BLD-Final | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Tell Riley
|
|
|
Whitney Phone #: ###-####//ok per plans//no rail required at lower deck//
|
DOC - Permit Finaled | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Tell Riley
|
|
|
wITNEY Phone #: ###-####//per plans//
|
BLD-Footing | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Jim Sly
|
|
|
Call ahead // Whitney Phone #: ###-####
|
Routing Walk-In (BLD) | 5/10/2019 | 5/10/2019 | 5/10/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/10/2019 | | 5/10/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/10/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/10/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 5/10/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/10/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Sue Cummings
|
|
|
Redrew site plan. Out of easement now.
|
Routing Walk-In (BLD) | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/23/2019 | | 4/23/2019 | | FAIL |
Josh Bogle
|
|
|
needs lateral engineering for upper level deck
|
1st review completed | | | 4/23/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 4/19/2019 | 4/19/2019 | 4/19/2019 | A | FAIL |
Brent Moore
|
|
|
10' easement along rear and side yard. Plans need to be revised to allow this easement.
|
Application received | | 4/19/2019 | | | |
|
|
|
|