Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-02189
StatusFinaled
Name CONNER CONSTRUCTION LLC
Site Address 3822 N SANDPOINT WAY
Project NameThiry Residence
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **WUI FOOTHILLS ZONE A** **PRESCRIPTIVE ENERGY REQUIREMENTS**Permit for the construction of a new 3604 sq. ft., two story (first story 2433 sq. ft., second story 1171 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 460 sq. ft. of covered patio/porch and a 990 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. JJN ***SPRINKLERS ARE NOT REQUIRED***LGMA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/11/20206/11/20206/11/2020PPASS
DetailsTony Young
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
DOC - Permit Finaled6/11/20206/11/20206/11/2020PPASS
DetailsTony Young
BLD-Final6/10/20206/10/20206/11/2020PPASS
DetailsTony Young
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
BLD-Final6/5/20206/8/20206/10/2020APEND
DetailsTony Young
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
BLD-Final6/9/20206/9/20206/10/2020PPEND
DetailsTony Young
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk
BLD-Blower Door Test Results6/9/20206/9/20206/10/2020PPASS
DetailsTony Young
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// 2.3
BLD-Final6/4/20206/5/20206/5/2020APART
DetailsTony Young
Final Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// ok pending engineer letter,, drainage
BLD-Final4/3/20204/6/20204/6/2020PNR
DetailsTony Young
Building Final Inspection Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk// needs address, fire caulking, drainage away from foundation and vents, seal front door, cable railing engineering, water in crawl space , crawl handle
PubWorks Occupancy Approval4/3/20204/3/20204/3/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage (including roof drainage connection to the subdivision system and stabilization) is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Energy code compliance10/28/201910/29/201910/29/2019PPASS
DetailsTony Young
Insulation Inspection. Thank you! Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Framing/Rough-in10/24/201910/25/201910/25/2019APASS
DetailsTell Riley
Soffit and Sheetrock Phone #: ###-#### Inspection requested via web by Clayton Conner//soofits ok per detail on plans//will fire caulk can lights//WIP as they work around the house//ok to continue//
BLD-Framing/Rough-in10/24/201910/25/201910/24/2019ACANC
DetailsTony Young
Soffit and Facia Inspection. Thank you! Phone #: ###-#### >> Inspection requested via web by Clayton Conner Inspection cancelled from web by: Clayton Conner
BLD-Framing/Rough-in10/22/201910/22/201910/22/2019PPASS
DetailsDave Hannah
Framing Inspection Phone #: ###-#### Inspection requested via web by Clayton Conner
BLD-Wall Bracing9/23/20199/24/20199/24/2019APART
DetailsTony Young
Shear Wall Inspection. Thank you. Phone #: ###-#### Inspection requested via web by Clayton Conner// exterior ok to cover after minor fixes
BLD-Foundation7/29/20197/30/20197/30/2019APASS
DetailsTell Riley
pouring around 12--Edgar Phone #: ###-####//need to install hold downs at locations shown on plans//
BLD-Footing7/24/20197/25/20197/25/2019APASS
DetailsDave Hannah
pouring at noon - ready at 9 or 10 // Edgar Phone #: ###-####
PubWorks Subgrade Approval7/22/20197/22/20197/22/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  7/10/2019 DONE
emailed Clayton permits to sign
Inspection Record Card- Bld  7/10/2019 DONE
OVERRIDE  7/9/2019  
Plan assigned to (J_N)6/13/20196/13/20197/9/2019 DONE
Details
07/02 sfd L2 ePlan. 1st complete, update code year, show BWL, egress window
Routing - PLAN CHECK7/9/2019 7/9/2019 PASS
DetailsJenny Nelson
Routing PW Grading-Hillside7/9/2019 7/9/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

PLANS/APPL TAKEN TO FRONT DESK  7/9/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  7/9/2019 DONE
Routing PW Grading-Hillside7/8/2019 7/8/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
1st review completed  6/28/2019 DONE
DetailsJenny Nelson
Routing PW Grading-Hillside6/14/2019 6/28/2019 FAIL
DetailsMelissa Jannusch
See changemarks
Routing - PLAN CHECK6/13/2019 6/27/2019 FAIL
DetailsJenny Nelson
Code year, egress window, show BWL on main flr plan
Routing - MECHANICAL6/17/2019 6/17/2019 PASS
DetailsChad Schwendiman
Route to Impact Fee Review6/13/20196/16/20196/14/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL6/13/2019 6/14/2019 FAIL
DetailsChad Schwendiman
Component construction doesn't match the submitted plans.
Routing - Addressing6/13/2019 6/14/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/13/2019 6/14/2019 PASS
DetailsMorgan Webb
Routing - FIRE6/13/20196/13/20196/13/2019 PASS
DetailsLee G Meredith
Sprinklers are not required.
Routing - Erosion and Sediment6/13/2019 6/13/2019 PASS
DetailsMichael Zawacki
Site prep inspection required.
Clayton Conners RP is expired, sent him message to register for class. OK to issue permit when he has registered and has class scheduled.
Routing - PLANNING6/13/2019 6/13/2019 PASS
DetailsJeff Lowe
eaves cannot extend more than 2-feet into setback
CHANGE STATUS TO (PND)  6/13/2019 DONE
accidentally routed before fees were paid
Intake Approval  6/13/2019 PASS
Recd Pcfee & Taken To Pln CK  6/13/2019 DONE