Permit Information
Permit NumberBLD19-00904
StatusFinaled
Name STILLWATER CONSTRUCTION LLC
Site Address 200 E MALLARD DR
Project NameRedBuilt Shower Repair
Customer Number 
ePlanReviewYes
Description
(REDBUILT LLC) **REPAIR PERMIT** Permit is for the repair of the existing Men’s shower room due to water damage for an existing 26,108 square foot office space. There are no changes to occupancy or use under this permit, and this is a scope of work permit only. This permit does NOT establish a Certificate of Occupancy for any tenant. The prior C of O has been issued under BLD14-00454. The work is required to comply with the approved drawings and all applicable codes. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice6/19/20196/19/20197/8/2019 DONE
DetailsJim Storey
BLD-Final6/18/20196/19/20196/19/2019APASS
DetailsJim Storey
Joesph Phone #: ###-####
DOC - Permit Finaled6/19/20196/19/20196/19/2019PPASS
DetailsJim Storey
FIRE-Final Inspection6/19/20196/19/20196/19/2019PPASS
DetailsJim Page
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.

Joseph Phone #: ###-####
BLD-Framing/Rough-in4/11/20194/12/20194/12/2019APASS
DetailsJim Storey
Joseph Phone #: ###-####
BLD-Conference4/4/20194/5/20194/5/2019APART
DetailsJim Storey
Call for access- Joe Phone #: ###-#### no dimitions door and lockers of isue on aproved plans for access.
Plan Reviewer's activity  4/5/2019 DONE
DetailsJoe Bruce
Spoke with Joe (contractor) about completing the repair. The shower room shall be restored to prior condition with full accessibility compliance. **JHB**
Issue PAID IN FULL permit  4/3/2019 DONE
Inspection Record Card- Bld  4/3/2019 DONE
Plan assigned to (JHB)3/22/20193/22/20193/28/2019 PASS
DetailsJoe Bruce
(1st Rev Comp) 03/27 (L1) Redbuilt Shower Repair, eplan (Plan)
PLANS/APPL TAKEN TO FRONT DESK  3/28/2019 DONE
Permit Ready to Issue  3/28/2019 DONE
All Met
Need GC
Need Rev Val
Plan resubmittals received  3/27/2019 DONE
DetailsJoe Bruce
Routing - PLAN CHECK3/27/2019 3/27/2019 PASS
DetailsJoe Bruce
Route to Impact Fee Review3/25/20193/28/20193/25/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - PLAN CHECK3/22/2019 3/25/2019 FAIL
DetailsJoe Bruce
1st review completed  3/25/2019 FAIL
DetailsJoe Bruce
Plan resubmittals requested  3/25/2019 DONE
DetailsJoe Bruce
Application received  3/21/2019 DONE
Application submitted via PDS Online on Mar 21 2019 2:15PM
Intake Approval  3/21/2019 PASS
DetailsJoe Bruce
Prescree approved by Joe Bruce