BLD-Foundation | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
Permit Ready to Issue | | | 8/30/2019 | | DONE |
|
|
|
Plan mod approved-fees due
|
CHANGE STATUS TO (ISS) | | | 8/30/2019 | | |
|
|
|
|
Plan Modification Accepted | | | 8/29/2019 | | DONE |
|
|
|
Turning in more shed plans, stamped and taken to plan reviewer.
|
Plan assigned to (RDP) | 8/29/2019 | | 8/29/2019 | | DONE |
Rob Patrick
|
|
|
09/04 Plan Mod
|
Routing - PLAN CHECK | 8/29/2019 | | 8/29/2019 | | PASS |
Rob Patrick
|
|
|
|
Plan assigned to (RDP) | 8/2/2019 | 8/2/2019 | 8/19/2019 | | DONE |
Rob Patrick
|
|
|
08/09 Plan Mod...08/05 Failed per Planning
|
Routing - PLANNING | 8/19/2019 | | 8/19/2019 | | PASS |
Sue Cummings
|
|
|
measure from exterior of the wall please
|
Routing - PLAN CHECK | 8/19/2019 | | 8/19/2019 | | PASS |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/19/2019 | | DONE |
|
|
|
PLAN MOD
|
Telephone call | | | 8/19/2019 | | DONE |
|
|
|
Tried calling ###-####, but mail box is full. left a message with casey the parcel owner.
|
Plan resubmittals received | | | 8/16/2019 | | DONE |
|
|
|
resumittals received 2 sheets of A1.1-took to Rob P
|
BLD-Energy code compliance | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | CANC |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####-per Brandon-inspection did not pass-was not done-Brandon talked to customer so he knows
|
BLD-Framing/Rough-in | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need Ele rough-in... Provide truss Engineering...
|
Routing - PLANNING | 8/5/2019 | | 8/5/2019 | | FAIL |
Sue Cummings
|
|
|
Plan mod with no site plan. No site plan in Tidemark to compare either.
|
Routing - PLAN CHECK | 8/5/2019 | | 8/5/2019 | | FAIL |
Rob Patrick
|
|
|
Planning requires Site Plan.
|
Plan Modification Accepted | | | 8/2/2019 | | DONE |
|
|
|
plan mod -changining carport into a garage and relocating. stamped it and took to Rob P for his plan review
|
Plan Modification Accepted | | | 8/2/2019 | | DONE |
|
|
|
plan mod accepted in paper-received 2 Tuff shed calcs and 2 sheets A1.0-took to Rob P
|
BLD-Wall Bracing | 7/21/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Jim Storey
|
|
|
Please call above number when headed to job site. Plans are right inside the front door to the left as you enter. Phone #: ###-#### Inspection requested via web by Jeff Fawson
|
Routing - MECHANICAL | 7/16/2019 | | 7/16/2019 | | PASS |
Chad Schwendiman
|
|
|
|
BLD-Wall Bracing | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jeff Fawson Inspection cancelled from web by: Jeff Fawson
|
BLD-Wall Bracing | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | FAIL |
Brandon Shaw
|
|
|
Provide City approved plans...
|
BLD-Wall Bracing | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | FAIL |
Brandon Shaw
|
|
|
No plans or permit on site...
|
BLD-Wall Bracing | 7/1/2019 | 7/2/2019 | 7/2/2019 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jeff Fawson Inspection cancelled from web by: Jeff Fawson
|
BLD-Wall Bracing | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | CANC |
Jim Storey
|
|
|
Please call above number when you''re on your way out so I can meet you if possible. Phone #: ###-#### >> Inspection requested via web by Jeff Fawson Inspection cancelled from web by: Jeff Fawson
|
BLD-Framing/Rough-in | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Jeff Fawson
|
BLD-Foundation | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Jim Storey
|
|
|
If able please call when on your way so I can meet you on site for any questions. Phone #: ###-#### Inspection requested via web by Jeff Fawson
|
BLD-Footing | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Jim Storey
|
|
|
Please call before so I can meet on site. Plans are elocated in East wall Phone #: ###-#### Inspection requested via web by Jeff Fawson
|
BLD-Footing | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | CANC |
Jim Storey
|
|
|
Footing forms inspection. If able please call ahead so that I can meet you on site. Phone #: ###-#### Inspection requested via web by Jeff Fawson
|
BLD-Footing | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | CANC |
Jim Storey
|
|
|
Jeff Phone #: ###-#### Inspection cancelled from web by: Jeff Fawson
|
Issue PAID IN FULL permit | | | 4/15/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | DONE |
Rob Patrick
|
|
|
|
Plan assigned to (RDP) | 4/9/2019 | 4/9/2019 | 4/9/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/9/2019 | | DONE |
|
|
|
Need
GC will be in to pick up and sign for the permit. so need GC form
|
Inspection Record Card- Bld | | | 4/9/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 4/9/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 4/9/2019 | | 4/9/2019 | | PASS |
Rob Patrick
|
|
|
|
Routing Walk-In (Zoning) | 4/4/2019 | 4/4/2019 | 4/4/2019 | A | PASS |
Brent Moore
|
|
|
|
Routing Walk-In (BLD) | 4/4/2019 | 4/4/2019 | 4/4/2019 | P | FAIL |
Rob Patrick
|
|
|
|
1st review completed | | | 4/4/2019 | | DONE |
Rob Patrick
|
|
|
|
Application received | | 4/4/2019 | | | |
|
|
|
|