Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-00594
StatusFinaled
Name 2753 STATE LLC
Site Address 2753 W STATE ST
Project NameWildflower - TI
Customer Number 
ePlanReviewYes
Description
(WILDFLOWER – FLOWER SHOP – INTERIOR TENANT IMPROVEMENT) This building does not have a fire sprinkler system. To remodel the existing 1,405 square foot interior area of a tenant space within a 2,365 square building (including the 960 square foot canopy) for a new flower shop. Work is to include a 126 square foot walk-in cooler (about 144 square feet including the perimeter cooler walls), a pressure treated wood floor infill to align the floor surface with the main floor level, suspended acoustical ceilings, gypsum board ceilings, sinks, and interior finishes. Building shell work was done under permit BLD18-02750. Work under that permit included a janitor’s closet with a mop sink, installing glass overhead doors (safety glass with a U-factor of .45 and SHGC of .58), a new toilet room accessible to the disabled, and an exterior screen wall (fence). The new work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/2/201912/30/2019 DONE
mailed with second follow up on 1-1-20
Second Follow up  12/30/2019 DONE
Third Notice 10/30/201911/27/2019 DONE
mailed 12-2-19 with first follow up
First Follow up  11/27/2019 DONE
Third Notice 9/23/201910/25/2019 DONE
mailed 11-1-19
Third Notice 8/17/20199/18/2019 DONE
mailed 9-19-19
Second Notice 7/20/20198/12/2019 DONE
mailed 8-13
First Notice 5/24/20197/10/2019 DONE
mailed 7-11
Permanent Occupancy  5/14/2019 DONE
BLD-Final5/2/20195/3/20195/3/2019PPASS
DetailsDave Hannah
John Phone #: ###-####
FIRE-Final Inspection5/2/20195/3/20195/3/2019APASS
DetailsMark Scharfen
Conducted fire life safety. Passed.

John Phone #: ###-####
BLD-Ceiling Grid Inspection4/19/20194/22/20194/22/2019APART
DetailsMike Jordan
Jon Phone #: ###-####. Ceiling grid ok, pend MEP rough in inspections.
BLD-Conference4/2/20194/3/20194/3/2019ADONE
DetailsDave Hannah
Jon- this can just be a phone consultation. Phone #: ###-####
Print Occupancy Form  3/20/2019 DONE
Issue PAID IN FULL permit  3/20/2019 DONE
Plan assigned to (CJW)3/5/20193/5/20193/18/2019 PASS
DetailsCarl Westfall
(1st done) 03/13/19 (L2 - 7 days) (ePlan - 18 sheets) Wildflower TI (routed back to applicant)
Routing - PLAN CHECK3/15/2019 3/18/2019 PASS
DetailsCarl Westfall
Routing - Design Review3/18/2019 3/18/2019 PASS
DetailsKayCee Babb
Per CZC19-00044, to follow all Conditions of Approval.
PLANS/APPL TAKEN TO FRONT DESK  3/18/2019 DONE
Permit Ready to Issue  3/18/2019 DONE
Need GC
Need Rev cert of val
Plan resubmittals received  3/15/2019 DONE
came in on a Friday
Route to Impact Fee Review3/13/20193/16/20193/14/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  3/13/2019 DONE
Plan resubmittals requested  3/13/2019 DONE
Routing - PLAN CHECK3/5/2019 3/13/2019 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - MECHANICAL3/5/2019 3/7/2019 PASS
DetailsTroy James
Routing - PLUMBING3/5/2019 3/6/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Design Review3/5/2019 3/6/2019 FAIL
DetailsKayCee Babb
Zoning Certificate CZC19-00044 has been submitted, but is still under review. The Zoning Certificate must be approved and the appeal period lapsed prior to Design Review sign-off.
Routing - Addressing3/5/2019 3/6/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/5/2019 3/6/2019 PASS
DetailsMorgan Webb
Intake Approval  3/5/2019 PASS
DetailsJoe Bruce
Intake Approval  2/28/2019 FAIL
DetailsJoe Bruce
Please provide the following to complete your application:
1) Provide planning and zoning letter of approval for the exterior (ground mounted) mechanical unit shown on sheet M1.0. Contact Kaycee Babb for any questions regarding Design Review approval. ###-#### - This Certificate of Zoning compliance is required prior to submitting for a building permit.
2) Provide a site plan showing the location of the proposed ground mounted mechanical unit.
3) A general note for the fire extinguisher was shown on sheet A100, but the "location" on the plan could not be found as required by the checklist. Please provide fire extinguisher location on the floor plan.
Application received  2/26/2019 DONE
Application submitted via PDS Online on Feb 26 2019 6:38PM