BLD-Final | 11/25/2019 | 11/25/2019 | 11/26/2019 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
Plan Modification Accepted | | | 10/18/2019 | | DONE |
|
|
|
plan mod for manual j
|
Routing - MECHANICAL | 10/18/2019 | | 10/18/2019 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Framing/Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Dave Hannah
|
|
|
CHRIS Phone #: ###-#### ok to insulate
|
BLD-Framing/Rough-in | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | NR |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | NR |
Jim Storey
|
|
|
Christ Phone #: ###-####
|
BLD-Wall Bracing | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Jim Storey
|
|
|
Christ Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/1/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 9/13/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 9/6/2019 | | 9/13/2019 | | DONE |
Rob Patrick
|
|
|
plan mod
|
Routing - PLAN CHECK | 9/6/2019 | | 9/13/2019 | | PASS |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 9/13/2019 | | DONE |
|
|
|
plan mod
|
Plan Modification Accepted | | | 9/6/2019 | | DONE |
|
|
|
Garage is not a flat roof and truss on the main house are changing.
Two copies of each A.0.0, A2.1, A3.1, A4.1 and roof plan stamped and taken to plan reviewer.
|
BLD-Footing | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 8/27/2019 | 8/29/2019 | 8/29/2019 | A | FAIL |
Tell Riley
|
|
|
Rick Phone #: ###-####//need to string/mark property lines//west side show 6 feet on plan--measures 5 ft at inspection--need clarifacation on setbacks and lines ran to measure///
|
Routing - PLANNING | 8/29/2019 | | 8/29/2019 | | PASS |
Sue Cummings
|
|
|
plan mod
|
BLD-Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | CANC |
Mike Jordan
|
|
|
Chris Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/26/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/19/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/19/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2019 | | DONE |
|
|
|
straight to voice mail. left message for chris informing him that this permit is ready and the fee amount due for issuance
|
Plan assigned to (RDP) | | | 6/19/2019 | | DONE |
Rob Patrick
|
|
|
04/30 sfd L1 PAPER...04/22 Failed...06/4 Delivered entire package to Nicolette
|
Routing - PLAN CHECK | 6/19/2019 | | 6/19/2019 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 6/19/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/19/2019 | | DONE |
|
|
|
MET (Parcel owner is GC, if not we need GC form and RP)
|
Routing - PLANNING | 6/5/2019 | | 6/5/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PLAN CHECK | 6/5/2019 | | 6/5/2019 | | FAIL |
Rob Patrick
|
|
|
Comments Not Incorporated
|
Plan Reviewer's activity | | | 6/4/2019 | | |
Rob Patrick
|
|
|
Delivered entire package to Nicolette for resubmital review.
|
Plan resubmittals requested | | | 5/30/2019 | | DONE |
|
|
|
resubmittals recieved 2 sets of sheets A0.0,A2.1, A3.1,A4.1, S0.0, S1.0,S2.0,S2.1, S3.0,SD1.0,SD2.0-took to Rob P
|
1st review completed | | | 4/22/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 4/22/2019 | | 4/22/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - MECHANICAL | | | 4/22/2019 | | PASS |
|
|
|
|
Route to Impact Fee Review | 4/17/2019 | 4/20/2019 | 4/19/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 4/17/2019 | | 4/19/2019 | | FAIL |
Nicolette Womack
|
|
|
Required to provide two off-street parking spaces located outside of the required setbacks.
|
Plan resubmittals received | | | 4/19/2019 | | DONE |
|
|
|
Two copies of new site plans stamped and taken to planner
|
Routing - Addressing | 4/17/2019 | | 4/17/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/17/2019 | | 4/17/2019 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/17/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/17/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/17/2019 | | PASS |
|
|
|
|
Intake Approval | | | 3/22/2019 | | FAIL |
|
|
|
NEED
HEIGHT POINTS ON ELEVATION
ROOF PLAN/FRAMING (TRUSSES, RAFTERS AND/OR JOIST TYPE,ECT)
WALL BRACING
FLOOR JOISTS
FOUNDATION PLAN
|
Intake Approval | | | 3/22/2019 | | FAIL |
|
|
|
see attached list in documents given to customer.
|
Application received | | 3/22/2019 | | | |
|
|
|
|