BLD-Final | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PASS |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
DOC - Permit Finaled | 6/11/2020 | 6/11/2020 | 6/11/2020 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/10/2020 | 6/10/2020 | 6/11/2020 | P | PASS |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Final | 6/5/2020 | 6/8/2020 | 6/10/2020 | A | PEND |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Final | 6/9/2020 | 6/9/2020 | 6/10/2020 | P | PEND |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
|
BLD-Blower Door Test Results | 6/9/2020 | 6/9/2020 | 6/10/2020 | P | PASS |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// 2.3
|
BLD-Final | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | PART |
Tony Young
|
|
|
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// ok pending engineer letter,, drainage
|
BLD-Final | 4/3/2020 | 4/6/2020 | 4/6/2020 | P | NR |
Tony Young
|
|
|
Building Final Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// needs address, fire caulking, drainage away from foundation and vents, seal front door, cable railing engineering, water in crawl space , crawl handle
|
PubWorks Occupancy Approval | 4/3/2020 | 4/3/2020 | 4/3/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage (including roof drainage connection to the subdivision system and stabilization) is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 10/28/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Tony Young
|
|
|
Insulation Inspection. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Framing/Rough-in | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Tell Riley
|
|
|
Soffit and Sheetrock Phone #: ###-#### Inspection requested via web by Clayton Conner//soofits ok per detail on plans//will fire caulk can lights//WIP as they work around the house//ok to continue//
|
BLD-Framing/Rough-in | 10/24/2019 | 10/25/2019 | 10/24/2019 | A | CANC |
Tony Young
|
|
|
Soffit and Facia Inspection. Thank you! Phone #: ###-#### >> Inspection requested via web by Clayton Conner Inspection cancelled from web by: Clayton Conner
|
BLD-Framing/Rough-in | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Dave Hannah
|
|
|
Framing Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
|
BLD-Wall Bracing | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Tony Young
|
|
|
Shear Wall Inspection. Thank you. Phone #: ###-#### Inspection requested via web by Clayton Conner// exterior ok to cover after minor fixes
|
BLD-Foundation | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Tell Riley
|
|
|
pouring around 12--Edgar Phone #: ###-####//need to install hold downs at locations shown on plans//
|
BLD-Footing | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Dave Hannah
|
|
|
pouring at noon - ready at 9 or 10 // Edgar Phone #: ###-####
|
PubWorks Subgrade Approval | 7/22/2019 | 7/22/2019 | 7/22/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/10/2019 | | DONE |
|
|
|
emailed Clayton permits to sign
|
Inspection Record Card- Bld | | | 7/10/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/9/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 6/13/2019 | 6/13/2019 | 7/9/2019 | | DONE |
|
|
|
07/02 sfd L2 ePlan. 1st complete, update code year, show BWL, egress window
|
Routing - PLAN CHECK | 7/9/2019 | | 7/9/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 7/9/2019 | | 7/9/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 7/9/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 7/8/2019 | | 7/8/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 6/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 6/14/2019 | | 6/28/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks
|
Routing - PLAN CHECK | 6/13/2019 | | 6/27/2019 | | FAIL |
Jenny Nelson
|
|
|
Code year, egress window, show BWL on main flr plan
|
Routing - MECHANICAL | 6/17/2019 | | 6/17/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 6/13/2019 | 6/16/2019 | 6/14/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/13/2019 | | 6/14/2019 | | FAIL |
Chad Schwendiman
|
|
|
Component construction doesn't match the submitted plans.
|
Routing - Addressing | 6/13/2019 | | 6/14/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/13/2019 | | 6/14/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - FIRE | 6/13/2019 | 6/13/2019 | 6/13/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required.
|
Routing - Erosion and Sediment | 6/13/2019 | | 6/13/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
Clayton Conners RP is expired, sent him message to register for class. OK to issue permit when he has registered and has class scheduled.
|
Routing - PLANNING | 6/13/2019 | | 6/13/2019 | | PASS |
Jeff Lowe
|
|
|
eaves cannot extend more than 2-feet into setback
|
CHANGE STATUS TO (PND) | | | 6/13/2019 | | DONE |
|
|
|
accidentally routed before fees were paid
|
Intake Approval | | | 6/13/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/13/2019 | | DONE |
|
|
|
|