applicant needs to provide Design Review Staff with updated drawings and equipment details for review.
|
Intake Approval | | | 2/22/2019 | | PASS |
Brian McGowan
|
|
|
Prescreen approved by Brian McGowan.
|
Intake Approval | | | 2/19/2019 | | FAIL |
Brian McGowan
|
|
|
In order to finish processing the Prescreen please resolve the following:
1. The Engineer's designs on the Architectural Sheets need to have the Engineer's stamp and signature.
Thank you,
|
Application received | | | 2/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 15 2019 4:42PM
|