Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD19-03737
StatusIssued
Name WR GANN COMPANY
Site Address 205 W HIGHLAND VIEW DR
Project NameFery's Highland View Residence
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION 02/11/20 - updating grading and drainage due to landscaping changes. Updated ESC plans. JJN** **W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 6219 sq. ft., three story (first story 4486 sq. ft., second story 416 sq. ft. and basement is 1317 sq.ft) single family dwelling with 3 bedrooms, 3 and 2 powder bathrooms, approximately 570 sq. ft. of covered patio/porch and a 1993 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJN ***Sprinklers are being provided***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/6/20208/6/20208/6/2020PPASS
DetailsTony Young
Bill - *//Screened*// Phone #: ###-####// ok to cover all
BLD-Energy code compliance7/27/20207/27/20207/27/2020PPART
DetailsTony Young
Screened- Bill Phone #: ###-####// ok except for fireplace area
BLD-Framing/Rough-in7/6/20207/6/20207/6/2020PPART
DetailsTony Young
Bill *screened* Phone #: ###-####// soffit base fire treated plywood ok,, fire treated cedar soffit materian noted on site// needs mechanical pass but ok to insulate unaffected areas// needs another ok on sprinklers// structural engineer of record has walked site and okayed as built
BLD-Aging Inspection6/4/20206/4/20206/8/2020 PASS
DetailsTony Young
BLD-Aging Inspection6/3/20206/3/20206/8/2020 PASS
DetailsTony Young
BLD-Other5/28/20205/29/20205/29/2020APASS
DetailsTony Young
soffit - screened // Bill Phone #: ###-####
BLD-Conference5/27/20205/28/20205/28/2020APASS
DetailsTony Young
screened - siding and fireplace hearth // Bill Phone #: ###-####,, ?s on clearence on epay wood,, ok,, fireplace,, needs specs or ok from manf.
BLD-Conference5/12/20205/13/20205/13/2020APASS
DetailsTony Young
screened // handrails and landscaping - Bill Phone #: ###-####,, no guardrail needed out along boulder landscape wall
BLD-Conference4/29/20204/29/20204/29/2020PPASS
DetailsTony Young
Walt Gann; Phone #: ###-####,, will use a commercial grade painted ok exterior cover
BLD-Wall Bracing4/16/20204/17/20204/17/2020APEND
DetailsBrandon Shaw
See plans for missing hold down, marked in red...
See shear schedule for walls requiring /spacing of A-35 clips...
To be installed before framing f\rough-in...
CHANGE STATUS TO (ISS)  3/24/2020 DONE
OVERRIDE  3/9/2020  
Plan assigned to (J_N)1/31/20201/31/20203/9/2020 DONE
DetailsJenny Nelson
1st complete 02/07 Plan mod - waiting on hillside review
Routing PW Grading-Hillside3/9/2020 3/9/2020 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

PLANS/APPL TAKEN TO FRONT DESK  3/9/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  3/9/2020 DONE
plan mod approved
Routing PW Grading-Hillside2/11/2020 2/21/2020 FAIL
DetailsMelissa Jannusch
Slope stability analysis and updated boulder wall calculations. see changemarks in ePlan.
Routing - PLAN CHECK2/11/2020 2/12/2020 PASS
DetailsJenny Nelson
Routing - Erosion and Sediment2/11/2020 2/11/2020 PASS
DetailsMichael Zawacki
BLD-Final1/29/20201/31/20201/31/2020ACANC
DetailsDave Hannah
Donna Phone #: ###-####
Plan Modification Accepted  1/31/2020 DONE
grading and drainage modifications due to landscape changes
BLD-Foundation1/21/20201/21/20201/21/2020PPART
DetailsTony Young
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro // retaining walls on the west side ok,, work in progress
BLD-Foundation1/10/20201/13/20201/13/2020APASS
DetailsBrandon Shaw
Work in progress...
Frost protection is reqired...
BLD-Foundation1/9/20201/10/20201/10/2020APART
DetailsTony Young
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro// mostly covered with concrete blankets.. will pour on monday
BLD-Footing12/10/201912/11/201912/11/2019APASS
DetailsDave Hannah
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing12/10/201912/10/201912/10/2019PCANC
DetailsBrandon Shaw
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro Inspection cancelled via mobile web on Tuesday, December 10, 2019.
PubWorks Subgrade Approval12/10/201912/10/201912/10/2019 DONE
DetailsMelissa Jannusch
*Residential footings* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  11/7/2019  
Issue PAID IN FULL permit  11/7/2019 DONE
Inspection Record Card- Bld  11/7/2019 DONE
Permit Ready to Issue  11/7/2019 DONE
met
Plan assigned to (J_N)10/7/201910/7/201911/6/2019 DONE
Details
10/24 sfd L2 ePlan. 2nd review complete, hillside correction. 1st complete, engineering inconsistencies
Routing PW Grading-Hillside11/6/2019 11/6/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

PLANS/APPL TAKEN TO FRONT DESK  11/6/2019 DONE
DetailsJenny Nelson
Routing - MECHANICAL11/4/2019 11/4/2019 PASS
DetailsTroy James
Routing PW Grading-Hillside11/4/2019 11/4/2019 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Routing - PLAN CHECK11/4/2019 11/4/2019 PASS
DetailsJenny Nelson
Routing - MECHANICAL10/29/2019 10/31/2019 FAIL
DetailsTroy James
See eplan. Emailed corrections to TML and applicant.
1st review completed  10/21/2019 DONE
DetailsJenny Nelson
Routing PW Grading-Hillside10/7/2019 10/18/2019 FAIL
DetailsMelissa Jannusch
see changemarks in ePlan
Routing - PLAN CHECK10/7/2019 10/18/2019 FAIL
DetailsJenny Nelson
Structural calcs and plans not matching, need siding specs
Routing - PLANNING10/7/2019 10/14/2019 PASS
DetailsNicolette Womack
Routing - MECHANICAL10/7/2019 10/10/2019 FAIL
DetailsTroy James
Emailed corrections to TML
Route to Impact Fee Review10/7/201910/10/201910/8/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - FIRE10/7/201910/7/201910/7/2019 PASS
DetailsErika Akin
Fire sprinklers are being provided, as noted on the floor plan general notes. No comments.
Routing - Addressing10/7/2019 10/7/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/7/2019 10/7/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment10/7/2019 10/7/2019 PASS
DetailsMichael Zawacki
Hillside lot, site prep inspection required.
Intake Approval  10/7/2019 PASS
Recd Pcfee & Taken To Pln CK  10/7/2019 DONE
Intake Approval  9/30/2019 FAIL
Milton called-plans still not turned-i deleted the A drawings and Tisha killed the work flow so it would go back to him and he can re load the A's.
Intake Approval  9/25/2019 FAIL
Called Merlin to let know drawings need rotated and they need uploaded so we can scroll in and out to do a better prescreen correctly-left message on his phone-called back and will fix-i was having trouble reading the drawings so hope I got all
Application received  9/23/2019 DONE
Application submitted via PDS Online on Sep 23 2019 8:06AM