Permit NumberBLD19-01605
StatusFinaled
Name ESI
Site Address 5605 W OVERLAND RD
Project NameEdward Jones
Customer Number 
ePlanReviewYes
Description
**(EDWARD JONES)** Permit is to remodel an existing 1,140 sq. ft. business space (the Basement is not being modified or part of this permit). Property was originally modified from a residence into an office by BLD03-01424. Approval is contingent upon adhering to the approved plans on file. Work to include: removing an existing door and filling in with a wall, miscellaneous electrical modifications, new flooring throughout, miscellaneous HVAC modifications to balance the system, select new office doors, new electrical and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is not sprinklered. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/30/201911/27/2019 DONE
mailed 12-2-19 with first follow up
First Follow up  11/27/2019 DONE
Third Notice 9/23/201910/25/2019 DONE
mailed 11-1-19
Third Notice 8/17/20199/18/2019 DONE
mailed 9-19-19
Second Notice 7/20/20198/12/2019 DONE
mailed 8-13
First Notice 7/1/20197/10/2019 DONE
mailed 7-11
BLD-Final6/20/20196/21/20196/21/2019APASS
DetailsTell Riley
Josh Phone #: ###-####//changes made per plans// final complete//
Permanent Occupancy  6/21/2019 DONE
FIRE-Final Inspection6/20/20196/20/20196/20/2019PPASS
DetailsTroy Cobbley
Life safety passed

Josh Phone #: ###-####
FIRE-Final Inspection6/19/20196/19/20196/19/2019PFAIL
DetailsTroy Cobbley
Need to mount the fire extinguisher as discussed and provide single action hardware on the new interior doors and rear exit door. The main exit door needs to have the thumbturn deadbolt removed and sticker provided (keyed is ok)

Josh Phone #: ###-####
BLD-Final6/19/20196/20/20196/19/2019ACANC
DetailsTell Riley
Josh Phone #: ###-####
Print Occupancy Form  5/16/2019 DONE
Issue PAID IN FULL permit  5/16/2019 DONE
Plan assigned to (BJM)5/13/20195/13/20195/15/2019 DONE
DetailsBrian McGowan
05/16 L1 Edward Jones ePlan
Routing - PLAN CHECK5/13/2019 5/15/2019 PASS
DetailsBrian McGowan
1st review completed  5/15/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  5/15/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  5/15/2019 DONE
MET BOBFLEMING@ESI-EXPRESS.COM
NEED GC
NEED Rev Val
Intake Approval  5/13/2019 PASS
DetailsJavier Guzman
Routing - Addressing5/13/2019 5/13/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/13/2019 5/13/2019 PASS
DetailsAngela Hardy
Application received  5/7/2019 DONE
Application submitted via PDS Online on May 7 2019 4:30PM