Permit Information
Permit NumberBLD19-02703
StatusIssued
Name MCMILLEN LLC
Site Address 1001 N AMERICANA BLVD
Project NameKathryn Albertson Park Improve
Customer Number 
ePlanReviewYes
Description
***PROJECT MANAGEMENT-Angie Brosious***The City of Boise is proposing to provide maintenance on existing facilities, installation of pollinator meadows, and improve key features of Kathryn Albertson Park (KAP) as part of the KAP Improvements (Project). The Project is needed because there have been no major site improvements since original construction of the park in 1989. Specific goals that are intended to be met as part of the project include maintaining and improving existing facilities, improving access and visitor experience at key locations within the park, enhancing pollinator habitat, and providing stormwater runoff capture and filtration.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/6/20207/6/20207/6/2020PPART
DetailsTell Riley
Kyle Phone #: ###-####//project appears to be completed per the drawing and scope//railings/guards installed in locations required on plans//need special inspection report for complete final//
PubWorks Occupancy Approval7/2/20207/2/20207/2/2020 DONE
DetailsTiffany Lowery
Zoning Approval6/17/20206/17/20206/17/2020 DONE
DetailsLeon Letson
OVERRIDE  9/24/2019  
Issue PAID IN FULL permit  9/24/2019 DONE
Print Occupancy Form  9/24/2019 DONE
Permit Ready to Issue  9/24/2019 DONE
all met and emailed otto@mcmjac.com CAN NEED
RP-met
GC FORM-met
REVISED VALUE-met
Plan assigned to (CDM)8/2/20198/2/20199/23/2019 PASS
DetailsCarl D Madsen
09/12 (Resub) 09/06 Albertson Park L-3
Routing Off Site - STRUCTURAL9/16/2019 9/23/2019 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/23/2019 DONE
Routing - PLAN CHECK9/4/2019 9/10/2019 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL9/4/2019 9/10/2019 FAIL
DetailsCarl D Madsen
Plan resubmittals received  9/4/2019 DONE
DetailsJoe Bruce
Plans receied in ePlan. **JHB**
Route to Impact Fee Review8/26/20198/29/20198/27/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - FIRE8/2/20198/2/20198/26/2019 PASS
DetailsErika Akin
No comments attached. No structures contrusted under this permit. No change to exisitng FD access.
1st review completed  8/26/2019  
Routing Off Site - STRUCTURAL8/2/2019 8/24/2019 FAIL
DetailsCarl D Madsen
KPFF
Routing - PLAN CHECK8/2/2019 8/24/2019 FAIL
DetailsCarl D Madsen
Routing PW Drainage8/2/2019 8/22/2019 PASS
DetailsJason C. Taylor
Routing PW Flood Plain8/5/2019 8/21/2019 PASS
DetailsJason C. Taylor
Routing - Erosion and Sediment8/2/2019 8/6/2019 PASS
DetailsAndy J. Long
see also ESC19-00106 for KAP improvement. Site preparation inspection is required.
Routing - PLANNING8/2/2019 8/5/2019 PASS
DetailsBrent Moore
Routing - Addressing8/2/2019 8/5/2019 PASS
DetailsDoug Chausow
Routing PW Street Lights8/2/2019 8/5/2019 PASS
DetailsTom Marshall
Routing - PUBLIC WORKS8/2/2019 8/2/2019 PASS
DetailsAngela Hardy
Intake Approval  7/30/2019  
Intake Approval  7/24/2019 FAIL
DetailsBrian McGowan
Please provide the following in order for your Prescreen to be approved:
1. The C, ESC, S and SP Drawing Sheets did not provide the required space and location on the Drawing for the City Approval Stamp. Please revise your Title Block as needed.
2. C001, C100 thru C114, G001, G002, G003, G004, GC001, GC002, EC001, EC002, EC003 are noted as "NOT FOR CONSTRUCTION" in the Title Block. Please remove and resubmit drawings.
3. Please verify the Land Use Zone designation on G001. It is Noted as “Open Space”.
4. I could not locate Sheet GS01. Upload Sheet GS01 that contains the Code Analysis and Building Data.

Application received  7/19/2019 DONE
Application submitted via PDS Online on Jul 19 2019 12:08PM