BLD-Final | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Jim Storey
|
|
|
Garage code is 1500 or side door should be unlocked. Please call with any questions. Thanks Phone #: ###-#### Inspection requested via web by Joseph knight
|
DOC - Permit Finaled | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 3/25/2020 | 3/25/2020 | 3/25/2020 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Energy code compliance | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Tony Young
|
|
|
Garage code is 1500, or side door will be unlocked. Plans are on the table inside. If you have any questions feel free to call if I''m not there Phone #: ###-#### Inspection requested via web by Joseph knight
|
BLD-Framing/Rough-in | 1/22/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Dave Hannah
|
|
|
Garage code is 1500 if closed, plans are on the table. please call if you have any questions. Would like to insulate tomorrow. Phone #: ###-#### Inspection requested via web by Joseph knight
|
BLD-Wall Bracing | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/3/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph knight
|
BLD-Foundation | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Dave Hannah
|
|
|
wall // Annie Phone #: ###-####
|
BLD-Footing | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PART |
Tony Young
|
|
|
Annie-concrete schedule for 11am Phone #: ###-####,, work in progress,, ok to pour when ready
|
Issue PAID IN FULL permit | | | 6/24/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/21/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/20/2019 | 6/20/2019 | 6/21/2019 | | PASS |
Josh Bogle
|
|
|
6/26 garage, paper - 1st done
|
Inspection Record Card- Bld | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/21/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 6/21/2019 | | DONE |
|
|
|
spoke with Joseph at ###-#### to informed him of fees and that is ready for pick up
|
Routing Walk-In (Zoning) | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
KayCee Babb
|
|
|
DRH19-00118
|
Routing Walk-In (BLD) | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Josh Bogle
|
|
|
took in awaiting engineering for tall-wall, lateral
|
Routing - PLAN CHECK | 6/20/2019 | | 6/20/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/20/2019 | | DONE |
Josh Bogle
|
|
|
|
Application received | | 6/20/2019 | | | |
|
|
|
|