Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-00807
StatusFinaled
Name CBH HOMES
Site Address 9665 W ROAN MEADOWS CT
Project NameLOT 04 BLK 02 DIAMANTE SUB
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2332 sq. ft., two story (first story 1032 sq. ft., second story 1300 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 64 sq. ft. of covered patio/porch and a 684 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1A zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/22/20197/23/20197/23/2019APASS
DetailsMike Jordan
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled7/23/20197/23/20197/23/2019PPASS
DetailsMike Jordan
BLD-Blower Door Test Results7/23/20197/23/20197/23/2019ADONE
DetailsMike Jordan
4.7
BLD-Final7/16/20197/17/20197/17/2019ANR
DetailsMike Jordan
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs plumbing final.
BLD-Energy code compliance6/3/20196/4/20196/4/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in5/31/20196/3/20196/3/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Wall Bracing5/20/20195/20/20195/20/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Wall Bracing5/9/20195/10/20195/10/2019PPART
DetailsBrandon Shaw
Work in progress...
Interior CS-WSP to be installed before framing rough-in...
BLD-Foundation5/2/20195/3/20195/3/2019PPASS
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing5/1/20195/2/20195/2/2019PPASS
DetailsJim Sly
Dane Phone #: ###-####-was scheduled to Mike J-but as per customer reassign to Jim Sly
Issue PAID IN FULL permit  4/18/2019 DONE
Inspection Record Card- Bld  4/18/2019 DONE
OVERRIDE  3/29/2019  
Plan assigned to (RDP)3/14/20193/14/20193/29/2019 DONE
DetailsRob Patrick
03/27 sfd L1 ePlan...03/26 Failed, Braced Wall Calculations Req'd
Routing - PLAN CHECK3/29/2019 3/29/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  3/29/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  3/29/2019  
1st review completed  3/26/2019 FAIL
DetailsRob Patrick
Braced Wall Calculations Req'd
Routing - PLAN CHECK3/14/2019 3/26/2019 FAIL
DetailsRob Patrick
Braced Wall Calculations Req'd
Route to Impact Fee Review3/14/20193/17/20193/15/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL3/14/2019 3/15/2019 PASS
DetailsTroy James
Routing - Addressing3/14/2019 3/15/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/14/2019 3/15/2019 PASS
DetailsMorgan Webb
Application received  3/14/2019 DONE
Application submitted via PDS Online on Mar 14 2019 12:27PM
Plans ACCEPTED BY PLAN TECH  3/14/2019 DONE
Recd Pcfee & Taken To Pln CK  3/14/2019 DONE
Intake Approval  3/14/2019 PASS
Routing - PLANNING3/14/2019 3/14/2019 PASS
DetailsEthan Mansfield