Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-00671
StatusFinaled
Name PROOF PROPERTIES LLC
Site Address 210 N 10TH ST
Project NameRe-Pop Gifts LLC
Customer Number 
ePlanReviewNo
Description
**(RE-POP GIFTS LLC) ** This Building is NOT fire sprinklered. Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 2,262 sq. f.t (1,381 main floor and 881 upper floor) existing retail tenant. This space was previously occupied by "Trip Taylor Bookstore" under BLD05-00116 (there exists an open stairway to serve the 2nd story, a 1-hr enclosed stairway to serve the 2nd story, see Reference Only Plans). NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  4/3/2019 DONE
BLD-Ceiling Grid Inspection3/11/20193/13/20193/13/2019ACANC
DetailsDave Hannah
Millie Phone #: ###-####
BLD-Final3/13/20193/13/20193/13/2019APASS
DetailsDave Hannah
FIRE-Final Inspection3/12/20193/13/20193/13/2019APASS
DetailsJim Page
Previoulsy noted items have been corrected, final life fire safety inspection for area of work complete.

Nelly Phone #: ###-####
FIRE-Final Inspection3/11/20193/12/20193/12/2019AFAIL
DetailsJim Page
Provide annual inspection for fire extinguishers. Remove cabinet that reduces hallway width to 24 inches on mezzanine exit to stairs. Provide sticker on main entry reading "Door to remain unlocked while building is occupied". Provide addressing for suite.

Millie Phone #: ###-####
Plan assigned to (BJM)3/4/20193/4/20193/11/2019 DONE
DetailsBrian McGowan
03/11 (L1 #528) Re-Pop Gifts LLC
Routing - PLAN CHECK3/4/2019 3/11/2019 PASS
DetailsBrian McGowan
1st review completed  3/11/2019 DONE
DetailsBrian McGowan
Case Summary (BLD)  3/11/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/11/2019 DONE
DetailsBrian McGowan
Print Occupancy Form  3/11/2019 DONE
Permit Ready to Issue  3/11/2019 DONE
Telephone call  3/11/2019 DONE
called Millie to let know permit is ready
Issue PAID IN FULL permit  3/11/2019 DONE
Plans ACCEPTED BY PLAN TECH  3/4/2019 DONE
Intake Approval  3/4/2019 PASS
Recd Pcfee & Taken To Pln CK  3/4/2019 DONE
First Notice 4/13/2019   
First Notice 4/13/2019   
Application received 3/4/2019