Information based on query as of Saturday, June 1, 2024.
Permit Information
Permit NumberBLD19-01055
StatusFinaled
Name CK ROGERS
Site Address 1760 W SILVER CREST DR
Project NameClever Residence
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 4180 sq. ft., two story (first story 3441 sq. ft., second story 739 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 581 sq. ft. of covered patio/porch and a 1860 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. A-1 zoning and setbacks per planning. ***RDP*** NO SPRINKLERS REQUIRED. LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/24/20206/25/20206/25/2020APASS
DetailsTony Young
screened // Clint Phone #: ###-####
DOC - Permit Finaled6/25/20206/25/20206/25/2020PPASS
DetailsTony Young
c of o issued
PubWorks Occupancy Approval6/24/20206/24/20206/24/2020 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
BLD-Aging Inspection5/27/20205/27/20206/3/2020 PEND
DetailsTony Young
BLD-Aging Inspection5/26/20205/26/20205/27/2020 PEND
DetailsTony Young
BLD-Energy code compliance1/13/20201/13/20201/13/2020PPASS
DetailsTony Young
Jeremy Phone #: ###-####
BLD-Framing/Rough-in1/6/20201/6/20201/6/2020PPASS
DetailsTony Young
Luke Phone #: ###-####
BLD-Framing/Rough-in1/3/20201/6/20201/6/2020ADEFR
DetailsTony Young
Luke Phone #: ###-####, defr to pm
BLD-Framing/Rough-in1/3/20201/3/20201/3/2020PNR
DetailsTony Young
Luke Phone #: ###-####
BLD-Conference1/2/20201/3/20201/3/2020APART
DetailsTony Young
Luke Phone #: ###-####,, frame ?s
BLD-Framing/Rough-in1/2/20201/2/20201/2/2020PNR
DetailsTony Young
Luke Phone #: ###-####,,mostly done but still corrections needed,, will set up a conference
BLD-Framing/Rough-in12/24/201912/26/201912/26/2019AFAIL
DetailsTony Young
Luke Phone #: ###-####// frame walk through only,, will need truss fixes also on missing plate,, possible backwards foor trusses
BLD-Framing/Rough-in12/23/201912/24/201912/24/2019APART
DetailsTony Young
jeremy Phone #: ###-####,, frame not ready,, soffits are work in progress,, ok
BLD-Other12/19/201912/20/201912/20/2019ANR
DetailsMike Jordan
Jeremy Phone #: ###-####// soffit. No soffit material on site or being installed.
BLD-Wall cover12/18/201912/19/201912/19/2019ANR
DetailsTony Young
Jeremy Phone #: ###-####// soffit material not on site yet
BLD-Conference11/13/201911/14/201911/14/2019APEND
DetailsTony Young
Luke Phone #: ###-####,, cut back garage doors,, need to verify with engineer on hold downs and shear
BLD-Framing/Rough-in10/25/201910/28/201910/28/2019ANR
DetailsTell Riley
call half hour before // John Phone #: ###-####//wanted to do walk through prior to trades rough ins//discussed some issues an noted areas to double check prior to framing inspection//framing inspection will need to be completed after rough ins are inspected and passed//still need engineering fix for garage door areas where hold downs were removed//
BLD-Framing/Rough-in10/25/201910/25/201910/25/2019PDEFR
DetailsJim Storey
call half hour before // John Phone #: ###-####//out of time
BLD-Wall Bracing10/4/201910/4/201910/4/2019PPART
DetailsTell Riley
shear // John Phone #: ###-####//shear nailing exterior ok//will need engineer to provide fix for missed hold downs at garage and front wall//interior shear walls were not complete at inspection//ok to wrap house when 2nd level straps and nails added as discussed//
BLD-Other8/6/20198/7/20198/7/2019APASS
DetailsTony Young
under floor - Nathan Phone #: ###-####
BLD-Foundation6/24/20196/24/20196/24/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing6/17/20196/17/20196/17/2019PPASS
DetailsTony Young
Nick Phone #: ###-####
PubWorks Subgrade Approval6/7/20196/7/20196/7/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  5/14/2019 DONE
OVERRIDE  5/3/2019  
Inspection Record Card- Bld  5/3/2019 DONE
Telephone call  5/3/2019 DONE
spoke with clint informing him that this permit is ready and the fee amount due for issuance
Print Occupancy Form  5/3/2019 DONE
Permit Ready to Issue  5/3/2019 DONE
Routing PW Grading-Hillside5/2/2019 5/2/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.

Routing - PUBLIC WORKS5/2/2019 5/2/2019 PASS
DetailsAngela Hardy
Plan Reviewer's activity  5/2/2019  
DetailsRob Patrick
Delivered entire dwg package to Andy for his review for Resp. Person.
Routing - Erosion and Sediment5/2/2019 5/2/2019 PASS
DetailsAndy J. Long
Certified RP now assigned to project. ESC plan approved. Site preparation inspection is required
PLANS/APPL TAKEN TO FRONT DESK  5/2/2019 DONE
Routing - MECHANICAL4/26/2019 4/26/2019 PASS
DetailsTroy James
Plan resubmittals received  4/25/2019 DONE
Resubmittals received 3 sets of sheets L-1.2 & 2 material testing -took to PDP
Plan Reviewer's activity  4/25/2019  
DetailsRob Patrick
Took resubmitted Grading Plans to Melissa.
Plan assigned to (RDP)4/11/20194/11/20194/24/2019 DONE
DetailsRob Patrick
4/30 sfd L2 PAPER...1st Complete (Passed) waiting for other departments to pass.
Routing - PLAN CHECK  4/24/2019 PASS
DetailsRob Patrick
Holding for resubmittal for other departments comments
1st review completed  4/24/2019 DONE
DetailsRob Patrick
Routing - FIRE4/23/20194/23/20194/23/2019 PASS
DetailsLee G Meredith
New fire flow report from SUEZ and new access measurements both meet code requirements. No sprinklers required.
Routing - MECHANICAL  4/23/2019 FAIL
DetailsTroy James
Emailed corrections to heating supply
Routing - PLANNING4/23/2019 4/23/2019 PASS
DetailsSue Cummings
Routing - FIRE  4/18/2019 FAIL
DetailsLee G Meredith
04/30 1760 W Silver Crest Residential Review

Exceeds access distance and fire flow availability not provided.
Routing - Erosion and Sediment4/16/2019 4/17/2019 FAIL
DetailsAndy J. Long
RP listed on applications is not associated with project. Need to designate a certified Responsible Person with current training and has operational control at the site, like the General Contractor. False information on permits is a violation.
Routing PW Grading-Hillside4/12/2019 4/16/2019 FAIL
DetailsMelissa Jannusch
Revisions requested
Route to Impact Fee Review4/11/20194/14/20194/12/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing4/11/2019 4/12/2019 PASS
DetailsDoug Chausow
Intake Approval  4/11/2019 PASS
Recd Pcfee & Taken To Pln CK  4/11/2019 DONE
Intake Approval  4/3/2019 FAIL
NEED
2 Copies of GEO (per M)
3 Copies of Grading and Drainage (per M)
Site Suitanility Letter based on G & D Plans from MTI (per M)
Need second copy of all documents
Checklist needs to be full filled out (page number/letters not marked)
Application received 4/3/2019   
Routing - PUBLIC WORKS    FAIL